ML20134H584

From kanterella
Jump to navigation Jump to search
Forwards Finalized Version of Schedules a & B for Facility. Schedules Support 850429 Requested License Amend Re long-term Planning
ML20134H584
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/20/1985
From: Cutter A
CAROLINA POWER & LIGHT CO.
To: Vassallo D
Office of Nuclear Reactor Regulation
References
NLS-85-284, NUDOCS 8508290046
Download: ML20134H584 (12)


Text

,

~

Cp&L Carolina Power & Light Company SERIAL: NLS-85-284 AUG 2 01983 Director of Nuclear Reactor Regulation Attention: Mr. D. B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing

. United States Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 & 50-324/ LICENSE NOS. DPR-71 & DPR-62 LONG RANGE INTEGRATED SCHEDULE

Dear Mr. Vassallo:

In accordance with our commitment made in a meeting with your staff on August 1, 1985, Carolina Power & Light Company hereby submits the finalized version of Schedules A and B for the Brunswick Steam Electric Plant Unit Nos. I and 2. These schedules support our requested license amendment regarding long-term planning submitted on April 29,1985.

As indicated by footnote 6 of Schedule A, the attached schedules assume approval of our extension request for environmental qualification of electrical equipment for Brunswick-2. This request was filed with the Commission on July 9,1985.

The implementation dates shown for Emergency Response Capability - NUREG-0737 Supplement 1 (see page 3 of Schedule B), supersede the schedule provided in our letter of December 27,1984. Should the EQ extension request be denied, the SPDS/ERFIS schedule will need to be re-evaluated.

As stated la aur letter of April 24,1984, three outages of sufficient duration for each unit will be required to complete the fire protection work as required by 10 CFR 50.48, Appendix R at Brunswick. We are currently on the schedule shown on Schedule A, however, this is subject to change depending on the da+e of issuance of the SER.

Carolina Power & Light Company is committed to an orderly incorporation of regulatory requirements through the implementation of an integrated schedule. The Commission recently endorsed and encouraged this approach in Generic Letter 85-07. Therefore, we request that you review and approve our proposed license amendment and schedules as soon as possible.

8508290046 850820 PDR ADOCK 05000324 \

p PDR I l 411 Fayettevtite Street

  • P. O Don 1551
  • Raleigh. N. C. 27602 w.%emagum q uoa

Mr. D. B. Vassallo

, Page.2 Please refer any questions regarding this matter to Mr. Sherwood R. Zimmerman at (919) 836-6242.

Yours very tru ,

~

s

{/

] /((fgg A. B. Cutter - Vice President Nuclear Engineering & Licensing ABC/ MAT /ccc (1811 MAT)

Attachments cc: Mr. W. H. Ruland (NRC-BNP)

Dr. 3. Nelson Grace (NRC-RII)

Mr. M. Grotenhuis (NRC)

A. B. Cutter, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, contractors, and agents of Carolina Power & Light Company, U

hN s"""'"**,,.

s

' Notary (5eal) g'f 4 " *"***v&q,,,,

My commission expires: N/r//fy , ****

l

.p/ NOTARY'g** ,g -

i ! - ) i M *. PUBLIC I 6 ! <

, ,**h h eeeeeeee .

I l

l i

l l

I l

l

1985 1986 JAN lAPR lJUL 10CT JAN lAPR IJUL 10 NOTEC , , ,

QUTAGE SCHEDULE REFUEL 4 UNIT 1 3/29 1 12/13 RFFUEL 6 UNIT 2 2/29 I ATWS - NUREb 0460.10LFR50.til UNIT i (2) 4/16 O O 10/13 UNIT 2 (L) 4/16 O O 10/12 ENVIR QUAL - IED /9018,10uFR50.49, ':ER ."/S/89 UNIT i (1,4) 9/29 0 011/1 UNIT 2 (1, b)

FIRE PROI - 10LFR$0 APP R. 10CFR$0.4d UNIT 1 (1 " 5)

UNIT 2 ( 1. 3. )

MARN I - NURFG Ob61,1/31/61 N 1/19/dd ORDER UNIT 1 (1) 011/1 JAN lAPR lJUL 10C f JAN lAPR lJUL 10 1985 1986 Na iEd.

(1) COMPLETION DATE TIED TO QUrAGE (2) DEVELOP F. CUDMIT A PROP" SED SLtiEDULE WITHIN 180 DAYG AFTER ISSUANCE OF GA GUIDELINE 9 (10CFR50.62 (d))

(3) SCHEDULE AS PROPOSED IN CP%L LETTER NLC-84-159, 4/24/d4. FINAL SC'iEDULE PENDIN3 ISSUANCE CF NRC SFA.

