Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Clarify Use and Application Rules". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20079D680  + (Clarifies from Connecticut Power & Light Co & Public Svc Co of New Hampshire.Ferc Has Not Decided on City of Holyoke Gas & Electric Dept Arguments as to New Hampshire Corridor)
  • ML20154H372  + (Clarifies near-term Nrc/Doe Comparability Recommendations of Posting Guards at Matl Access Area Portals & Discusses Definition of Matl Access Area)
  • LD-83-054, Clarifies plant-specific Info Needed Re CESSAR-F Supplemental Ser,Section 4.4.6, Statistical Combination of Uncertainties. No plant-specific Submittal Planned Since Verification of Values to Be Documented Internally  + (Clarifies plant-specific Info Needed Re CESSAR-F Supplemental Ser,Section 4.4.6, Statistical Combination of Uncertainties. No plant-specific Submittal Planned Since Verification of Values to Be Documented Internally)
  • ML19351D457  + (Clarifies to J Axelrad of EPA About 800604 Meeting on Possible Misinterpretation of Statements Re 10CFR60 Changes)
  • ML20010H689  + (Clarifies to Jr Miller Re Dismantling Plan.Areas Covered by License R-47 Will Be Transferred to License SNM-778 by Separate Action to Be Taken Subsequent to Final IE Insp.Requested Environ Info Encl)
  • ML20203P944  + (Clarifies to NRC Re Spds.Forwards Rev 2 to Procedure EIP-30, Isolator Circuit Differential High Voltage Fault Test Procedure)
  • ML20064G396  + (Clarifies to NRC Re Survey Monitoring & Tech Spec Surveillance Requirements.Points Out That Many of the Survey Points Differ Re Established Base Line Survey Compared to Bases Stated in Tech Spec.No Safety Implications in Change)
  • ML20248B361  + (Clarifies,In Writing,Tennessee Perspective Re Regulation of DOE Facilities Operated by Various Contractors)
  • TSTF-265  + (Clarify 3.4 NON-OPERATING LOOP SRS)
  • TSTF-568  + (Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2)
  • TSTF-534  + (Clarify Application of Pressure Boundary Leakage Definition)
  • TSTF-493  + (Clarify Application of Setpoint Methodology for LSSS Functions)
  • TSTF-474  + (Clarify Bases of Vacuum Breaker Functional Test Frequency)
  • ML13151A033  + (Clarify Communication Responsibilities at Rhode Island Nuclear Science Center While Searching for New Director)
  • TSTF-438  + (Clarify Exception Notes to Be Consistent with the Requirement Being Excepted)
  • TSTF-153  + (Clarify Exception Notes to Be Consistent with the Requirement Being Excepted)
  • TSTF-526  + (Clarify LCO 3.8.1 SR Notes Regarding Momentary Transients Outside the Load Band)
  • TSTF-053  + (Clarify Manual Porvs Are Capable of Mitigating an Overpressure Event)
  • TSTF-275  + (Clarify Requirement for EDG Start Signal on RPV Level - LOW, LOW, LOW During RPV Cavity FLOOD-UP)
  • TSTF-530  + (Clarify SR 3.0.3 to Be Consistent with Generic Letter 87-09)
  • TSTF-558  + (Clarify SR Bases Added by TSTF-523)
  • TSTF-400  + (Clarify SR on Bypass of DG Automatic Trips)
  • TSTF-524  + (Clarify Th Application of SR 3.0.2 to SR 3.1.3.2, Mtc)
  • TSTF-147  + (Clarify That RPS and ESFAS Matrix Logic Testing Does Not Affect Operability)
  • TSTF-211  + (Clarify That Remove All Power to the CRD System Means Remove Power to CRD Trip Breakers)
  • TSTF-543  + (Clarify Verification of Time Constants)
  • TSTF-046  + (Clarify the CIV Surveillance to Apply Only to Automatic Isolation Valves)
  • TSTF-464  + (Clarify the Control Rod Block Instrumentation Required Action)
  • TSTF-335  + (Clarify the Ice Basket 20 Basket Weight Criteria)
  • TSTF-555  + (Clarify the Nuclear Instrumentation Bases Regarding the Detection of an Improperly Loaded Fuel Assembly)
  • TSTF-109  + (Clarify the Qptr Surveillances)
  • ML19098B470  + (Clarifying Certain Statements Reported in NRC Summary Re Fracture Toughness Requirements of Unit 1 Reactor Vessel)
  • ML20211G647  + (Clarifying Decision on Remand Re Adequacy of Nassau County Veterans Memorial Coliseum as Reception Ctr for Monitoring, Decontaminating & Transferring of Evacuees to Sheltering Facilities in Event of Emergency.Served on 861030)
  • ML19030A863  + (Clarifying How Fall 1976 and Spring 1979 Commercial Operation Dates Relate to the Reduced Rate of Load Growth)
  • RS-09-017, Clarifying Information Concerning Request to Implement Subsequent Edition of ASME OM Code, Subsection ISTC, Inservice Testing of Valves in Light-Water Reactor Nuclear Power Plants  + (Clarifying Information Concerning Request to Implement Subsequent Edition of ASME OM Code, Subsection ISTC, Inservice Testing of Valves in Light-Water Reactor Nuclear Power Plants)
  • ULNRC-05353, Clarifying Information Regarding Application for License Amendment to Revise Technical Specification 3.6.7, Recirculation Fluid Ph Control System  + (Clarifying Information Regarding Application for License Amendment to Revise Technical Specification 3.6.7, Recirculation Fluid Ph Control System)
  • ML15075A026  + (Clarifying Information Related to Response to Request for Additional Information Proposed License Amendment Request Permanent Fifteen-Year Type a Test Interval)
  • ML122790101  + (Clarifying Information for Question No. 4 (with Attachment))
  • ML023440140  + (Clarifying Information for Radiological Emergency Response Plan Change Submitted May 6, 2002 for Callaway Plant)
  • ML18227B286  + (Clarifying Proposed Tech Spec Changes Re Allowing Full PWR Operation with Up to 25% of Steam Generator Tubes Plugged, Pertaining to Reactor Core Thermal Hydraulic Limits)
  • ML102090751  + (Clarifying Relief Request No. 16 Nozzle-to-Vessel Weld Exam)
  • ML110740158  + (Clarifying Response to Request for Additional Information: License Amendment Request 236, Automatic Operation of Transformer Load Tap Changers)
  • TSTF-434  + (Clarifying SR 3.0.1 Bases to State That Surveillance CAN Be Performed in Steps)
  • ML18192A287  + (Clarifying Statements Made in PVNGS Environmental Report Concerning Use of Waste Water for Cooling Purpose. Maximum Use of Waste Water for Application Will Be Approximately 75,800 acre-feet Per Year as Stated in the Report)
  • RIS 2005-02, Clarifying the Process for Making Emergency Plan Changes  + (Clarifying the Process for Making Emergency Plan Changes)
  • ML103640433  + (Clark County, Nevadas Fourth Certification of No Additional Party Witnesses)
  • ML103640434  + (Clark County, Nevadas Fourth Certification of No Additional Other Witnesses)
  • ML103630504  + (Clark County, Nevadas Notice of Certification of LSN Supplementation)
  • ML20135E098  + (Clark County,Nv Dept of Comprehensive Planning,Nuclear Waste Div Comments on DSI-6, High-level Waste & Spent Fuel)
  • ML20135D921  + (Clark County,Nv Dept of Comprehensive Planning,Nuclear Waste Div Comment on DSI-14, Public Communication Initiatives)