Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18255A014 + (BWROG Presentation Slides for Public Meeting Sept 12 2018)
- ML12030A090 + (BWROG Proposal for Timing of Licensee Completion of Proposed Commission Order on Near Term Task Force (NTTF) Recommendation 5.1)
- ML14008A294 + (BWROG Proprietary Determination Letter Survey on Hl & Nfe)
- ML13206A080 + (BWROG Proprietary Determination Letter for Supplemental Responses to LTR-1 RAIs)
- ML12213A559 + (BWROG Proprietary Determination Letter for Batch 1 RAI Responses)
- ML14232A307 + (BWROG Public Meeting Notice with the Boiling Water Reactor Owners Group)
- ML063050169 + (BWROG Reactor Coolant System Leakage Monitoring Best Practice Guideline)
- ML070080192 + (BWROG Rejection MD2836)
- ML030170060 + (BWROG Report, NEDC-32988-A, Rev 2, Technical Justification to Support Risk Informed Modification to Selected Required Action End States for BWR Plants, Section I (NRCs SE) and Section II (Responses to NRCs RAI))
- ML030170084 + (BWROG Report, NEDC-32988-A, Rev 2, Technical Justification to Support Risk Informed Modification to Selected Required Action End States for BWR Plants, Section III (Topical Report NEDC-32988))
- ML14051A100 + (BWROG Request for Closure of ECCS Suction Strainer Issues: Latent Debris Issue 6; Zone of Influence (Zoi) Adjustment for Air Jet Testing (Ajt) Issue 7; and Spherical Zone of Influence (Zoi) Issue 12)
- ML15062A365 + (BWROG Request for Closure of Issues 6, 7 and 12 - Staff Feedback Letter)
- ML093290180 + (BWROG Request for List of Planned Topical Report Submittals for FY2010, FY2011, and FY2012)
- ML102570064 + (BWROG Response Draft Safety Evaluation (SE) for Boiling Water Reactors Owner Group Topical Report (TR) NEDO-3349, Revision 1, Boiling Water Reactor Application to Regulatory Guide 1.97, Revision 4,)
- ML032130164 + (BWROG Responses to NRC Request for Additional Information on Nedc 33046, Technical Justification to Support Risk-Informed Primary Containment Isolation Valve AOT Extensions for BWR Plants)
- ML083080053 + (BWROG Review of NRC Draft Safety Evaluation for NEDE-33213P)
- ML12202A043 + (BWROG Revised Venting Strategy)
- ML15210A153 + (BWROG Risk-Informed Public Meeting Summary)
- ML033290346 + (BWROG Summary of Meeting Concerning Steam Dryer Integrity (Tac. MC0931))
- ML13051A636 + (BWROG Supplemental RAIs for NEDC-33608P, Redacted Version)
- ML19045A449 + (BWROG Target Rock SRV Presentation)
- ML14252A254 + (BWROG Technical Product BWROG-TP-08-035, Drywell & Wetwell Walkdown Guidance Document)
- ML15360A002 + (BWROG Teleconference NEDC-33347P Public Meeting)
- ML17192A208 + (BWROG Topical Reports NEDC-33347P-A Revision 2 (Proprietary Version) and NEDO-33347 Revision 2 (Non-Proprietary Version), Containment Overpressure Credit for Net Positive Suction Head (NPSH))
- ML020560188 + (BWROG, CEOG, & WOG, Ltr, Contingency Plan for Obtaining Radioactive Samples Following the Elimination of Regulatory Requirements on Post-Accident Sampling)
- ML060170049 + (BWROG, Cover Letter)
- ML010310355 + (BWROG, Letter, Topical Report NEDC-32975 (P), Regulatory Relaxation for BWR Lose Parts Monitoring Systems (Tac No. MA9643))
- ML003776989 + (BWROG, Memoranda, Loose Parts Monitoring (Tac No MA9643))
- ML053140268 + (BWROG, Office of NRR Reorganization)