(4) START OF QUTAGE IS FIXED BY COMMITMENT TO COMPLETE ENVIRONMENTAL QUALIFICATION MODIFICATIONS AT THIS TIM'

'5) DUAL QUTAGE REGUIRED.

(6) PROPOSED SCHEDULE. SUPMITTAL OF FINAL SCHEDULE PENDIN3 NRC AC TION ON DEFERRAL REQUEST NLS-85-190. //9/a5 CAROLINA POWER S L BRUNSWICK STEAM ELECTRIC IMPLEMENTATION 1- AUii -n9

1987 1988 1989 JT JAN lAPR lJUL IOCT JAN lAPR IJUL IOCT JAN lAPR IJUL IOCT REFUEL 5 REFUEL 6 S/9 i NI9/25 2/4 i \1 6/16  !

REFUEL 7  ;

~

12/E6 7/2I I XI 11/11 D 61/14 04/aa E/22/9 L

T JAN lAPR IJUL IOCT JAN lAPR IJUL 10C T JAN lAPR lJUL 10CT 1987 1988 1989 LEGEND; I I OUTAGE CRITICAL PATH b\\N OUTAGE CONTINGENCY

% c.% m IGHT COMPANY TI APERTURE PLANT UNITS 182 m i

3CHEDULE A )

P{}qe 1 of i 2509%oo%-of l

1

^ '

1985 11986 JAN lAPR IJUL. 10CT IJAN lAPR lJUL lo NOTE'i , <l QUTAGE SuiEDULE RFFUEL 4 UNIT 1 3/E9 f 12/13 RFFUEL ti UNIT 2 3/d9{

J I

t3dA FEEDWATER LRALAINJ - NURE6 0019 FFFDdATER LONTROLLER AND RdCU PIPING UNIT i (1)

UNIT 2 (1) _

F# EPARaER REPLACE UNIT 2 (1)

CAD RETURN LINE CAP UNIT 1 (1. .i! __ 011/1 TMI ISSUES - NUREG 0/3/

II.F.4.1 DFDICATED HfDR06FN UNIi 1 (1) 0 11/1 NLD--3 4 N99. t>/d7/d 4 PENEfAATIGN3 UNIT P (1)

II .F. 4.d. / CN TMT ISot. HI RAD UNIT 1 (1, 41 UNIT 2 (1.4)

II.N.d.1H AD3 L0bIC UNIT 1 (1.4) Q 11/1 NLC -H 4 - 10d. d /9 /d 4 UNIT'd (1. 41 III.D.i,4 CR HAHITABILITY _O12/31 Nuu-69 125,4/15/

' EISMIC SUPPOR TS - IEH /9-Od. /9-0/ e /9-14 UNIT 1 (1. El UNIT 4 (1. 91 _

JAN lAPR IJUL !OCT JAN lAPR lJUL 6 198'i 198h Ns iE ;

't) CDfLFT!;N D ATF TIFD TD pdTA #,

fC) LPst RFLIAt!!LifY I4t FN/FfNT- -FJ81 Nvi. INFCRMAT!;N QNLY.

9.

'.0 LGD RF TUFW LINF L APPIN i %.fiFDULED F;4 AFFLYL 4, IN VF'i'FL L!ad!D PFNF TR ANT F(49 Il MJfDULFD F;5i fiFr0F f 4' PPF/1000 GQ4HFr:8)gNCFNJ d!TH Nfr. L'MMITT'D TV "JfDULF THIS ITFM IN LON o R AN # PLA1.

f") LP%l. LETTFR NLC -4 4 <.14 NG/FMtTH . 6.1%4 C;4M! fiFD TO JfDULF GM8'LFr!;N C# mad 1 IN L;N I C AN W PL AN AND IN:tUDFD INTF9t4 C'Mf'LF ,

'td DJAL UNIT UJTAGF RFgd!HFD.

f/; /JPLETICN D ATF TIFD TQ GJTAJ CLvtFr!W PLUS Tf Fl* MJNTit ft0 IfLFMFNTAT!;N DJ(ndLF 13 UNLY F A (HrF dALLG cMMIT TFD f) PF 4;DIF"!FD IN C5".L LF T TFR NLE. -9 4-1E APH!L i'/, 1% 4. .

f9? FNi!NFFHINJ DF3!.,N FFF00f F54 FLF/FN ADD!f!;NAL d4LL9 (l;) NFDLfLE OFFLFCTM t 'MMITMENT TO W4IT A PN6'ZFD 'JfDtfLF F'A IfLF4FNf 4 TIM PF4 CsN. LFiffR NLM 4 4-%6 DFJMt F0 /. LH4.

