Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214P508 + (Forwards Final Versions of Position Papers on Nrc/Idcor Technical Issues 4,9,10,12,13B,15 & 16.Topics Include Fission Product & Aerosol Deposition in Primary Sys & in Containment & Retention of Fission Products in Ice Bed)
- ML20214P510 + (Forwards Final Versions of Position Papers on Nrc/Idcor Technical Issues 4,9,10,12,13B,15 & 16.Topics Include Fission Product & Aerosol Deposition in Primary Sys & in Containment & Retention of Fission Products.Record Copy)
- ML20210U894 + (Forwards Final Versions of Position Papers on Nrc/Idcor Technical Issues 1,2,3,5,6,11,13A & 17.Topics Include Fission Product Release Prior to Vessel Failure & Hydrogen Ignition & Burning)
- ML20005D857 + (Forwards Final Versions of Two Field Notices Recently Prepared to Provide Addl Info Re Info Notice 89-066)
- ML19332F183 + (Forwards Final Versions of Two Field Notices to Provide Addl Info Re NRC Info Notice 89-066)
- ML19332C264 + (Forwards Final Vicinity Property Mgt & Implementation Manual (Vpmim) Directives E5 & E7.Future Final Directives Will Not Be Issued Until Project Ofc in Receipt of Encl Transmittal of Documents Form)
- ML20133N332 + (Forwards Final WM-8XXX Draft Staff Technical Position on Testing & Insp Plans During Const of DOE Remedial Action at Inactive U Mill Tailing Site.)
- ML20133N329 + (Forwards Final WM-8XXX Draft Staff Technical Position on Testing & Insp Plans During Const of DOE Remedial Action at Inactive U Mill Tailing Site)
- ML20059K175 + (Forwards Final Water Analyses for Lowman,Id Umtra Site,Apr 1993 Water Sampling)
- ML20080C262 + (Forwards Final Weld Insp & Repair Results.Final Disposition of Welds Found W/Crack Indications,Results of Exam of Plug Removed from Weld & Radiographs of Weld & Modified Repair Program Also Encl)
- B11506, Forwards Final long-form Lists of Initial Sqrt & Pvort Items Audited During 850304-08 + (Forwards Final long-form Lists of Initial Sqrt & Pvort Items Audited During 850304-08)
- ML20041G419 + (Forwards Final post-accident Monitoring Instrumentation List & Design Criteria for Compliance W/Reg Guide 1.97)
- ML19343B754 + (Forwards Final post-operational Repts 13 & 14 Re Conowingo Pond Ecology for Jul-Dec 1979 & Jan-Apr 1980,respectively)
- ML20137A388 + (Forwards Final re-draft Per Changes to Cleveland Ltr)
- ML18150A118 + (Forwards Final rept,EGG-NTA-7625, Conformance to Item 2.1 (Part 2) Generic Ltr 83-28,Reactor Trip Sys Vendor Interface,North Anna 1 & 2 & Surry 1 & 2.)
- ML18150A117 + (Forwards Final rept,EGG-NTA-7625, Conformance to Item 2.1 (Part 2) Generic Ltr 83-28,Reactor Trip Sys Vendor Interface,North Anna 1 & 2 & Surry 1 & 2)
- ML19312A157 + (Forwards Final rept,NRC-HNP-A-021,on Wiring Discrepancies in High Pressure Core Spray Diesel Generator Control Switchgear)
- ML19276F642 + (Forwards Final rept,NRC-HNP-A-021,on Wiring Discrepancies in High Pressure Core Spray Diesel Generator Control Switchgear)
- ML20132F979 + (Forwards Final rule,SP-96-122,re Environ Review for Renewal of Nuclear Power Plant Operating Licenses)
- ML20197J551 + (Forwards Final, EA of Remedial Action at Lowman U Mill Tailing Site,Near Lowman,Id. Finding of No Significant Impact Also Encl)
- ML20070Q178 + (Forwards Final, Exercise of Offsite Radiological Emergency Response Plans, for State of Ks & Affected Local Jurisdictions site-specific to Plant.No Deficiencies Identified During 931201 Exercise.W/O Encl)
- ML20035A314 + (Forwards Final, Quadrex Corp Project Rept for Decontamination & Survey for Unconditional Release of Reactor Room in Taylor Hall at Univ of Texas,Austin,Tx. Rept Sent to Suppl 921217 Request for License Termination)
- ML20198M977 + (Forwards Final, Remedial Action Plan, for Mexican Hat,Ut. in Order to Support Review of RAP & RAP Mod,Listed Repts Also Encl)
- ML19260E189 + (Forwards Final, Rept to NRC on Effect of Installing Core Region Constraint Devices on Seismic Response of Facility Core. Unchanged from Draft Version.Submits Response to Structural Engineering Branch Comments)
- ML19260E190 + (Forwards Final, Rept to NRC on Effect of Installing Core Region Constraint Devices on Seismic Response of Facility Core. Unchanged from Draft Version.Submits Response to Structural Engineering Branch Comments)
- ML20045G542 + (Forwards Final,Draft NRC Acquisition Regulation.Revs Listed for Comment)
- L-99-113, Forwards Final,Typed TS Pages for LARs 262 & 135,previously Submitted with Editorial Changes Identified by + (Forwards Final,Typed TS Pages for LARs 262 & 135,previously Submitted with Editorial Changes Identified by)
