Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19312D055 + (Eighth Set of Interrogatories Directed to Applicant.Includes Questions on Control Room Displays for Valves & Other Remotely Controlled Instruments,On Control Room Design & on steel-liner Bulge.Power Interchange Table Encl for Updating)
- ML20072R739 + (Eighth Set of Interrogatories on Contentions Re ALARA & Emergency Planning.Certificate of Svc Encl.Related Correspondence)
- ML20028A318 + (Eighth Set of Interrogatories.Certificate of Svc Encl. Related Correspondence)
- RS-18-059, Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident + (Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident)
- RS-18-058, Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under . + (Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under .)
- RS-18-060, Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable . + (Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable .)
- JAFP-17-0018, Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051))
- ML17045A608 + (Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049), PLA-7570)
- CNL-18-084, Eighth Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions + (Eighth Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions)
- ML17059D129 + (Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events)
- RS-17-021, Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events + (Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events)
- CNL-17-016, Eighth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (Eighth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049))
- JAFP-17-0017, Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events + (Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events)
- RS-17-022, Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events + (Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events)
- RS-17-019, Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events + (Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events)
- NL-18-0870, Eighth Six-Month Status Report of the Implementation of the Commission Order with Regard to Requirements for Reliable Hardened Containment Vents (EA-13-109) + (Eighth Six-Month Status Report of the Implementation of the Commission Order with Regard to Requirements for Reliable Hardened Containment Vents (EA-13-109))
- ML19296B656 + (Eighth Status Rept Per Aslab 790607 Grant of Indefinite Extension of Time to Respond to Suffolk County Motion to File Supplement Brief.Special Inquiry Group Rept Issued.Task Action Plan Being Prepared.Certificate of Svc Encl)
- ML022540577 + (Eighth Supplemental Declaration of Thomas E. Lumsden in Support of Revised Application of Official Committee of Unsecured Creditors for Order Under 11 U.S.C. 1103 and 328 and F.R.B.P. 2014 and 2016 Authorizing Retention and Employment of)
- ML20102A606 + (Eighth Supplemental Part 21 Rept Re Thermostatic Valve Malfunction Fail Safe to Full Cooling Position.Lower Overrun Assemblies in Robertshaw Valves on Diesel Generator Sets Replaced W/Overrun Assemblies Using Cotter Pins)
- ML20050A666 + (Eighth Water Reactor Safety Research Information Meeting)
- ML20050A663 + (Eighth Water Reactor Safety Research Information Meeting)
- ML20050A690 + (Eighth Water Reactor Safety Research Information Meeting)
- ML20050A664 + (Eighth Water Reactor Safety Research Information Meeting)
- ML042020296 + (Eighth and Final Application for Allowance of Fees and Expenses of Winston & Strawn Llp (August 16, 2001 Through April 12, 2004))
- ML13310B204 + (Eighty-fourth Percentile Response Spectrum for San Onofre Unit 1)
- ML20040C401 + (Eis)
- ML19351E752 + (Eis,Submitted in Support of Application for Renewal of License R-81.Univ of Wi Emergency Plan Encl)
- ML12349A286 + (Eismic Walkdown Checklists, Refueling Water Tank Discharge - Page C-244 - Page C-339)
- ML18103A174 + (Eiwg Recommendations Memo)
- ML18302A404 + (Ej Analysis for Honeywell Facility)
- ML18204A119 + (Ej Wexler Report and Attachments)
- ML25108A094 + (Eketchum Amah Mutsun Tribal Band Email and NRC Response to Vallecitos Nuclear Center Effects Finding Letter)
- ML19354C345 + (El Centro CA Differential Ground Motion Array)
- ML041330409 + (El Paso Electric - 2002 Annual Report)
- ML20151Z784 + (El Paso Electric 1997 Annual Rept)
- ML19323F239 + (El Paso Electric Co Study of Interconnection W/Utils in Eastern Nm or Tx)
- ML21077A256 + (El Paso Electric Co., Application for Approval of Indirect Transfer of Control of Licenses Pursuant to 10 C.F.R. 50.80 and 72.50)
- EPID:L-2021-LLM-0002 + (El Paso Electric Co., Application for Approval of Indirect Transfer of Control of Licenses Pursuant to 10 C.F.R. 50.80 and 72.50)
- ML18192A382 + (El Paso Electric Company 1976 Annual Report)
- ML18192A376 + (El Paso Electric Company 1977 Annual Report)
- ML17305A292 + (El Paso Electric,1988 Annual Rept)
- ML20203G662 + (El Segundo Blue Butterfly (Euphilotes Battoides Allyni) Recovery Plan)
- ML19310H406 + (El Senorial PSI 52-25493-01)
- 05000325/LER-2007-001 + (El to E3 Cross-tie Breaker Unavailable due to M.salignment)
- ML13308A760 + (Elaborates Concerns Raised in Re Licensing of Facilities.Independent Review of Facilities Is Warranted in Light of NRC Suspension of Diablo Canyon.Review Should Be Conducted by Independent Firm W/No Conflict of Interest)
- HL-5310, Elaborates Response to NRC RAI Re P/T Submittal of 960918 + (Elaborates Response to NRC RAI Re P/T Submittal of 960918)
- ML19241C066 + (Elaborates on Conclusions of B&W 790405 Memo.Increase in Selected Thermocouple Readings Is No Cause for Concern)
- ML19322A714 + (Elaborates on Intent of Mechanical Procedures Noted in AEC as Not Complying W/Regulations for Procedural Changes.Memos Intended as Explanations Rather than Changes. Clarification Will Be Made in Future)
- ML20134A857 + (Elaborates on Re Need for Formal QA Policy & Confusion About NRC Function in Area of QA & Reliability Assessment.Clear Commission Directive on Reliability & QA Needed)
- ML20127N695 + (Elaborates on Util Commitments to Listed Plant Activities, Including CRD Mechanism Temp Recording,Requalification, Surveillance & Preventative Maint,Backup Reactor Shutdown Procedure,Tendons & Pcrv Integrity & Electrical Sys)
- ML072140748 + (Elassoma Okatie on the Savannah Floodplain)