CM10 LINA Por/ER N LIL-ERUNSylILh S TEAM ELECTPIC F

[4PLEMENfATION SL

.. EAuf& H'i e--._~~_~

_.__________a-

I r

1 1987 1988 1989

T JAN lAPR IJUL 10CT JAN lAPR IJUL IOCT JAN lAPR IJUL 10CT -

REFUEL 5 REFUEL 6 S/9 I A \I9/2S 2/4 I I\ \1 6/16 d// 4/dd RFFUEL 7 L 12/26 7/2 l 11/11 0 8/7 NLS-BS-OSd.3/22/85 i f)9/23 NLS-BS-058.3/22/89 D1t/14 NLS-84-228. 6/1/84 4 SER. 6/29/84 5/9 O 08/7 NLS-89-058.3/22/d3 Q11/14 NLS-84-299, b/27/84 Oe/7 Lao-83 549.ta/tu/aa 911/14 L AP 548,12/16/B3 Q11/14 NLS-d4+102; J/9/84 5

- 08/7 NLS-84-214,11/26/84 09/:23 NLS-84-214.11/2e/84 5 . . . , , . . . , , . . .. e IT JAN lAPR IJUL 10CT JAN lAPR IJUL 10CT JAN lAPR IJUt, 10CT 1987 1988 1989 LEGEND.

Also Available om AParture Card 04 r.!LC1TQW'1 I I OUTAGE CRITICAL PATH N  !:

l\\\\l OUTAGE CONTINGENCY APERTURE CARD L l

L .

COMPANY NT UNITS i S 2 DULE D

"~

[

r Page 1 of 4

. s o 1985 1986 JAN lAPR lJUL IOCT JAN lAPR IJUL 10' NOTE 9 , , , , , ,

OUTAGE SCHEDULE PFFUEL 4 UNIT i 3/29 1 10/13 RFCUFL 6 UNIT 2 3/29 [

1 l

l HFA/HJA RELAY RES'JLUTION - IE8 84-04 l UNIT 1 (1. 4) 011/1 NLs +9-O tti. c/14/89 l UNIT 2 (1. 4)

LP IURDINE ROICR REPLACEMFNi UNIT i (1. al 3/29 Q 0 11/1 UNIT 2 (1. d) 3/29 O ELEC DIST S(S - IRANSFuRMER TAP CHANsES UNIT 1 (1. b)

UNIT C (1)

IOSGC INSPECf!ON - EENERIC LETTER M4-11 UNIT i (1) M/d9 O O 11/1 NLO -dPO 45. 4/E6 /89 UNIT 2 (1) 3/d9 O SEPVICE WATER PIPINJ REPLALFMENT (PtiASE IIII UNIT 1 (1. a UNIT 2 (1. ) . - . - -

JAN lAPR IJUL IOC f JAN lAPR lJUL 10' t4HS 1986 N ., i E .;

'11 C APLET!;4 DATE TIFD TO 00fAiF.

f) LPsL 0FL! ADILITY IMPHg/FMFNf+-FQ4 NHJ INF;nM47!;N CNLY.

f.5! LHD t FTUfW LIP L VP!C %)tFDLtFD FOR OFFUFL 4. IN V C"FL L!ad!D PFNETRANT FtAM IG "JtFDULFD FU9 AFFUFL 5.

f4) P4FVDt; L'/1HFMPgNDF9;F WITH NRG LC'.MITTED TQ FMDULF THI3 !IFM IN LCN; 049 F PLAN,

) LP .L LETTFG NL5 d4 414 N)/FMFFH 6.1H4 c'>NITTFD TO 'UtFDULF LWLET!;N CF MsD1 IN LON A RW C PLAN AND INiUDFD INTFA!M CMtE

'43 DOAL UNIT GdfAdF HFad!RFD.

f/) L'M tFrigN DATE T!FD TQ QUTAAF C;4PLET!;N PLU'; THnFF MONTH 1 fM IMFtFMFNTAT!UN 'i.JtFDULE In LNLt Ft4 fttTF WALLS Lwg!TTED TO FF MDDIFIFD IN C52%L LE f fF0 NLC w4-lO Arntt n/, gu t.