- ML20215F091 + (Forwards Finalized Case Study Rept on Effects of Ambient Temp on Electronic Components in Safety-Related Instrumentation & Control Sys. W/O Encl)
- 3F0299-12, Forwards Finalized Framatome Technologies Inc,(Fti) Document 86-1266272-01, Post-LOCA Boron Concentration Mgt for CR-3. Rept Needed by NRC Staff to Complete Review of LAR 223 + (Forwards Finalized Framatome Technologies Inc,(Fti) Document 86-1266272-01, Post-LOCA Boron Concentration Mgt for CR-3. Rept Needed by NRC Staff to Complete Review of LAR 223)
- ML20107A724 + (Forwards Finalized Objectives & Guidelines for 1984 Emergency Preparedness Field Exercise Scheduled for 841114)
- LD-96-029, Forwards Finalized Package of Six Draft Changes to Sys 80+ Std Plant Design Control Document.Changes Will Be Formally Incorporated Into Sys 80+ Design Control Document at Conclusion of Design Certification Rulemaking + (Forwards Finalized Package of Six Draft Changes to Sys 80+ Std Plant Design Control Document.Changes Will Be Formally Incorporated Into Sys 80+ Design Control Document at Conclusion of Design Certification Rulemaking)
- ML20072A371 + (Forwards Finalized Rept Re Emergency Preparedness Insp Followup on 830516-20.Procedures for Containment Air Sampling Completed & Implemented)
- ML20069M218 + (Forwards Finalized Rept Re Followup Insp at Facility During Wk of 830410.Areas Included post-accident sampling,high- Range Containment monitors,high-range Effluent Monitors, Training,Dose Assessment & in-plant Survey Procedures)
- ML20247F621 + (Forwards Finalized Setpoint Calculations & Safety Margin Conclusions for Safety Insp Significant Item 2)
- ML20151L017 + (Forwards Finalized Task Action Plan for Resolution of Generic Issue 93, Steam Binding of Auxiliary Feedwater Pumps. Progress on Schedule)
- ML20087E715 + (Forwards Finalized Updated App a to Radiological Emergency Plan Describing Emergency Classification & Action.Rev Will Be Included in Future Amend to OL Application)
- ML20134H584 + (Forwards Finalized Version of Schedules a & B for Facility. Schedules Support 850429 Requested License Amend Re long-term Planning)
- ML20210C774 + (Forwards Finalized Versions of Revs to Parts 3 & 4 of Colorado Rules & Regulations Pertaining to Radiation Control,Which Were Adopted by Colorado Board of Health on 990519)
- ML18017B452 + (Forwards Financial & Contractual Agreement Info & Exhibits Reflecting Addition of Nc Municipal Power Agency Number 3 as co-owner of Facilities,In Support of Applications for Revisions to CPs & OLs)
- ML18017B453 + (Forwards Financial & Contractual Agreement Info & Exhibits Reflecting Addition of Nc Municipal Power Agency Number 3 as co-owner of Facilities,In Support of Applications for Revisions to CPs & OLs)
- ML20056B662 + (Forwards Financial & Statistical Info Supplementing 1975 Annual Rept to Shareholders)
- ML20056B982 + (Forwards Financial & Statistical Info, as Suppl to 1973 Annual Rept to Shareholders)
- ML20211P082 + (Forwards Financial & Statistical Repts & Audited Financial Statements for Cepc,For 1994,1995 & 1996,as Requested by Ma Dusaniwskyj.Matl for Use in Review of Application to Transfer 30 Percent Ownership to Entergy Gulf States,Inc)
- ML19339D021 + (Forwards Financial & Statistical Review from 1969-79 for Util & Subsidiary Companies)
- ML20245G717 + (Forwards Financial Assurance Guidance, Std Format & Content Guide for Financial Assurance Mechanisms Required for Decommissioning Under 10CFR30,40,70 & 72 & Requests That Document Be Prepared as Draft Regulatory Guide)
- ML20199B834 + (Forwards Financial Assurance Instrument Security Recently Performed by TC Johnson.Evaluation Indicates Number of Items Applicable to Licensing Branch Projects That Need to Be Corrected.Corrective Actions Requested by 980213)
- ML20199A717 + (Forwards Financial Assurance Instrument Security Evaluation Recently Performed by TC Johnson.Evaluation Indicates Number of Items Applicable to Matls Decommissioning Section Projects,Need to Be Corrected)
- ML20199A773 + (Forwards Financial Assurance Instrument Security Evaluation Recently Performed by TC Johnson.Evaluation Indicates Number of Items Applicable to Facilities Decommissioning Section Projects,Need to Be Corrected)
- ML20126K341 + (Forwards Financial Assurance Instruments of Decommissioning Funding Plan)
- RA-97-057, Forwards Financial Cost Documents Needed to Satisfy Requirement for Periodic Update (Every Three Yrs) of Estimated Cost of Decommissioning + (Forwards Financial Cost Documents Needed to Satisfy Requirement for Periodic Update (Every Three Yrs) of Estimated Cost of Decommissioning)
- ML20128B254 + (Forwards Financial Data Portion of Amend 16,dtd 690822 to Application for Ol,For Review)