DCL-12-115, CFR 26.719(c) Notification
| ML123200436 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 11/15/2012 |
| From: | Allen B Pacific Gas & Electric Co |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| References | |
| DCL-12-115 | |
| Download: ML123200436 (4) | |
Text
Pacific Gas and Electric Company November 15, 2012 PG&E Letter DCL-12-115 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 10 CFR 26.719(c) Notification
Dear Commissioners and Staff:
Barry S. Allen Site Vice President Diablo Canyon Power Plant Mail Code 104/6 P. O. Box 56 Avila Beach, CA 93424 805.545.4888 Internal: 691.4888 Fax: 805.545.6445 10 CFR 26.719 Pursuant to 10 CFR 26.719, "Reporting requirements," paragraph (c), "Drug and alcohol testing errors," Pacific Gas & Electric Company (PG&E) is submitting the following report of an investigation into unsatisfactory performance discovered in performance testing associated with the Diablo Canyon Power Plant (DCPP) Fitness For Duty (FFD) Program.
On October 15, 2012, an unsatisfactory performance discovered in testing of a blind performance sample processed at a Health and Human Services-certified laboratory, Laboratory Corporation of America (LC) testing facility, was reported to the DCPP FFD Program Supervisor. A urine specimen spiked with Tetrahydrocannabinol (THC) prepared by a contracted blind performance specimen provider was reported by LC as "negative" when it should have been reported as "positive for THC." LC was notified bf the performance specimen result and its potential performance error. LC has reviewed its records, and the enclosure dated October 18, 2012, documents the outcome of LCIs investigation and corrective action.
PG&E makes no regulatory commitments (as defined by NEI 99-04) in this letter.
If you have any questions regarding the information enclosed or other FFD Program activities, please contact William F. Ryan, Access/FFD Supervisor, at (805) 545-3329.
Sincerely, 0~5".~
Barry S. Allen A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak
- Diablo Canyon
- Palo Verde
- San Onofre
- South Texas Project
- Wolf Creek
Document Control Desk November 15, 2012 Page 2 Enclosure Dngd/4955/50518687 Cc/enc:
Elmo E. Collins, NRC Region IV PG&E Letter DCL-12-115 Laura H. Micewski, NRC, Acting Senior Resident Inspector Joseph M. Sebrosky, NRC Senior Project Manager, Office of NRR A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak
- Diablo Canyon
- Palo Verde
- San Onofre
- South Texas Project
- Wolf Creek
PG&E Letter DCL-12-115 Enclosure Laboratory Corporation of America Report 1
,_.. _._...... ---_**_* __ *_*_-------*0'---*---.. _._
___ ~ Laboratory Corporation of America Mr. William Ryan Pacific Gas' and Electric Company Diablo Canyon Power Plant PO Box 56 Avila Beach, C?Jlifornia 93424
Dear Mr. Ryan,
Occupational Testing Services 19041W. Alexander Drive PO Box 12652 Research Triangle Park, North Carolina 27709 Telephone: 800-341-'1150 919-572-6900 October 18, 2012 I received correspondence indicating that the result reported to you on a Blind Quality Control specimen was not consistent with the result you expected on the Blind QC sample per your manufacturer's Certificate of Analysis. Laboratory Corporation of America Holdings in Research Triangle Park, North Carolina reported Specimen,10 Number 0385332356 (Donor ID:CTAW) as negative, yet the expected result was positive for THCA.
This specimen did yield a presumptive positive result on the initial test for THC. It was extracted and analyzed by GC/MS in THe Batch 110231; 0385332356 was the only specimen in the batch and THeA was negative. As part of this investigation, the THeA confirmation was repeated on this specimen; 0385332356 was positive for THeA at 101 ng/mL. A corrected report was issued on October 18, 2012 documenting the change from negative to positive at 101 ng/mL.
Since 0385332356 was the only sample in the original THC batch, an aliquotting issue is a possibility as the source of the initial negative result. Appropriate corrective action 'is being taken by the laboratory.
If I can be of further assistance to you, please do not hesitate to call me at 1-800-341-1150 X3254.
Sincerely,
/J'I; tI-------,
p~iis K. Chandler Responsible Person