Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20153G877 + (Failure Mode,Effects & Criticality Analysis (Fmeca) of West Valley Nuclear Svcs Supernatant Treatment Sys & Cement Solidification Sys)
- ML20154L807 + (Failure Mode,Effects & Criticality Analysis (Fmeca) of West Valley Nuclear Svcs Supernatant Treatment Sys & Cement Solidification Sys)
- ML20070R642 + (Failure Modes & Effects Analysis (Fmea))
- ML20080E010 + (Failure Modes & Effects Analysis for Oconee 1 Nuclear Power Station Makeup & Purification Sys, Preliminary Draft)
- ML20151K276 + (Failure Modes & Effects Analysis for Oconee 1 Nuclear Power Station Makeup & Purification Sys)
- ML13310A243 + (Failure Modes & Effects Analysis for San Onofre Nuclear Generating Station Unit 1 Rod Control Sys)
- ML20080E606 + (Failure Modes & Effects Analysis of Integrated Control Sys/ Non-Nuclear Instrumentation Electric Power Distribution Circuitry, Interim Rept)
- ML20030C669 + (Failure Modes & Effects Analysis, Book 1)
- ML18038A570 + (Failure Modes & Effects Analysis,Nine Mile Point Nuclear Station,Unit 2, Books 1 & 2)
- ML20138Q690 + (Failure Modes and Effects Analysis (FMEA) of the Ics/Nni Electric Power Distribution Circuitry at the OCONEE-1 Nuclear Plant)
- ML102910649 + (Failure Modes of CR-3 Containment Concrete Delamination Issue)
- ML22060A211 + (Failure Rate)
- 05000324/LER-1981-041-03, Failure Rate of 20% Was Observed on Snubbers Located Outside Drywell.Caused by Worn Snubber Poppets Due to Poppet Low Resistance to Pipe Vibrations.Snubbers Rebuilt.Unit 1 Snubbers to Be Replaced + (Failure Rate of 20% Was Observed on Snubbers Located Outside Drywell.Caused by Worn Snubber Poppets Due to Poppet Low Resistance to Pipe Vibrations.Snubbers Rebuilt.Unit 1 Snubbers to Be Replaced)
- 05000387/FIN-2016004-01 + (Failure Rates Exceed (20%) Twenty Percent for Biennial Requalification Exam)
- 05000482/FIN-2013005-01 + (Failure Rates Exceed Twenty Percent for Annual Requalification Operating Tests)
- 05000219/FIN-2015002-02 + (Failure Rates Exceed Twenty Percent for Annual Requalification Exam)
- 05000482/FIN-2012005-01 + (Failure Rates Exceed Twenty Percent for Biennial Requalification Exam)
- 05000333/FIN-2009003-04 + (Failure Regarding an Adverse EDG Rotor Insulation Performance Trend)
- 05000324/FIN-2011002-01 + (Failure To Adequately Evaluate And Correct A Condition Adverse To Quality Involving A Manufacturing Defect Of Barton Model 199 Dual Dampener Differential Pressure Units)
- 05000324/FIN-2011003-01 + (Failure To Adequately Evaluate And Correct A Condition Adverse To Quality Involving A Manufacturing Defect Of Barton Model 199 Dual Dampener Differential Pressure Units)
- 05000390/FIN-2016011-02 + (Failure To Adequately Evaluate Available Net Positive Suction Head To The Unit 1 AFW Pumps)
- 05000391/FIN-2016011-04 + (Failure To Adequately Evaluate Available Net Positive Suction Head To The Unit 2 AFW Pumps)
- 05000324/FIN-2009005-02 + (Failure To Adequately Implement Design Control Measures For The Fire Protection Program)
- 05000440/FIN-2012003-02 + (Failure To Appropriately Control Access To A Locked High Radiation Area)
- 05000416/FIN-2011007-02 + (Failure To Assure Equipment Required For Postfire Safe Shutdown Was Protected Against Fire Damage)
- 05000440/FIN-2012005-01 + (Failure To Classify An Unusual Event)
- 05000285/FIN-2012002-05 + (Failure To Comply With An Emergency Plan Requirement To Notify Offsite Authorities Within 15 Minutes Of An Emergency)
- 05000440/FIN-2011005-01 + (Failure To Comply With TS 5.5.11, TS Bases Control Program)
- 05000440/FIN-2011005-02 + (Failure To Comply With TS 5.5.11, TS Bases Control Program)
- 05000440/FIN-2013007-01 + (Failure To Comply With Technical Specification 3.4.11)
- 05000315/LER-2004-001 + (Failure To Comply With Technical Specification 3 .7 .5 .1, Control Room Emergency Ventilation System)
- 05000390/FIN-2015002-03 + (Failure To Consider The Effects Of A Break In Non- Seismic ERCW Piping)
- 05000416/FIN-2014009-01 + (Failure To Correct Degraded Viewing Ports In A Timely Manner)
- 05000259/FIN-2010006-01 + (Failure To Correct The EECW Valves Throttled Below Analyzed Condition)
- 05000440/FIN-2010003-05 + (Failure To Effectively Use The Intended Radiological Engineering Controls During Cavity Drain-Down In Preparation For Its Decontamination)
- 05000390/FIN-2016011-01 + (Failure To Ensure Adequate Unit 1 Emergency Diesel Generator Surveillance Instructions)
- 05000424/FIN-2016007-02 + (Failure To Ensure Adequate Unit 1 Emergency Diesel Generator Surveillance Acceptance Criteria)
- 05000391/FIN-2016011-03 + (Failure To Ensure Adequate Unit 2 Emergency Diesel Generator Surveillance Instructions)
- 05000374/FIN-2017010-01 + (Failure To Ensure Fire Door Was Engaged And Pinned)
- 05000261/FIN-2010011-02 + (Failure To Ensure that the Full Range of Emergency Diesel Generator Frequency is Accounted for in the Safety Analyses)
- 05000445/FIN-2013007-03 + (Failure To Establish 10 CFR 50.65(a)(1) Performance Goals for the APDGs)
- 05000440/FIN-2011005-03 + (Failure To Establish A Procedure To Perfrom Maintenance On Safety-Related Equipment)
- 05000498/FIN-2017002-03 + (Failure To Establish Adequate Procedures To Ensure Emergency Diesel Generator Access Flood Panels Would Meet Their Safety Function)
- 05000456/FIN-2011002-04 + (Failure To Evaluate The Effects Of Dynamic Loads At The Containment Spray Discharge Piping)
- 05000440/FIN-2010003-04 + (Failure To Evaluate The Need For Radiological Engineering Measures To Control Contamination During Installation Of A Cover Over The Drywell Head)
- 05000237/FIN-2012005-01 + (Failure To Follow Cold Weather Initiating Procedure)
- 05000440/FIN-2012003-01 + (Failure To Follow Operations Procedures)
- 05000324/FIN-2012003-01 + (Failure To Follow Plant Procedure Caused Loss of E1 Bus)
- 05000338/FIN-2015001-01 + (Failure To Follow Procedure For RWST Instruments)
- 05000416/FIN-2012005-05 + (Failure To Follow the Radiation Work Permit Requirements During Reactor Cavity High Water Operations)
- 05000390/FIN-2015007-02 + (Failure To Identify A Condition Adverse To Quality For Negative Fouling Factors)