ENS 41785
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
08:08 Jun 20, 2005 | |
Title | Both Standby Gas Treatment Trains Briefly Inoperable During Testing |
Event Description | During the performance of the monthly 10-hour run testing of the 'B' Standby Gas Treatment (SBGT) train it was discovered that the flow-indicating controller was not controlling flow at the required setpoint. The 'B' SBGT train was declared inoperable at 0308 on 20 June 2005. As part of the testing, the 'A' SBGT train Mode Select switch was in Manual with the inlet damper closed rendering the 'A' SBGT train inoperable. During the short period of time (approximately 4 minutes) between the discovery of the 'B' SBGT controller failure and the return of the 'A' SBGT train to an operable condition, both SBGT trains were inoperable which is a condition that could prevent the fulfillment of the safety function of the SBGT system to control the release of radioactive material. This is an 8-hour reportable event per 50.72(b)(3)(v)(C).
The 'A' SBGT train was restored to operable status at 0312 when its inlet damper was reopened and its Mode Select switch was returned to AUTO per the surveillance test. The licensee will inform the NRC Resident Inspector. |
Where | |
---|---|
Duane Arnold Iowa (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material | |
LER: | 05000331/LER-2005-002 |
Time - Person (Reporting Time:+-2.45 h-0.102 days <br />-0.0146 weeks <br />-0.00336 months <br />) | |
Opened: | Edward E. Harrison 05:41 Jun 20, 2005 |
NRC Officer: | Steve Sandin |
Last Updated: | Jun 20, 2005 |
41785 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 41785\u003C/a\u003E - \u003Ca href=\"/Duane_Arnold\" title=\"Duane Arnold\"\u003EDuane Arnold\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EBoth Standby Gas Treatment Trains Briefly Inoperable During Testing\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 41785 - Duane Arnold\n","link":"","lat":42.10089166666667,"lon":-91.77759444444445,"icon":"/w/images/9/9b/NextEra_Energy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (96 %) |
After | Power Operation (96 %) |
Duane Arnold with 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material | |
WEEKMONTHYEARENS 534962018-07-09T05:00:0009 July 2018 05:00:00
[Table view]10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Secondary Containment Inoperable ENS 525112017-01-26T09:00:00026 January 2017 09:00:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Containment Valves Failed Surveillance Testing ENS 520532016-06-29T14:40:00029 June 2016 14:40:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Secondary Containment Inoperable ENS 520222016-06-19T20:33:00019 June 2016 20:33:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Secondary Containment Inoperable ENS 513532015-08-27T12:52:00027 August 2015 12:52:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Secondary Containment Inoperable ENS 509892015-04-16T18:20:00016 April 2015 18:20:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Both Secondary Containment Airlock Doors Open Simultaneously ENS 509142015-03-21T05:30:00021 March 2015 05:30:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Both Secondary Containment Doors Opened Simultaneously ENS 505602014-10-23T06:07:00023 October 2014 06:07:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Secondary Containment Inoperable Due to Both Airlock Doors Open Simultaneously ENS 503752014-08-15T17:18:00015 August 2014 17:18:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Standby Gas Treatment System Inoperable ENS 501532014-05-30T12:59:00030 May 2014 12:59:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Secondary Containment Airlock Inoperable for 10 Seconds ENS 498382014-02-18T15:44:00018 February 2014 15:44:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Momentary Loss of Secondary Containment ENS 496572013-12-18T14:30:00018 December 2013 14:30:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Both Doors in Secondary Containment Airlock Opened Concurrently ENS 482122012-08-20T20:20:00020 August 2012 20:20:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Rwcu System Isolation Differential Flow - High Function Inoperable ENS 477092012-02-29T18:22:00029 February 2012 18:22:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Secondary Containment Isolation Dampers Fail to Close During Quarterly Surveillance ENS 417852005-06-20T08:08:00020 June 2005 08:08:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Both Standby Gas Treatment Trains Briefly Inoperable During Testing 2018-07-09T05:00:00 | |