CD FN i!NEFH INJ DF"IsN EFFLAT F;H FLE/FN ADDIT!;NAL d4 LLC.

(l'/ "sjtFDULF DFFL C T'1 L WMITMFNT TQ hT4!T 4 PA>)gMFD r.>iFDULE F'.R IMFtFWNTAT!GN PFR LPst LF TTFA NL" 44 d;0 DFLFMf'FR cl. I'li4.

LAROL(NA PodER N LI BRUNSWICK SfEAM ELECFRIC

[MPLEMENTATION S

.~

1987 1988 1989 - -

T JAN lAPR IJUL 10CT JAN lAPR IJUL 10CT JAN lAPR IJUL 10CT REFUEL 5 REFUEL 6 5/9 I~ A NI9/25 2/4 1 IN _\16/16 e/7 4/cd REFUEL 7 12/26 7/2I I Al 11/11 Q11/14 NLS-65-016; 2/14/8*5 Q11/14 D11/14 NLS-04-363,d/30/d4 & SER,11/9/84 Q11/14 NLS+4-363; d/30/84 & SER,11/9/84 Q11/14 NLS-84-222; b/1/84 1/25/91 3/14/92 l

M , , , , , , ,,, ,,, , , , ,

If JAN lAPR IJUL IOCT JAN lAPR IJUL 10CT JAN lAPR IJUL IOCT i 1987 '1988 1989 LEGEND. Moe Avadahion Apartere Card m ,.umes.

i I OUTAGE CRITICAL PATH Tl INN \\l OUTAGE CONTINGENCY APERTUIE gg f

0T COMPANY

> ANT UNITS 1 & 2 EDULE B hh h -dh

[ Page a of 4 l

-~

c

1985 1986 JAN lAPR (JUL l0C T JAN lAPR lJUL 10 N3TF9 , , , . .

CUTAGE SUtEDULE REFUEL 4 UNIT 1 3/291 12/13 RFFUEL 6 UNIT 2 3/29 i LNIMT PURoE N VENT MODIFICATION 3 UNIT 1 (1) 011/1 LN.L LE TTER F-X-0213 EMER RESP LAP - NUREG 0/3/ SUPi SODS -ERFIS UNIT i (/)

UNIT i (/)

Ro 1.97 UNIT i (/)

UNIT 2 (7)

DCRDR UNIT 0 (10)

ER" UNIT 0 (/)

MASONRf WALL DESIGN - IE f3dLLEIIN B0-1i UNIT 0 (4. 91 OccMPL?TED Nus-d a-4R2; 12/21/6 4 UNIT 0 (4. di 0 7/G NL EPENI FUEL POOL EXPANSION UNIT i (2)

UNIT 2 (2) 1/10_

LIGUID RADWASIE S(STEM MODIFICATIONS UNIT 0 (2) 1/1 O JAN lAPR lJUL 10CT JAN lAPR IJUL 10 1985 1986 NJiEG f t) COMPLETION DATE TIED TQ QUTA3E.

fC) LPA RFLIAf1ILITf IMPR0/EMENT--FOR NRC INFORMATION CNLY.

f31 CRD RETURN LINE CAPPIN3 CuiEDULED FOR RFFUEL 4. IN VECCFL LIGUID PENEIRANT EXA4 IS NSFDULED FOR RFCUEL 5.

, T4? PRFVIOUS COR61FSPONDENCE WITH NRC COMMITTED TO NHEDULE THIS ITEM IN LON3 RANiE PLAN.

M) LPbL LETTER NLS-d4-014 ND(EMPFR C6.194 4 COMMITTFD To ncSEDULE COMPLETION Oc 4003 IN LON3 RAN3F PLAN AND INCLL'DFD INTERIM COMPLE

'b) DUAL UNIT CUTA3E RF30IRFD.

(1) COMPLETION DATE TIED TO OUTA3E COMPLETION PLUG THREE MONTH 3 (d? IMPLEMENTATION SCHFDULE IS ONLY FOR THO"E WALLS COMMITTED TO PE M;DIFIFD IN CobL LETTFR NLC-H4-190 APRIL 27, 1944.

f9? EN11NEERIN3 DESIGN EFFORT FOR FLEVEN ADDITIONAL WALLO.

(10) SuiFDULE OFFLEQS COMMITMENT TO RTMIT A PR;P0"FD CchFDULE FOR IMPLEMENTATION PFR LPf.L LETTFR NLS -e4-506 DELFMDFR L7.1914.

