Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20239A107 + (Expanded Augmented Sys Review & Test Program (Expanded Asrtp) Evaluation of Radiation Monitoring Sys Sys)
- ML20236B010 + (Expanded Augmented Sys Review & Test Program (Expanded Asrtp) Evaluation of Nuclear Svcs Electrical Bldg Essential & Normal HVAC Sys)
- ML20236B005 + (Expanded Augmented Sys Review & Test Program (Expanded Asrtp) Evaluation of Component Cooling Water (CCW) & Turbine Plant Cooling Water (Tcw) Sys)
- ML20236J707 + (Expanded Augmented Sys Review & Test Program (Easrtp) Evaluation Plan)
- ML20236J692 + (Expanded Augmented Sys Review & Test Program Methodology Guidelines)
- ML19321A037 + (Expanded Description of Soil Pressure Analyses, Suppl 1 to Addl Investigations to Determine Effects of Combined Vibratory Motions & Surface Rupture Offset Due to Earthquake on Postulated Verona Fault, Revision 1)
- ML043420096 + (Expanded Environmental Notification Form, Yankee Nuclear Power Station, Site Closure Project)
- ML20136H172 + (Expanded Field Notes for Co Rept 50-264/71-01 on 710602. Areas Discussed:Administration & Organization Operations, Facility Procedures,Primary Sys,Reactor Controls & Core Physics,Functional Tests,Safety Circuitry & Core Internals)
- ML032250223 + (Expanded Scope of Dresden Nuclear Power Station Application for Operating License Renewal W/Map)
- ML032250420 + (Expanded Scope of Quad Cities Nuclear Power Station Application for Operating License Renewal - Request for Comments)
- ML20135B346 + (Expands Upon Some of Data Developed in Draft Ltr Rept ORNL/NRC/LTR-96-32, Characterization Update of Pump & Related Equipment Failure Experience in Nuclear Power Industry (1994-1995))
- ML20147B107 + (Expands on 780519 Comments on Proposed Amend to 10CFR34, Urging Requirement for Radiographers to Wear a Pocket Chirper to Warn of Overexposure.Believes Chirpers Are Especially Needed in Isotope Radiography)
- 05000334/FIN-2012002-03 + (Expansion Joint Degradation Resulted in River Water Inoperability)
- ML22124A031 + (Expansion and Use of Risk-Informed Process for Evaluations)
- ML20125B651 + (Expansion of Drywell Containment Vessel)
- ML23193A379 + (Expansion of Policy on Potential Common-Cause Failures in Digital Instrumentation and Control Systems)
- ML21180A012 + (Expansion of Risk-Informed Process for Evaluations (Low Safety Significance Issue Resolution Recommendation 5))
- ML22088A129 + (Expansion of Risk-Informed Process for Evaluations (Low Safety Significance Issue Resolution Recommendation 5))
- ML22088A140 + (Expansion of Risk-Informed Process for Evaluations (Low Safety Significance Issue Resolution Recommendation 5))
- ML24278A002 + (Expectations for Licensing Efficiencies Identified During May 29, 2024, Licensing Workshop)
- ML20080M801 + (Expected Findings of Fact Re Independent Assessment Program to Be Raised During 840220-24 Hearings.Certificate of Svc Encl)
- ML20080M653 + (Expected Findings of Fact Re Welding Issues to Be Raised During 840220-24 Hearings.Certificate of Svc Encl)
- ML20080N799 + (Expected Findings of Fact for 840220-24 Hearings Re Welding Issues.Findings Summarize Principal Arguments & Give Fair Notice of Position.Certificate of Svc Encl)
- ML19197A260 + (Expected Submission Date of 1.0 MW Steady-State Power Level Updated Final Safety Analysis Report)
- DCL-14-100, Expected Submittal Date for Licensee Event Report 1-2014-003 Supplement 2 + (Expected Submittal Date for Licensee Event Report 1-2014-003 Supplement 2)
- DCL-15-014, Expected Submittal Date for Licensee Event Report 2014-002-01 + (Expected Submittal Date for Licensee Event Report 2014-002-01)
- DCL-15-062, Expected Submittal Date for Licensee Event Report 2015-001-01 + (Expected Submittal Date for Licensee Event Report 2015-001-01)
- ML092220377 + (Expected Submittal Dates for License Renewal Applications)
- DCL-11-102, Expected Submittal Dates for Licensee Event Report Supplements + (Expected Submittal Dates for Licensee Event Report Supplements)
