Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000352/LER-2009-003, Both Isolation Actuation Instrumentation Channels Inoperable + (Both Isolation Actuation Instrumentation Channels Inoperable)
- ENS 46563 + (Both Loops of Low Pressure Coolant Injection Inoperable)
- ENS 43750 + (Both Low Temperature Overpressure Protection Systems Out of Service)
- ENS 46797 + (Both Offsite Power Sources Declared Inoperable Due to Effects of Inclement Weather)
- ENS 48283 + (Both Offsite Power Sources Inoperable)
- ENS 49239 + (Both Offsite Power Sources Inoperable During Undervoltage Testing)
- ENS 41618 + (Both Penetration Room Ventilation System Trains Temporarily Inoperable)
- ENS 52056 + (Both Primary Containment Isolation Valves for a Penetration Potentially Inoperable)
- ENS 54012 + (Both Reactor Feed Pumps Trip Causing Manual Reactor Scram and Eccs Injection)
- 05000263/FIN-2014008-02 + (Both Redundant Safe Shutdown Trains of Nitrogen Bottles were Found Located In the Same Fire Area)
- ENS 41780 + (Both Rhr Lpci Divisions Inoperable Due to Valve Failure)
- ENS 42533 + (Both Safety Injection Trains Declared Inoperable)
- 05000263/FIN-2014002-07 + (Both Secondary Containment Access Doors Briefly Opened Simultaneously)
- ENS 49356 + (Both Secondary Containment Access Doors Briefly Opened Simultaneously)
- 05000263/LER-2013-000-08, Both Secondary Containment Access Doors Briefly Opened Simultaneously + (Both Secondary Containment Access Doors Briefly Opened Simultaneously)
- ENS 54690 + (Both Secondary Containment Access Doors Open Simultaneously)
- ENS 49379 + (Both Secondary Containment Access Doors Opened Simultaneously)
- ENS 50553 + (Both Secondary Containment Airlock Doors Open Simultaneously)
- ENS 50989 + (Both Secondary Containment Airlock Doors Open Simultaneously)
- ENS 52496 + (Both Secondary Containment Airlock Doors Open Simultaneously)
- ENS 50670 + (Both Secondary Containment Airlock Doors Opened Simultaneously)
- ENS 50674 + (Both Secondary Containment Airlock Doors Opened Simultaneously)
- ENS 51985 + (Both Secondary Containment Doors Open Simultaneously)
- ENS 50914 + (Both Secondary Containment Doors Opened Simultaneously)
- ENS 54378 + (Both Source Range Instruments Found Inoperable)
- 05000400/LER-2019-003, Both Source Range Nuclear Instruments Inoperable + (Both Source Range Nuclear Instruments Inoperable)
- 05000323/LER-2013-002, Both Source Range Nuclear Instruments Inoperable While in Mode 6 + (Both Source Range Nuclear Instruments Inoperable While in Mode 6)
- ENS 43161 + (Both Standby Filter Units Inoperable)
- ENS 41785 + (Both Standby Gas Treatment Trains Briefly Inoperable During Testing)
- 05000296/LER-2022-002, Both Standby Liquid Control Subsystems Inoperable Due to an Insufficient Boron Injection Rate + (Both Standby Liquid Control Subsystems Inoperable Due to an Insufficient Boron Injection Rate)
- ENS 52791 + (Both Standby Steam Generator Feed Pumps Out of Service for Pre-Planned Maintenance)
- ENS 50345 + (Both Trains of Control Room Emergency Filtration System Inoperable)
- ENS 45110 + (Both Trains of Auxiliary Building Gas Treatment System Rendered Inoperable)
- ENS 48870 + (Both Trains of Auxiliary Building Special Ventilation System Declared Inoperable)
- ENS 49495 + (Both Trains of Auxiliary Building Special Ventilation System Declared Inoperable)
- ENS 46531 + (Both Trains of Auxiliary Building Ventilation Became Inoperable)
- ENS 46595 + (Both Trains of Auxiliary Feed Water Disabled)
- ENS 40389 + (Both Trains of Auxiliary Feewater Were Declared Inoperable for One Hour and 22 Minutes.)
- ENS 57919 + (Both Trains of Centrifugal Charging System Inoperable)
- 05000413/LER-2009-001, Both Trains of Chemical Volume Control, Auxiliary Feedwater and Containment Spray Systems Were Inoperable Due to a Component Failure + (Both Trains of Chemical Volume Control, Auxiliary Feedwater and Containment Spray Systems Were Inoperable Due to a Component Failure)
- ENS 40391 + (Both Trains of Component Cooling System Inoperable.)
- ENS 46909 + (Both Trains of Component Cooling Water Declared Inoperable Due to Voiding)
- ENS 54286 + (Both Trains of Component Cooling Water Determined Inoperable)
- ENS 53160 + (Both Trains of Containment Air Return Fans Inoperable)
- ENS 51613 + (Both Trains of Containment Atmosphere Dilution System Inoperable)
- ENS 54417 + (Both Trains of Containment Spray Removed from Service)
- ENS 46334 + (Both Trains of Control Room Air Conditioning Inoperable)
- ENS 57831 + (Both Trains of Control Room Air Conditioning Inoperable)
- 05000413/LER-2002-001, Both Trains of Control Room Area Chilled Water System Were Inoperable Simultaneously as a Result of Inadequate Troubleshooting Follow-up + (Both Trains of Control Room Area Chilled Water System Were Inoperable Simultaneously as a Result of Inadequate Troubleshooting Follow-up)
- ENS 55905 + (Both Trains of Control Room Area Filtration System and Area Ventilation Air Conditioning System Inoperable)
- ENS 55908 + (Both Trains of Control Room Area Ventilation Air Conditioning System Inoperable)