Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20246P168 + (Changes,Tests & Experiments Re TMI-2 Recovery Activities)
- HNP-99-086, Changes,Tests & Experiments, for Harris Nuclear Plant.Rept Provides Brief Description of Changes to Facility & Summary & of SE for Each Item That Was Implemented Under 10CFR50.59 Between 970608-981128.With + (Changes,Tests & Experiments, for Harris Nuclear Plant.Rept Provides Brief Description of Changes to Facility & Summary & of SE for Each Item That Was Implemented Under 10CFR50.59 Between 970608-981128.With)
- ML20210J433 + (Changes,Tests, & Experiments Carried Out Without Prior Commission Approval for Period 981101-990331.With USAR Changes Other than Those Resulting from 10CFR50.59)
- ML111450889 + (Changing a Schedule Conveyed by a Letter Dated 2/24/11 in Support of a Proposed Amendment Regarding the Large-break LOCA Analysis)
- ML20266E242 + (Channel A,B,C & D Test Panel Front of Panel Layout. Sheet 1 of 1)
- 05000416/LER-1983-181-03, Channel C as-found Setpoints for Undervoltage Trip Were 116.2-volt Ac.Cause Unknown.Voltage Adjusted within Desired Range + (Channel C as-found Setpoints for Undervoltage Trip Were 116.2-volt Ac.Cause Unknown.Voltage Adjusted within Desired Range)
- ML20262D737 + (Channel Foot Assy (Left))
- ML20262D739 + (Channel Foot Assy (Right))
- ML20266J018 + (Channel Housing)
- ML20262H797 + (Channel II Block Diagram. Sheet 3 of 19)
- ML20262A619 + (Channel II Block Diagram. Sheet 3 of 19.No Rev Date)
- ML20262H787 + (Channel IV Block Diagram. Sheet 2 of 19)
- ML20262A628 + (Channel IV Block Diagram. Sheet 2 of 19.No Rev Date)
- ML20259B125 + (Channel IV Block Diagram. Sheet 2 of 19.No Rev Date)
- 05000416/LER-1982-153-99, Channel a Wind Direction Sensor at Elevation 162 Ft Found Giving Suspect Indication. Cause Not Stated.Sensor Replaced,Tested & Confirmed Functioning + (Channel a Wind Direction Sensor at Elevation 162 Ft Found Giving Suspect Indication. Cause Not Stated.Sensor Replaced,Tested & Confirmed Functioning)
- ML20260K101 + (Channels L-1114,1115,L-1124 & L-1125:Interconnection Diagram. Sheet 1 of 2)
- ML20053A377 + (Chapel Hill Anti-Nuclear Group Effort/Environ Law Project Response to Applicant 820518 Motion for Extension of Time. Petitioner Does Not Object to Request But Then NRC Appears Not to Be Neutral.Certificate of Svc Encl)
- ML14140A010 + (Chapter 0.0 Manual Cover (0214))
- ML20205F319 + (Chapter 0116, Organization & Functions Office of Governmental & Public Affairs)
- ML20205F306 + (Chapter 0124, Organization & Functions Office of Nuclear Material Safety & Safeguards)
- ML20094M849 + (Chapter 0516 SALP, Describing Basis Structure & Overall Procedures for Implementation of NRC Program to Assess Licensee Performance.Ma Miller marked-up Memo Re Evaluation of SALP Encl)
- ML20321A095 + (Chapter 1 - General Information for Evaluation)
- ML030420526 + (Chapter 1 - Safety Evaluation Report with Open Items Related to the License Renewal of St. Lucie Nuclear Plant, Units 1 & 2)
- ML022270589 + (Chapter 1 Draft SER with Open Items, Introduction and General Discussion)
- ML20343A190 + (Chapter 1 General Evaluation Information)
- ML25108A140 + (Chapter 1 and 2 RAIs Set 13 for the TRISO-X License Application Review)
- ML19329E134 + (Chapter 1 of AR Nuclear 1 PSAR, Introduction & Summary. Includes Revisions 1-18)
- ML19319D678 + (Chapter 1 of Crystal River 3 & 4 PSAR, Introduction & Summary. Includes Revisions 1-10)
- ML19319C280 + (Chapter 1 of Davis-Besse PSAR, Introduction & Summary. Includes Revisions 1-8)
- ML19322A787 + (Chapter 1 of Oconee 1,2 & 3 PSAR, Introduction & Summary. Includes Revisions 1-6)
- ML20084P664 + (Chapter 1 of RESAR-SP/90 Westinghouse Advanced PWR Module 2, Regulatory Conformance, Introduction)
- ML20128P676 + (Chapter 1 of RESAR-SP/90 Westinghouse Advanced PWR Module 11, Radiation Protection, Introduction & General Description of Plant)
- ML20090J845 + (Chapter 1 of RESAR-SP/90 Westinghouse Advanced PWR Module 3, Introduction & Site, Introduction & General Description of Plant)
- ML20099H973 + (Chapter 1 of RESAR-SP/90 Westinghouse Advanced PWR Module 9, Instrumentation & Controls & Electric Power, Introduction & General Description of Plant)
- ML20106E655 + (Chapter 1 of RESAR-SP/90 Westinghouse Advanced PWR Module 7, Structural/Equipment Design, Introduction & General Description of Plant)
- ML19329D983 + (Chapter 1 of Rancho Seco PSAR, Introduction & Summary. Includes Revisions 1-4)
- ML19312A205 + (Chapter 1 of S&W SWESSAR-P1, Introduction & General Description of Plant)
- ML19309A544 + (Chapter 1 of VA Polytechnic Inst & State Univ Research & Training Reactor PSAR, Introduction)
- ML20128L838 + (Chapter 1 of Westinghouse RSAR, Internal Initiating Events)
- ML20030A334 + (Chapter 1 to Final Hazards Summary Rept for Big Rock Point, Introduction & Conclusions)
- ML20049H264 + (Chapter 1 to Gessar, Introduction & General Description of Plant)
- ML20008D754 + (Chapter 1 to Midland 1 & 2 PSAR, Introduction & Summary. Includes Revisions 1-36)
- ML20030A434 + (Chapter 1 to Preliminary Hazards Summary Rept for Big Rock Point, Introduction,)
- ML19347A382 + (Chapter 1 to State Univ of Ny at Buffalo Final Hazards Summary Rept,Revision 2, Introduction)
- ML19309C538 + (Chapter 1 to TMI-1 PSAR, Introduction & Summary. Includes Revisions 1-11)
- ML19341C515 + (Chapter 1 to Univ of Tx Triga Mark I RSAR, Introduction & Summary)
- ML20008E430 + (Chapter 1 to Yankee Rowe Final Hazards Summary Rept, Nuclear Reactor Design)
- ML20008E425 + (Chapter 1 to Yankee Rowe Preliminary Hazards Summary Rept, Nuclear Reactor Design. Includes Revisions Through 581201)
- ML20011D735 + (Chapter 1, Introduction & Conclusions to Updated Final Hazards Summary Rept for Big Rock Point Plant)
- ML20207S258 + (Chapter 1, Introduction & General Description of Plant, to Nonproprietary RESAR-SP/90 Westinghouse Advanced PWR, Module 10, Containment Sys)
- ML20247G666 + (Chapter 1, Introduction & General Plant Description, to CESSAR Sys 80+ Std Design.W/One Oversize Encl)