Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML100550590 + (Developmental Revision B - Technical Specifications Bases B 3.6 - Containment Systems)
- ML100550494 + (Developmental Revision B - Technical Specifications Bases B 3.1 - Reactivity Control Systems)
- ML100550326 + (Developmental Revision B of the Technical Specifications (Ts), TS Bases, Technical Requirements Manual (Trm), TRM Bases, and Pressure and Temperature Limits Report (PTLR))
- ML19352B294 + (Developmental Verification of PINSIM-MOD2)
- ML20129H053 + (Deviation Analysis Rept 212 Re Dresser Industries Diaphragm Seal Globe Valves.Approx 60% of Unit 1 Valves Tested & Satisfied Acceptance Criteria.Next Rept Expected at Completion of Mod Program.Part 21 Related)
- ML20128M527 + (Deviation Analysis Rept 213 Re Failure of Borg-Warner 20-inch Gate Valves.Investigation Incomplete.Interim or Final Rept Expected When Addl Info Available)
- ML20128P746 + (Deviation Analysis Rept 234 Re Effect of Change in Soil Parameters on Diesel Generator Bldg Floor Response Spectra. Initially Reported on 850418.Reevaluation by Gilbert/Commonwealth,Inc Will Be Completed by 850531)
- ML20091J837 + (Deviation Document,Draft 1 to Emergency Operating Procedure EOP-0, Reactor Trip or Safety Injection)
- ML20195G581 + (Deviation Investigation Rept 88-076-00:on 880516,diesel Genrator 1B Uncontrollably Loaded During Monthly Operability Surveillance.Caused by 3IMX Relay Failure.Load Reduced W/ Governor Control Switch & Subj Relay Replaced)
- ML20058A368 + (Deviation Investigation Rept 90-026-00:on 900815,EDG 2A Cylinder 10L Dislocated Pushrod Due to Collapsed Hydraulic Lifter)
- NL-17-1490, Deviation for Shroud Support Vertical Welds. BWRVIP-76 (Rev. 1-A) + (Deviation for Shroud Support Vertical Welds. BWRVIP-76 (Rev. 1-A))
- SVPLTR 20-0053, Deviation from BWR Vessel and Internals Project (BWRVIP) Guideline - Inspection of Unit 3 Top Guide Rim Weld + (Deviation from BWR Vessel and Internals Project (BWRVIP) Guideline - Inspection of Unit 3 Top Guide Rim Weld)
- ML071210586 + (Deviation from BWR Vessel and Internals Project (BWRVIP) Guideline - Core Shroud)
- SVP-16-044, Deviation from BWR Vessel and Internals Project (Swavip) Guidelines Inspection Core Shroud Welds + (Deviation from BWR Vessel and Internals Project (Swavip) Guidelines Inspection Core Shroud Welds)
- SVPLTR 14-0023, Deviation from BWR Vessel and Internals Project Guidelines -Unit 3 Jet Pump 11 Holddown Beam Inspection + (Deviation from BWR Vessel and Internals Project Guidelines -Unit 3 Jet Pump 11 Holddown Beam Inspection)
- ML16202A062 + (Deviation from BWR Vessel and Internals Project (BWRVIP) Guidelines - Surface Condition of Certain Welds for Replacement Steam Dryers)
- SVPLTR 11-0050, Deviation from BWR Vessel and Internals Project Guideline for Steam Dryer Lifting Lug Repair Weld Filler Metal + (Deviation from BWR Vessel and Internals Project Guideline for Steam Dryer Lifting Lug Repair Weld Filler Metal)
- SVP-14-049, Deviation from BWR Vessel and Internals Project (BWRVIP) Guidelines - Inspection of RB-2 Welds + (Deviation from BWR Vessel and Internals Project (BWRVIP) Guidelines - Inspection of RB-2 Welds)
- ML062200457 + (Deviation from BWR Vessel and Internals Project (BWRVIP) Guideline)
- SVP-24-054, Deviation from BWR Vessel and Internals Project (BWRVIP) Guidelines - Inspection of Top Guide Rim Welds + (Deviation from BWR Vessel and Internals Project (BWRVIP) Guidelines - Inspection of Top Guide Rim Welds)
- NMP1L3659, Deviation from BWR Vessel and Internals Project (BWRVIP) Guidelines – Inspection of Core Spray Welds + (Deviation from BWR Vessel and Internals Project (BWRVIP) Guidelines – Inspection of Core Spray Welds)
- RS-11-053, Deviation from BWR Vessel and Internals Project Guideline - Inspection of the Core Plate Bolts + (Deviation from BWR Vessel and Internals Project Guideline - Inspection of the Core Plate Bolts)
- NMP2L2930, Deviation from BWR Vessel and Internals Project (BWRVIP) Guidelines - Inspection of Control Rod Guide Tube Welds + (Deviation from BWR Vessel and Internals Project (BWRVIP) Guidelines - Inspection of Control Rod Guide Tube Welds)
- ML15113A301 + (Deviation from BWRVIP Flaw Evaluation Requirements for Jet Pump Riser Indication)
- BVY 08-013, Deviation from BWRVIP-130 + (Deviation from BWRVIP-130)
- L-19-161, Deviation from BWRVIP-139 Revision 1-A: BWR Vessel and Internals Project, Steam Dryer Inspection and Flaw Evaluation Guidelines + (Deviation from BWRVIP-139 Revision 1-A: BWR Vessel and Internals Project, Steam Dryer Inspection and Flaw Evaluation Guidelines)
