Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20069C529 + (Eighth Interim Deficiency Rept Re Itt Grinnel Welded Supports W/Discrepancies in Weld Designation.Initially Reported on 800905.Util & Manufacturer Revising All Hanger Detail Sheets.Also Reported Per Part 21.Next Rept by 831208)
- ST-HL-AE-1038, Eighth Interim Deficiency Rept Re Nonconforming Welds in Vendor Fabricated Category I Structural Steel.Initially Reported on 810108.Bechtel Will Provide Recommendations. Final Rept Anticipated by 840323 + (Eighth Interim Deficiency Rept Re Nonconforming Welds in Vendor Fabricated Category I Structural Steel.Initially Reported on 810108.Bechtel Will Provide Recommendations. Final Rept Anticipated by 840323)
- ML20128C357 + (Eighth Interim Deficiency Rept Re Omissions to Auxiliary Feedwater Pump Drawing.Initially Reported on 830225.Analysis Completed.Support Design Work in Progress.Next Rept Expected by 851218)
- ML20084H709 + (Eighth Interim Deficiency Rept Re Potential Design Deficiency in Valve Yoke to Motor Mount Weld.Initially Reported on 740514.Alternate Solution,Using Downstream Orifice Plate Installed Inside Torus,Implemented)
- ML20064M538 + (Eighth Interim Deficiency Rept Re Seismic Qualification of B&W Equipment in TVA Panels.Initially Reported on 801124. Affected Equipment Being Requalified by Bailey Meter Co Through B&W.Next Rept Due by 830909)
- ML20041A736 + (Eighth Interim Deficiency Rept Re Welding of Structural Steel Annulus Floor Framing,Initially Reported 800415.All 566 Welds Reinspected & Data Currently Under Evaluation.Next Rept Will Be Submitted by 820504)
- ML20082S792 + (Eighth Interim Rept Re Significant Const Deficiency 37 Concerning Temp Detector Failures.Corrective Action & Supporting Documentation Review Scheduled for Completion by End of Dec 1983.Final Rept Will Be Submitted by 840120)
- ML20077J438 + (Eighth Interim Rept Re Significant Const Deficiency 33, Chilled Water Piping Supports. Supporting Documentation Currently Under Review.Final Rept Will Be Submitted by 830916)
- ML20083N650 + (Eighth Interim Significant Const Deficiency Rept 57 Re Inadequate Instrumentation & Control Installations Turnover Documentation.Corrective Actions Will Be Reviewed in Late May 1984.Final Rept by 840615)
- ML20084H723 + (Eighth Interim Significant Const Deficiency Rept 60 Re Turnover Documentation & Inadequate Hanger Weld Problems T&B.Documentation Reviews & Field Verification Scheduled to Be Completed in mid-May 1984.Final Rept Expected by 840525)
- ML20083P841 + (Eighth Interim Significant Const Deficiency Rept 78 Re American Bridge Structural Steel Defects.Review of Supporting Documentation Scheduled for Completion in Late 1984.Final Rept Will Be Submitted by 840430)
- ML20071A120 + (Eighth Motion for Summary Disposition of Contention Necnp I.A.2.No Genuine Issue of Matl Fact Exists & Applicant Entitled to Favorable Decision.Related Correspondence)
- ML20198B154 + (Eighth Partial Response to FOIA Request for Records Underlying Enforcement Action EA-84-93.App DD Documents Available in Pdr.App Ee Documents Withheld (Ref FOIA Exemption 5))
- ML20134M890 + (Eighth Partial Response to FOIA Request for Documents. Records in App O Encl & Already Available in Pdr.App P Records Being Made Available in PDR)
- ML20134M893 + (Eighth Partial Response to FOIA Request for Documents. Records in App O Encl & Already Available in Pdr.App P Records Being Made Available in PDR)
- ML20150D808 + (Eighth Partial Response to FOIA Request for Documents.App H Documents Available in Pdr.No Record Available on K Combs)
- ML20216B877 + (Eighth Partial Response to FOIA Request for Documents. Records in App I Being Withheld in Entirety (Ref FOIA Exemption 5))
- ML20236U031 + (Eighth Partial Response to FOIA Request for Documents Re Suppl 2 to NUREG-0675 Concerning Operation of Facility. Forwards Documents Listed in App Q.Documents Also Available in PDR)
- ML20147B836 + (Eighth Partial Response to FOIA Request for Documents. Forwards Records in App S.Records Available in Pdr.App T Records Being Withheld in Entirety (Ref FOIA Exemption 5))
- ML20106C803 + (Eighth Partial Response to FOIA Request for Six Categories of Info Re Application of Sholly Amend to Consideration of Amend to DPR-50.Forwards Documents Listed in App. Documents Also Available in PDR)
- ML20134M969 + (Eighth Partial Response to FOIA Request for Documents. Documents Listed in App O Partially Withheld (Ref FOIA Exemption 7))
