Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206E981 + (City of Tallahassee,Fl Comprehensive Annual Financial Rept for Yr Ended 980930)
- ML20245F649 + (City of Tallahassee,Fl Comprehensive Annual Financial Rept for Fiscal Year Ended 880930)
- ML15344A359 + (City of Zion, Draft Comprehension Plan Update)
- ML23052A197 + (Civaderm Guidance)
- ML051450396 + (Civil 3.5, Original Section 3 Tables for the Palisades Nuclear Plant, Units 1 and 2, License Renewal Application)
- ML20003B665 + (Civil Action 81-0003,A Bratic,Et Al Vs Met Ed,Et Al in Us District Court for Middle District of Pa.Alleges Negligence Causing Increased Probability of Cancer, Physical & Mental Damage & Decreased Property Value)
- ML042010103 + (Civil Appeal Scheduling Order 1 for a Pre-argument Conference, Dated 3/24/04)
- ML041070273 + (Civil Appeal Scheduling Order 1, Dated 3/24/04)
- IR 015000037/2024002 + (Civil Design Solutions, Inc; NRC Form 591M Part 1, Inspection Report No. 15000037/2024002)
- ENS 44393 + (Civil Disturbance at the North Anna Nuclear Information Center)
- ML20261B623 + (Civil Location Plan)
- ML17276A682 + (Civil Overall Site & Vicinity Plan)
- ML17276A672 + (Civil Overall Site & Vicinity Plan:Drainage Flow Zones)
- ML23089A367 + (Civil Penalty Invoice EA-22-086, LES - Enclosure 3)
- ML23009B658 + (Civil Penalty Payment Acknowledgment Letter - Banner Health Wyoming Medical Center (EA-22-061))
- ML19312A102 + (Civil Penalty Payment Confirmation (EA-18-066))
- ML20261E501 + (Civil Site STORM Drainage Plan - North Half.Drawing Not Dtd)
- ML20261E496 + (Civil Site STORM Drainage Plan - South Half.Drawing Not Dtd)
- ML20054C728 + (Civil Subpoena Duces Tecum Directed to Pl Hourihan to Appear in Phoenix,Az on 820419.Affidavit of Svc of Process Encl. Related Correspondence)
- ML20039C730 + (Civil-structural Design Criteria for Recovery Facilities)
- ML20090K926 + (Civil/Structural Drawing Control Log)
- ML20151E469 + (Civil/Structural Tests Re Hilti Expansion Anchors Installed in Coredrilled Holes & Richmond Inserts W/Partial Bolt Engagements)
- ML20262D548 + (Civil:Location and Layout Plan,General Profile)
- ML19332A075 + (Cladding Creep (Ccstrn & Ccstrs) Fuel Behavior Model Development, Interim Rept)
- ML20147D930 + (Cladding Damage Analysis of Core II Burnable Poison Rods)
- ML20105A279 + (Cladding Definition Discussion Conversation Record)
- ML20058A745 + (Cladding Deformation Models for Scdap, Interim Rept. Microfiche Encl)
- ENS 42140 + (Cladding Failure to One Spent Fuel Rod Found During Inspection of Spent Fuel in the Spent Fuel Pool)
- ML18078A489 + (Cladding Flaws Detected May 1976 in Unit 1 Steam Generator 14 Have Been Inspec W/Ultrasound & Tv.Interprets Tech Specs as Limiting Tv Inspecs to Areas Where Results Can Be Correlated W/Ultrasound Inspecs)
- ML19242A345 + (Cladding Mechanical Limits (Cmlimt), Interim Rept)
- ML19323B580 + (Cladding Stress at Failure, Presented at Seventh Water Reactor Safety Info Meeting,791105-09)
- ML19323B315 + (Cladding Swelling & Rupture Models for LOCA Analysis)
- ML19257C060 + (Cladding Swelling & Rupture Models for LOCA Analysis)
- ML20261L540 + (Claiborne Enrichment Ctr,Plot Plan Figure 1.2-2. 6046-06-1600.00-0001)
- ML19345D768 + (Claim for Damages in Amount of $4,010,000,000 Based on NRC Alleged Negligence of Failure to Inform Util of Previous Similar Occurrence at Davis-Besse)
- ML20037A154 + (Claims Info Required by 10CFR73.40(b) & Append C,A Safeguards Contingency Plan,Is Already Contained in Physical Security Plan or in Formal Agreement W/Local Police.Forwards Police Agreement & Security Plan Key,Both Proprietary)
- ML18299A073 + (Claims Injury Worker Handbook)
- ML20037C982 + (Claims That Media & Press Presented False Picture of Tmi. Suggests NRC Listen to Knowledgeable Scientists)
- ML20127B608 + (Clam Shell Filter Blanket Test Rept)
- ML20262D154 + (Clamp Body Machined 12 Inch Gate Valve. Sheet 1 of 1)
- ML20094P721 + (Clamp Induced Stress on Hope Creek Main Steam Piping Lines C & D)
- ML20094P718 + (Clamp Induced Stress on Hope Creek Recirculation Piping)
- ML20265D316 + (Clamp Ring.Sheet 1 of 1)
- 05000321/LER-1981-021-01, Clamps on Two Safety Relief Valve Discharge Line Ramsheads Found Broken During Piping Support Walkdown Per IE Bulletin 79-14.Caused by Fatigue & Stress Corrosion.Supports Redesigned + (Clamps on Two Safety Relief Valve Discharge Line Ramsheads Found Broken During Piping Support Walkdown Per IE Bulletin 79-14.Caused by Fatigue & Stress Corrosion.Supports Redesigned)
- ML18107A134 + (Clarcor, Inc., Annual Registration of Devices)
- ML022490301 + (Clarification & Changes to Requests for Relief 2-ISI-16 & 2-ISI-17 ASME, Section XI, Inservice Inspection Program)
- ML20023C617 + (Clarification & Supplementation of 830303 Responses to 830131 Interrogatories & Request for Production of Documents.Certificate of Svc Encl.Related Correspondence)
- ML20053D064 + (Clarification & Supplementation of Responses to Eleventh Set of Interrogatories Re Issues for Further Litigation)
- ML21257A379 + (Clarification Call 2 Re Request for Additional Information Pilgrim - License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Plan)
- ML24085A803 + (Clarification Call Addressing Draft RSI-5 for Holtec HI-STORM Umax Amendment 5 Review)
- ML21238A275 + (Clarification Call Regarding RAI License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Plan)