Deviation Analysis Rept 213 Re Failure of Borg-Warner 20-inch Gate Valves.Investigation Incomplete.Interim or Final Rept Expected When Addl Info Available
ML20128M527
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 05/15/1985
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
(RDC-121(84)), 213, NUDOCS 8505310686
Download: ML20128M527 (2)


Text

, y DMO t THE CLEVELAND ELECTR P.O. BOX 5000 - CLEVELAND. OHIO 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLDG. - 55 PUBLICSQUARC Serving The Best Location in the Nation MURRAY R. EDELMAN vice mSIDENT May 15, 1985 NUCLE A R PY-CEI/OIE-0047 LQ Mr. James. G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE: Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Borg-Warner 20 Inch Gate Valve [RDC 121(84)]

Dear Mr. Keppler:

As reported in letters transmitted to your office on November 30, 1984 and March 15, 1985, the Cleveland Electric Illuminating Company (CEI) is investigating the failure of several Borg-Warner gate valves to operate properly. This failure was reported as a potentially significant deficiency and is being investigated under Deviation Analysis Report 213.

This letter is to inform you that CEI's investigation of this de-ficiency has not been completed. Additional time is necessary for CEI to assure that other models and sizes of Borg Warner gate valves supplied to Perry Nuclear Power Plant are not susceptible to similar problems.

Another report on this item, either interim or final will be pro-vided when additional information is available.

Sincerely, Murray R. Ede Vice President Nuclear Group MRE:sab 8505310606 85 j40 PDR ADOCK O PDR S

MAY 20 1999 Ifo IMD 7

-_ Mr.'Jcmes G. K;pplor  !

PY-CEI/OIE-0047 LQ '

l

'May 15, 1985 l Page 2 i

cc: Mr. J. A.-Grobe USNRC, Site Office Mr. D. E. Keating ,

USNRC, Site Office Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 U.S. Nuclear Regulatory Commission ,

c/o Document Management Branch Washington,_D.C. 20555 Records Center, SEE-IN Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339

.