CAROLINA POWER S LIO BRUNSWICK STEAM ELECTRIC r IMPLEMENTATION SL t - AUG--89 e --.

1987 1988 1989 ~'

T JAN IAPR IJUL 10CT JAN IAPR IJUL 10CT JAN lAPR IJUL 10CT REFUEL 5 REFUEL 6 5/9 I Nl 9/25 2/4 I 6/16 REFUEL 7 12/26 7/21 I \1 11/11 1/20/83 07/28 0 12/23 0 11/6 NLS-84-506; 12/27/81 02/13 NLs-84-co6.12/27/a4 05/14 NLS-84-506; 12/27/84 07/28

$-84-190; 4/27/84 05/8 07/1 y 04/4 T JAN lAPR IJUL 10CT JAN lAPR lJUL 10CT JAN lAPR IJUL 10CT 1987 1988 1989 LEGEND: Alas Avage 9,,

Apseture Card i I OUTAGE CRITICAL PATH l\\\\1 OUTAGE CONTINGENCY APERTURE

CA RD HT COMPANY LANT UNITS i&2 h I ,

HEDULE B Page 3 of 4

1985 1986 JAN lAPR lJUL IOCT JAN lAPR IJUL l0:

-, N') TE 9 , , , , , , , . ,

OUTAGE SDiEDULE REFUEL 4 UNIT 1 3/29 i L N 12/13 11/1 REFUEL 6 UNIT 2 3/29i N'd U ACKUP SYS TEM - 6ENERIC LE TTER ts4-09 UNIT 1 (1) 011/1 NLS-84-299,6/27/84 6. S UNIT 2 (1)

JAN lAPR IJUL 10CT JAN lAPR lJUL 10i 1985 1986 NaiEJ f t) C0fLETION D ATE TIFD TO QUTA3E.

f2) LPM. OELIAflILITY IMPR0/EMENT--FOR NRC INFORMA110N CNLY, f31 CR0 RETifRN LIT CAPPING SCHEDULED FOR REFUEL 4. IN VE3T LIOUID PENETRANT EXAM IS FJ1FDdLED FOR REFUEL 5.

f4) FREVIOU1 LORRFFALNCENCE WITH NRG COMMITTED TO RUtEDULE THIS ITEM IN LOW RA43E Pt.AN.

f5) LPsl LETTER NLC-"4--a14 NC# EMBER I.6.1964 COMMITTED TO RuiEDULE COMPLETION or MODS IN LON3 RAN3E PLAN AND INCLUCED INTER!M COMPLE

'b) DUAL UNIT GUTA3E 6F3UIRED.

f7) COMPLETION CATE TIED TO QUTAGE COMPLETION PLUS THRFE MONTH 3 fM IMPLEMENTAT!ON S.NEDULE IS ONLY FOR TH07F WALLS COMMITTED TO DE MODIFIED IN CDf.L LETTER NLS-84-190 ApHIL 27, 1984, (9) ENGINEERING DESIGN EFFORT FOR ELE /EN ADDITIONAL WALLO, (10) SLHEDULE RFFLECTS COMMITMENT TQ fUEMIT A PROPOSED PLSEDULE FOR IMPLEMENTATION PERs Lo t LETTER NLS-34-506 DEOFMEER 27,1984.

CAROLINA POWER S LIE BRUNSWICK STEAM ELECTRIC F IMPLEMENTATION SC 1-AUG-89

1987 1988 1989 lT JAN lAPR IJUL IOCT JAN lAPR IJUL 10CT JAN lAPR IJUL 10CT REFUEL 5 REFUEL 6 5/9 I b. AI9/25 2/4 1 IN Al 6/16 d// 4/ao REFUEL 7 12/26 7/2I IX Al 11/11 LS-BS-063,3/1/85 011/14 NLS-84-299,6/27/84 3 1 I T T I E 3 iI I I E 5 5

T JAN lAPR lJUL l0CT JAN lAPR lJUL IOCT JAN lAPR IJUL IOCT 1987 1988 1989 LEGEND.

Also Avada m On Apeature Carel

' ION MILESTONES, I I OUTAGE CRITICAL PATH TI l\\\\1 OUTAGE CONTINGENCY APERTURE CARD

'iT COMPANY

_ ANT UNITS 1 & 2 Q h -

iEDULE B Page 4 of 4 i

Ww I

J