Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19065A297 + (CFR 21 Follow-up Report for General Electric Hitachi (GEH) Relay Contact Cartridge DJ148C6159P001)
- ML12068A372 + (CFR 21 Interim Report - Cracks in Residual Heat Removal Pump Motor Stator Frames)
- ML12145A670 + (CFR 21 Interim Report - Unexpected Degradation of Vital Batteries III and IV)
- ML072630549 + (CFR 21 Notification - Identification of Defect Problem Investigation Process No.: O-04-5550)
- ML072630547 + (CFR 21 Notification - Identification of Defect Problem Investigation Process No.: O-04-5550)
- ML063120422 + (CFR 21 Notification - Identification of Defect Problem Investigation Process No.: O-03-4686)
- ML052640220 + (CFR 21 Notification - Identification of Defect)
- ML081960118 + (CFR 21 Notification - Identification of Defect, Issue Report 741412)
- ML25352A029 + (CFR 21 Notification for Emergency Diesel Generator Cylinder Chrome Delamination - 58091-EN 58091 - Ccn 25-098 EDG)
- ML033040401 + (CFR 21 Notification for GE Magne-Blast Breaker Tune & Piston Assemblies)
- 05000323/LER-2006-001, CFR 21 Notification of a Defective Residual Heat Removal Check Valve + (CFR 21 Notification of a Defective Residual Heat Removal Check Valve)
- ML103350168 + (CFR 21 Notifications - Identification of Defect, Mackson Inc. - Defective Tube Steel)
- ML24302A240 + (CFR 21 Report 1-BY-BC-1-LV Battery Charger)
- JAFP-11-0089, CFR 21 Report Concerning Defective Rosemount Model 710DU Master Trip Units + (CFR 21 Report Concerning Defective Rosemount Model 710DU Master Trip Units)
- ML24018A011 + (CFR 21 Report Emergency Diesel Generator Fuel Oil Piping)
- NL-08-0646, CFR 21 Report, GEH CR120A Relay/Relay Coil Wire Clamp Cracking + (CFR 21 Report, GEH CR120A Relay/Relay Coil Wire Clamp Cracking)
- ML24010A213 + (CFR 21.21 Final Report Regarding Siemens Medium Voltage Circuit Breakers)
- ML082950486 + (CFR 26 Unsatisfactory Fitness-For-Duty Program Blind Performance Testing Result)
- B18944, CFR 26, Appendix a, Subpart B, Section 2.8(e)(4) Report Unsatisfactory Laboratory Performance Test + (CFR 26, Appendix a, Subpart B, Section 2.8(e)(4) Report Unsatisfactory Laboratory Performance Test)
- ULNRC-06412, CFR 26, Subpart I - Managing Fatigue, for Period Ending December 31, 2017 + (CFR 26, Subpart I - Managing Fatigue, for Period Ending December 31, 2017)
- ML110590705 + (CFR 26, Subpart I - Managing Fatigue, for Period of 2010)
- ML20269A354 + (CFR 26.717 Reports 2019 Transmittal Email)
- DCL-12-115, CFR 26.719(c) Notification + (CFR 26.719(c) Notification)
- NL-15-0966, CFR 26719(c)30-day Report False Negative Results for Blind Performance Test Sample + (CFR 26719(c)30-day Report False Negative Results for Blind Performance Test Sample)
- DCL-08-083, CFR 26; Appendix a Notification, Subpart B, Section 2.8 (e)(4), Submittal of Report of Investigation Into an Unsatisfactory Performance Test Result Associated with Fitness for Duty Program + (CFR 26; Appendix a Notification, Subpart B, Section 2.8 (e)(4), Submittal of Report of Investigation Into an Unsatisfactory Performance Test Result Associated with Fitness for Duty Program)
- RS-12-214, CFR 50 Appendix E Evacuation Time Estimate Analysis for Dresden Nuclear Power Station + (CFR 50 Appendix E Evacuation Time Estimate Analysis for Dresden Nuclear Power Station)
- RS-12-219, CFR 50 Appendix E Evacuation Time Estimate Analysis + (CFR 50 Appendix E Evacuation Time Estimate Analysis)
- ML12355A141 + (CFR 50 Appendix E Evacuation Time Estimate Analysis)
- ML12363A172 + (CFR 50 Appendix E Evacuation Time Estimate Study)
- NRC 2012-0106, CFR 50 Appendix E Evacuation Time Estimate Study + (CFR 50 Appendix E Evacuation Time Estimate Study)
- L-2022-144, CFR 50 Appendix E Evacuation Time Estimate Study + (CFR 50 Appendix E Evacuation Time Estimate Study)
- ML14008A108 + (CFR 50 Appendix H Status Update)
- ML032180603 + (CFR 50 Appendix R Alternate Appendix R Flowpath)
- ML033070143 + (CFR 50 Appendix a Exemption Request for Steam Trap Isolation Valves)
- ML14128A170 + (CFR 50, Appendix E - Evacuation Time Estimate Analysis Information)
- ML22258A300 + (CFR 50, Appendix E, Evacuation Time Estimate)
- ML22258A090 + (CFR 50, Appendix E, Evacuation Time Estimates)
- 3F0603-08, CFR 50, Appendix R Deviation Request Withdrawal + (CFR 50, Appendix R Deviation Request Withdrawal)
- SBK-L-08204, CFR 50-55a Request for Alternative Requirements for ASME Class 1 Upper Level Instrumentation Lines on the Pressurizer + (CFR 50-55a Request for Alternative Requirements for ASME Class 1 Upper Level Instrumentation Lines on the Pressurizer)
- ML022840451 + (CFR 50.12 Exemption Request for Post Accident Containment Ventilation System)
- RBG-46174, CFR 50.46 (a)(3)(ii) Report + (CFR 50.46 (a)(3)(ii) Report)
- ML041610383 + (CFR 50.46 - 30 Day and Annual Report)
- WBL-21-050, CFR 50.46 - 30-Day Event Report + (CFR 50.46 - 30-Day Event Report)
- RA-14-0032, CFR 50.46 - 30-Day Report for Estimated Impacts to Peak Cladding Temperature Due to Fuel Pellet Thermal Conductivity Degradation + (CFR 50.46 - 30-Day Report for Estimated Impacts to Peak Cladding Temperature Due to Fuel Pellet Thermal Conductivity Degradation)
- ML12296A254 + (CFR 50.46 - 30-Day Special Report)
- ML12136A122 + (CFR 50.46 - 30-Day Special Report of Significant Changes)
- PLA-6247, CFR 50.46 - Annual Report + (CFR 50.46 - Annual Report)
- WBL-24-011, CFR 50.46 - Annual Report + (CFR 50.46 - Annual Report)
- PLA-5687, CFR 50.46 - Annual Report PLA-5687 + (CFR 50.46 - Annual Report PLA-5687)
- PLA-6385, CFR 50.46 - Annual Report of Changes to or Errors in Evaluation Models Used for Calculating Emergency Core Cooling System (ECCS) + (CFR 50.46 - Annual Report of Changes to or Errors in Evaluation Models Used for Calculating Emergency Core Cooling System (ECCS))
- L-2019-058, CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report + (CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report)
- L-2019-179, CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report + (CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report)