- ML20134M972 + (Eighth Partial Response to FOIA Request for Documents. Documents Listed in App O Partially Withheld (Ref FOIA Exemption 7))
- ML20248L140 + (Eighth Partial Response to FOIA Request for Records.Records in App J Encl & Being Made Available in Pdr.Records in App K Partially Withheld (Ref Exemption 7C))
- ML20205M043 + (Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR)
- ML20235H335 + (Eighth Partial Response to FOIA Request.App F Documents Re Pullman Power Products,Available in Pdr.App G Documents Encl & Available in PDR & Lpdr)
- ML20135F266 + (Eighth Partial Response to Rorem 850702 First Set of QA Interrogatories & Request to Produce.Qa Audit Program Comprehensive.Certificate of Svc & Audit Repts Encl.Related Correspondence)
- CNL-15-066, Eighth Progress Update on Improved Flood Mitigation System Project + (Eighth Progress Update on Improved Flood Mitigation System Project)
- ML15098A199 + (Eighth Progress Update on Improved Flood Mitigation System Project)
- CPSES-200600269, Eighth Refueling Outage (2RF08) Steam Generator Twelve Month Report + (Eighth Refueling Outage (2RF08) Steam Generator Twelve Month Report)
- ML20046B535 + (Eighth Refueling Outage Inservice Insp Summary Rept)
- CPSES-200200376, Eighth Refueling Outage Steam Generator Twelve Month Special Report 1-SR-02-001-00 + (Eighth Refueling Outage Steam Generator Twelve Month Special Report 1-SR-02-001-00)
- ML20083G391 + (Eighth Request for Interrogatories on Contention VI-1 Re Audit Repts)
- ML20151Y179 + (Eighth Semiannual Staff Evaluation of Status of Nprds)
- ML20088A159 + (Eighth Set of Interrogatories & Requests for Production of Documents.Certificate of Svc Encl.Related Correspondence)
- ML20041E070 + (Eighth Set of Interrogatories & Requests to Produce. Certificate of Svc Encl.Related Correspondence)
- ML20137P630 + (Eighth Set of Interrogatories & Requests for Production of Documents Re Adequacy of Existing QA Program Described in FSAR Through 851115 Amend 52 & Util Ltrs Through 860110. Certificate of Svc Encl.Related Correspondence)
- ML19312D055 + (Eighth Set of Interrogatories Directed to Applicant.Includes Questions on Control Room Displays for Valves & Other Remotely Controlled Instruments,On Control Room Design & on steel-liner Bulge.Power Interchange Table Encl for Updating)
- ML20072R739 + (Eighth Set of Interrogatories on Contentions Re ALARA & Emergency Planning.Certificate of Svc Encl.Related Correspondence)
- ML20028A318 + (Eighth Set of Interrogatories.Certificate of Svc Encl. Related Correspondence)
- RS-18-059, Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident + (Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident)
- RS-18-058, Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under . + (Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under .)
- RS-18-060, Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable . + (Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable .)
- JAFP-17-0018, Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051))
- ML17045A608 + (Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049), PLA-7570)
- CNL-18-084, Eighth Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions + (Eighth Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions)
- ML17059D129 + (Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events)
- RS-17-021, Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events + (Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events)
- CNL-17-016, Eighth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (Eighth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049))
- JAFP-17-0017, Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events + (Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events)
- RS-17-022, Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events + (Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events)
- RS-17-019, Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events + (Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events)
- NL-18-0870, Eighth Six-Month Status Report of the Implementation of the Commission Order with Regard to Requirements for Reliable Hardened Containment Vents (EA-13-109) + (Eighth Six-Month Status Report of the Implementation of the Commission Order with Regard to Requirements for Reliable Hardened Containment Vents (EA-13-109))