Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17296A363 + (Forwards PNO-79-67L)
- ML19263D853 + (Forwards PNO-79-67M)
- ML13316A409 + (Forwards PNO-79-67M)
- ML16340A406 + (Forwards PNO-79-67M)
- ML20062H061 + (Forwards PNO-79-67N)
- ML19263D859 + (Forwards PNO-79-67N)
- ML19263D870 + (Forwards PNO-79-67P)
- ML19263D873 + (Forwards PNO-79-67P)
- ML19207A127 + (Forwards PNO-79-67P)
- ML17296A325 + (Forwards PNO-79-67Q)
- ML17272A372 + (Forwards PNO-79-67Q)
- ML19220C498 + (Forwards PNO-79-67Q,R,S & T Related to TMI-2 Incident. W/O Encl)
- ML17296A365 + (Forwards PNO-79-67R)
- ML17272A449 + (Forwards PNO-79-67R)
- ML17272A421 + (Forwards PNO-79-67S)
- ML17296A352 + (Forwards PNO-79-67S)
- ML17296A364 + (Forwards PNO-79-67T)
- ML17272A447 + (Forwards PNO-79-67T)
- ML20062H129 + (Forwards PNO-79-67T Correction)
- ML17272A419 + (Forwards PNO-79-67U)
- ML19220C497 + (Forwards PNO-79-67U,V & W Related to TMI-2 Incident. W/O Encl)
- ML17272A391 + (Forwards PNO-79-67V & W)
- ML17296A338 + (Forwards PNO-79-67V & W)
- ML17296A336 + (Forwards PNO-79-67X)
- ML17272A393 + (Forwards PNO-79-67X)
- ML19220C495 + (Forwards PNO-79-67X & Y Related to TMI-2 Incident.W/O Encl)
- ML17272A395 + (Forwards PNO-79-67Y)
- ML17296A339 + (Forwards PNO-79-67Y)
- ML17296A337 + (Forwards PNO-79-67Z)
- ML17272A394 + (Forwards PNO-79-67Z)
- ML17296A334 + (Forwards PNO-79-77(NRR))
- ML17272A388 + (Forwards PNO-79-77(NRR))
- ML19269D291 + (Forwards PNO-79-77(NRR))
- ML18081A877 + (Forwards PNO-I-79-20,re Reactor Coolant Sys Leakage During Plant Heatup.Submits List of Addl PNOs for Document Control)
- ML17208A695 + (Forwards PNO-II-80-104 Re 800611 Loss of Component Cooling Water to Reactor Coolant Pumps.Nrc Will Supplement Bl Spiegel Dec 1970 Testimony Re Loss of Cooling Water to Cartridge Seal Assembly)
- ML20128E032 + (Forwards PNO-III-75-016 Re Cracked Fuel Pins in Spent Fuel Assemblies)
- ML20128E036 + (Forwards PNO-III-75-016 Re Cracked Fuel Pins in Spent Fuel Assemblies)
- ML20031A579 + (Forwards PNO-III-81-067 Re Radioactive Liquid Discharge Via Unmonitored Storm Sewer.Inquires Whether Such Paths Should Not Be Continuously Monitored,Based on Similar Experiences at Millstone & Tsuruga Reactors)
- ML20214A703 + (Forwards PNO-III-85-058,PNO-III-85-058A & PNO-III-85-070 Re 850702 Criticality Incident at Facility.Ofc of Inspector & Auditor Investigation of Region III Performance Re Event Requested.W/O Stated Encls.Related Info Encl)
- IR 05000285/1984013 + (Forwards PNO-IV-85-44C,per Request Re Steam Generator Tube Failure.Discussion of Failure Included in Insp Repts 50-285/84-13 & 50-285/84-14.PDR Should Be Contacted Re Addl Info)
- ML20032A488 + (Forwards PNO-V-81-059)
- ML19206B324 + (Forwards PNOs & IE Bulletins Re TMI Incident)
- PY-CEI-NRR-1917, Forwards PNPP Safety Evaluation Summary Per 10CFR50(B)(2) for 1994. Rept of Facility Changes,Tests & Experiments + (Forwards PNPP Safety Evaluation Summary Per 10CFR50(B)(2) for 1994. Rept of Facility Changes,Tests & Experiments)
- PY-CEI-NRR-1965, Forwards PNPP Simulator Four Yr Test Rept, Describing Performance Testing Conducted from June 1991 - June 1995, Including Discussion of Uncorrected Simulator Performance Test Failures & Schedule for Correcting Failures + (Forwards PNPP Simulator Four Yr Test Rept, Describing Performance Testing Conducted from June 1991 - June 1995, Including Discussion of Uncorrected Simulator Performance Test Failures & Schedule for Correcting Failures)
- ML20205A130 + (Forwards PNPS ISI Plan for 1999 on-line & 1999 RFO 12 Exams. On-line Exams Scheduled to Be Conducted During 1999.RFO 12 Scheduled to Begin on 990508)
- ML16340E039 + (Forwards PNS-V-83-013 Re Persons Charged for Illegal Drug Activities.No Operations or Armed Guard Force Personnel Involved.Charges Concern Util,Pinkerton,Foley & Pullman Employees)
- ML20081A771 + (Forwards POSI-SEAL Intl,Inc, LOCA & Seismic Analysis, Brunswick Steam Electric Plant, to Demonstrate Valve Operability,In Response to NRC 831201 Request)
- PLA-3989, Forwards PP&L Annual Rept 1992 & Allegheny Electric Cooperative,Inc Annual Rept 1992 + (Forwards PP&L Annual Rept 1992 & Allegheny Electric Cooperative,Inc Annual Rept 1992)
- ML17158A264 + (Forwards PP&L Annual Rept 1993 & Allegheny Electric Cooperative,Inc Annual Rept 1993.)
- PLA-4131, Forwards PP&L Annual Rept 1993 & Allegheny Electric Cooperative,Inc Annual Rept 1993 + (Forwards PP&L Annual Rept 1993 & Allegheny Electric Cooperative,Inc Annual Rept 1993)
- ML17164A635 + (Forwards PP&L Technical Rept NE-92-01, Technical Basis for PP&L Approach to ATWS Procedural Guidance)
- ML19270H654 + (Forwards PPI-TR-7701, U-Form Radwaste Solidification Sys, Revision 1)