- NLS2015075, Deviation from BWRVIP-18 and BWRVIP-41 Inspection Requirements Cooper Nuclear Station + (Deviation from BWRVIP-18 and BWRVIP-41 Inspection Requirements Cooper Nuclear Station)
- GO2-15-139, Deviation from BWRVIP-25 Guidance for Inspection Requirements + (Deviation from BWRVIP-25 Guidance for Inspection Requirements)
- ML110960415 + (Deviation from BWRVIP-25 Inspection Requirements)
- PLA-6712, Deviation from BWRVIP-25 Inspection Requirements + (Deviation from BWRVIP-25 Inspection Requirements)
- GO2-11-093, Deviation from BWRVIP-25 Inspection Requirements + (Deviation from BWRVIP-25 Inspection Requirements)
- NLS2011035, Deviation from BWRVIP-25 Inspection Requirements + (Deviation from BWRVIP-25 Inspection Requirements)
- LR-N11-0105, Deviation from BWRVIP-25 Inspection Requirements + (Deviation from BWRVIP-25 Inspection Requirements)
- JAFP-11-0043, Deviation from BWRVIP-25 Inspection Requirements + (Deviation from BWRVIP-25 Inspection Requirements)
- BVY 11-024, Deviation from BWRVIP-25 Inspection Requirements + (Deviation from BWRVIP-25 Inspection Requirements)
- L-MT-11-028, Deviation from BWRVIP-25 Lnspection Requirements + (Deviation from BWRVIP-25 Lnspection Requirements)
- L-22-052, Deviation from BWRVIP-42 Revision 1-A, BWR Vessel and Internals Project, Low Pressure Coolant Injection (LPCI) Coupling Inspection and Flaw Evaluation Guidelines + (Deviation from BWRVIP-42 Revision 1-A, BWR Vessel and Internals Project, Low Pressure Coolant Injection (LPCI) Coupling Inspection and Flaw Evaluation Guidelines)
- L-MT-14-002, Deviation from Bwrvi P-181-A Solution Annealing/Weld Inspection Requirement + (Deviation from Bwrvi P-181-A Solution Annealing/Weld Inspection Requirement)
- LR-N15-0128, Deviation from EPRI Document 3002000091 Inspection Requirements + (Deviation from EPRI Document 3002000091 Inspection Requirements)
- LR-N21-0039, Deviation from EPRI Document 33002012244 Inspection Requirements + (Deviation from EPRI Document 33002012244 Inspection Requirements)
- 1CAN010904, Deviation from EPRI Guideline - Steam Generator Chemistry Specification + (Deviation from EPRI Guideline - Steam Generator Chemistry Specification)
- 1CAN030906, Deviation from EPRI Guideline Steam Generator Chemistry Specification + (Deviation from EPRI Guideline Steam Generator Chemistry Specification)
- L-2013-314, Deviation from EPRI MRP-146 Revision I Inspection Schedule - NEI 03-08 Needed Work Product Element - for Information Only + (Deviation from EPRI MRP-146 Revision I Inspection Schedule - NEI 03-08 Needed Work Product Element - for Information Only)
- L-2009-128, Deviation from EPRI MRP-146 Ultrasonic Examination Schedule - NEI 03-08 Needed Work Product Element + (Deviation from EPRI MRP-146 Ultrasonic Examination Schedule - NEI 03-08 Needed Work Product Element)
- L-2025-148, Deviation from EPRI MRP-227 + (Deviation from EPRI MRP-227)
- ENS 41723 + (Deviation from Integrated Safety Analysis, and a 24 Hour Notification - Bulletin 91-01 Criticality Control)
- L-19-222, Deviation from MRP-227-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines + (Deviation from MRP-227-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines)
- L-15-250, Deviation from MRP-227A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines + (Deviation from MRP-227A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines)
- 1CAN031003, Deviation from NEI Guideline - RCS Leakage Action Levels + (Deviation from NEI Guideline - RCS Leakage Action Levels)
- ML060720202 + (Deviation from the Reactor Oversight Process Action Matrix to Provide Increased NRC Oversight of Specific Issues at Indian Point Energy Center)
- ML100990458 + (Deviation from the Reactor Oversight Process to Provide Increase NRC Oversight to Specific Issues at Vermont Yankee Nuclear Power Station)
- ML12258A042 + (Deviation from the Reactor Oversight Process Action Matrix)
- ENS 55639 + (Deviation of Delivery Procedure by Common Carrier Staff Leaving Radioactive Material Unattended)
- ML19242B020 + (Deviation of Floor Responses Reactor Bldg)
- ENS 53841 + (Deviation of Ts 3.3.A(1) for Anti-Siphon Device Found Inoperable)
- ML040820964 + (Deviation to Action Matrix to Continue Heightened NRC Oversight of Indian Point Nuclear Generating Unit 2 - Memo to Travers from Miller Thru Dyer)
- ML23265A012 + (Deviation to Far 19 Due to Ultima)