- ML043230163 + (Expected Task Interface Agreement to Review B Recirculation Pump High Vibration Report)
- ML19206A347 + (Expects NRC Assessment of Jordan Memorandum Will Be Submitted by End of Jan 1978;recommends ASLB Defer Any Licensing Action Until All Relevant Info Is Available)
- ML18004A353 + (Expects NRC to Require Util to Hold Full Scale Emergency Test of Facility Evacuation Plan & Reject Util Proposed Partial Drill Scheduled for Oct)
- ML19309F501 + (Expects Review of 800229 Draft Agreement Between NRC & State of Wa Will Include Stability Review of Embankment Against Requirements of Reg Guide 3.11)
- ML20148H820 + (Expects Review of Floating Nuc Plant Fire Protec to Be Completed by Mid-Mar,1979.Schedules Meeting for 790130)
- ML20211B934 + (Expects That Rules Will Again Be Amended by 870715.NRC Also Intends to Adopt Part 35 When Rules Amended.Part 35 Adoption Depends on Whether Conference Committee on Part L Finished in Time for Inclusion in Rulemaking)
- ML17173A733 + (Expects to Complete Generic Review of Mark I Containment long-term Program by May 1979.Requests plant-unique Analysis Shortly Thereafter & Completion of Plant Mods by Dec 1980. Forwards Evaluation of Suppression Pool Temp Limits)
- ML17173A731 + (Expects to Complete Generic Review of Mark I Containment long-term Program by May 1979.Requests plant-unique Analysis Shortly Thereafter & Completion of Plant Mods by Dec 1980. Forwards Evaluation of Suppression Pool Temp Limits)
- ML17053A592 + (Expects to Complete Generic Review of Mark I Containment long-term Program by May 1979.Requests plant-unique Analysis Shortly Thereafter & Completion of Plant Mods by Dec 1980. Forwards Evaluation of Suppression Pool Temp Limits)
- ML19220A786 + (Expects to Supply Results of Review of Fire Protection Sys Analysis by 761110)
- ML20132B640 + (Expedient Methods of Respiratory Protection:Iii.Submicron Particle Tests and Summary of Quality Factors)
- ML20039A752 + (Expedient Methods of Respiratory Protection)
- ML20081J593 + (Expedient Methods of Respiratory Protection:Ii.Leakage Tests)
- CNL-21-011, Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002) + (Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002))
- EPID:L-2021-LRO-0003 + (Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002))
- CNL-20-104, Expedited Application for Approval to Use an Alternate Method of Determining Probability of Detection for (WBN TS-391-20-024) + (Expedited Application for Approval to Use an Alternate Method of Determining Probability of Detection for (WBN TS-391-20-024))
- EPID:L-2020-LLA-0273 + (Expedited Application for Approval to Use an Alternate Method of Determining Probability of Detection for (WBN TS-391-20-024))
- CNL-21-015, Expedited Application to Modify Watts Bar Nuclear Plant, Unit 1 Technical Specification 3.7.12, Auxiliary Building Gas Treatment System, for One-Time Exception to Permit Opening of the Auxiliary Building Secondary Containment Enclosure as + (Expedited Application to Modify Watts Bar Nuclear Plant, Unit 1 Technical Specification 3.7.12, Auxiliary Building Gas Treatment System, for One-Time Exception to Permit Opening of the Auxiliary Building Secondary Containment Enclosure as N)
- EPID:L-2021-LLA-0035 + (Expedited Application to Modify Watts Bar Nuclear Plant, Unit 1 Technical Specification 3.7.12, Auxiliary Building Gas Treatment System, for One-Time Exception to Permit Opening of the Auxiliary Building Secondary Containment Enclosure as N)
- CNL-23-015, Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08) + (Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08))
- EPID:L-2023-LLA-0029 + (Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08))
- CNL-24-071, Expedited Application to Revise Technical Specifications to Revise the Reactor Coolant System Pressure Isolation Valve Leakage Testing Frequency for the (SQN-TS-24-04) + (Expedited Application to Revise Technical Specifications to Revise the Reactor Coolant System Pressure Isolation Valve Leakage Testing Frequency for the (SQN-TS-24-04))