Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Force on Force Inspection (Millstone 2020) + (Force on Force)
- Force on Force Inspection (Nine Mile Point 2020) + (Force on Force)
- Force on Force Inspection (Oconee 2021) + (Force on Force)
- Force on Force Inspection (Oconee 2020) + (Force on Force)
- Force on Force Inspection (Palisades 2020) + (Force on Force)
- Force on Force Inspection (Peach Bottom 2020) + (Force on Force)
- Force on Force Inspection (Perry 2019) + (Force on Force)
- Force on Force Inspection (Point Beach 2021) + (Force on Force)
- Force on Force Inspection (Prairie Island 2020) + (Force on Force)
- Force on Force Inspection (River Bend 2021) + (Force on Force)
- Force on Force Inspection (River Bend 2019) + (Force on Force)
- Force on Force Inspection (Robinson 2020) + (Force on Force)
- Force on Force Inspection (Saint Lucie 2020) + (Force on Force)
- Force on Force Inspection (Salem 2020) + (Force on Force)
- Force on Force Inspection (Seabrook 2020) + (Force on Force)
- Force on Force Inspection (Sequoyah 2020) + (Force on Force)
- Force on Force Inspection (Summer 2020) + (Force on Force)
- Force on Force Inspection (Three Mile Island 2021) + (Force on Force)
- Force on Force Inspection (Turkey Point 2021) + (Force on Force)
- Force on Force Inspection (Waterford 2021) + (Force on Force)
- Force on Force Inspection (South Texas 2021) + (Force on Force)
- PMNS20250478, Force-On-Force Program Scope Meeting with NEI and Licensees + (Force-On-Force Program Scope Meeting with NEI and Licensees)
- ML090340444 + (Force-on-Force Cover Sheet (Not Inspection Report))
- ML17081A188 + (Force-on-Force Escalation Response Letter)
- PMNS20250203, Force-on-Force Inspection Framework Revisions + (Force-on-Force Inspection Framework Revisions)
- ML083520549 + (Force-on-Force Inspection Report)
- IR 05000272/2005201 + (Force-on-Force Inspection Report 05000272-05-201, 05000311-05-201 & 05000354-05-201, Salem Hope Creek, Cover Letter Only)
- ML18296A062 + (Force-on-Force Inspection Report Cover Letter 2018)
- 0CAN120901, Force-on-Force Position + (Force-on-Force Position)
- ML20100K871 + (Forced CONVECTIVE,NONEQUILIBRIUM,POST-CHF Heat Transfer Experiment Data and Correlation Comparison Report)
- ML19290C663 + (Forced Circulation Cooldown, Special Test 9A)
- ML13322A860 + (Forced Evacuation of Control Room Due to Fire Causing Loss of All Station &/Or Normal Instrument Air, Revision 7)
- ML051460222 + (Forced Outage Schedule, Cold Shutdown)
- 05000410/LER-2012-001, Forced Shutdown Due to an Increase in Drywell Leakage in Excess of Technical Specifications Limit + (Forced Shutdown Due to an Increase in Drywell Leakage in Excess of Technical Specifications Limit)
- ML20024E309 + (Forces on Shear Key,Big Rock Point Plant)
- ML14310A608 + (Ford Indeminty Termination)
- ML14310A588 + (Ford License Termination Letter - Termination of Facility Operating License No. R-28 for the University of Michigan Ford Nuclear Reactor)
- ML041810599 + (Ford Nuclear Reactor - Amendment, Decommissioning Plan)
- ML050950432 + (Ford Nuclear Reactor - Report of Reactor Operations for 2004)
- ML061020231 + (Ford Nuclear Reactor - Technical Specification Amendment Request, Revision 02)
- ML061450128 + (Ford Nuclear Reactor - Technical Specification Amendment Request, Amendment 50)
- ML060720224 + (Ford Nuclear Reactor - Technical Specifications Amendment Request, Revision 01)
- ML11119A004 + (Ford Nuclear Reactor - Technical Specification Amendment Request Decommissioning Plan - Revised Section 4.0 (Final Status Survey Plan))
- ML11199A009 + (Ford Nuclear Reactor - Technical Specification Amendment Request Decommissioning Plan - Revised Section 4.0 (Final Status Survey Plan) (Response to NRC Comments Dtd June 1, 2011 on Initial Fnr - Technical Specification Amendment Submitted a)
- ML12157A266 + (Ford Nuclear Reactor - Technical Specification Amendment Request Decommissioning Plan - Revised Section 4.0 (Final Status Survey))
- ML12025A125 + (Ford Nuclear Reactor - Technical Specification Amendment Request Decommissioning Plan - Revised Section 4.0 (Final Status Survey))
- ML050950434 + (Ford Nuclear Reactor License Amendment; Receipt, Possession, and Use of Byproduct, Source and Special Nuclear Materials)
- ML033320414 + (Ford Nuclear Reactor License and Tech Spec Amendment 47 Revised), First License Amendment Following Permanent Cessation of Operation)
- ML031970380 + (Ford Nuclear Reactor License and Technical Specification Amendment 47, Elimination of Possession of Special Nuclear Material and Physical Security Plan)
- ML20042G257 + (Ford Nuclear Reactor Requalification Program for Licensed Reactor Operators & Licensed Senior Reactor Operators)
- ML052630464 + (Ford Nuclear Reactor Technical Specifications Amendment; Elimination and Relaxation of Specifications Following Permanent Cessation of Operations)