- ML003706378 + (BWROG, RAI, BWR Owners Group Appendix R Fire Protection Committee Generic Guidance for BWR Post-Fire Safe Shutdown Analysis)
- ML053330380 + (BWROG, RAI, Topical Report (TR) NEDO-33148, Separation of Loss of Offsite Power from Large Break LOCA (Loss-of-Coolant Accident))
- ML14065A063 + (BWROG, Request for Closure of ECCS Suction Strainer Issues: Latent Debris Issue 6; Zone of Influence (Zoi) Adjustment for Air Jet Testing (Ajt) Issue 7; and Spherical Zone of Influence (Zoi) Issue 12)
- ML13091A005 + (BWROG, Response to Draft Safety Evaluation for the Boiling Water Reactor Owners Group Licensing Topical Report BWROG-TP-11-022, Pressure-Temperature Limits Report Methodology for Boiling Water Reactors, Revision 1, November 2011)
- ML090830065 + (BWROG, Response to NRC Requests for Additional Information on GEH BWROG Topical Reports NEDC-33347P Revision 0 (Proprietary Version) & NEDO-33347 Revision 0 (Non-Proprietary Version), Containment Overpressure Credit for Net Positive Suction)
- ML14027A139 + (BWROG, Submittal of Report, BWR Material Dissolution Test Plan, BWROG-ECCS-WP-4-1 R4, for NRC Information and Commentary)
- ML003770246 + (BWROG, Thank-you Letter for the Bworg -Fire Protection Circuit Analysis Criteria (Tac No. MA8544))
- ML032940450 + (BWROG- Licensing Topical Report NEDO-33003, Regulatory Relaxation for the H2/O2 Monitors and Combustible Gas Control Systems (Tac. MB2228))
- ML062130329 + (BWROG-06020 GE Licensing Topical Report NEDO-33178, Rev. 0, General Electric Methodology for Development of Reactor Pressure Vessel Pressure-Temperature Curves)
- ML070920166 + (BWROG-07018, Enclosure 2, GE Draft Presentation Regarding Decay Ratio Adder Removal for BWROG Stability Solution Options I-D and II)
- ML12144A126 + (BWROG-12016, Enclosure 1 - Status of Responses to RAIs Associated with Boiling Water Reactor Owners’ Group (BWROG) Licensing Topical Report NEDC-33608P Boiling Water Reactor Emergency Core Cooling Suction Strainer In-Vessel Downstream Effec)
- ML12144A124 + (BWROG-12016, Enclosure 3 - Batch 2 Responses to RAIs Associated with LTR NEDC- 33608P, Boiling Water Reactor Emergency Core Cooling Suction Strainer In-Vessel Downstream Effects (Non-Proprietary))
- ML12144A127 + (BWROG-12016, Enclosure 4 - Affidavit)
- ML14077A094 + (BWROG-14014 - Affidavit Requesting Witholding of Attachments 2, 3, 4, 5, 6 and 7, Attachment 1)
- ML13205A011 + (BWROG-ECCS-TA08-001, Rev. 1, Damage Pressure and Zone of Influence for BWR Coatings)
- ML021830438 + (BWROG-Meeting on 7/25/02 from 8:30 A.M. to 12:00 P.M. in Room O-6B4. Discussion on Key Issues with NRC Management)
- ML011430372 + (BWROG-Meeting with BWR Owners Group & NRC Issues with NRC Management That Are Key to BWROG)
- ML020770072 + (BWROG-Summary of Meeting Held on 1/20/02 Exchange Information and Discuss Topics Related to Nrc/Bwrog Activities)
- ML14252A255 + (BWROG-TP-09-001, Containment Walkdown Procedure for Potential Strainer Debris Sources at BWR Nuclear Power Plants)
- ML11208B981 + (BWROG-TP-09-033, Rev. 1, Generic Methodology for JOG MOV Periodic Verification Program - Category D MOV Evaluations)
- ML11326A243 + (BWROG-TP-11-022, Rev. 1, Pressure-Temperature Limits Report Methodology for Boiling Water Reactors)
- ML11325A074 + (BWROG-TP-11-032, Report No. 0900876.401, Linear Elastic Fracture Mechanics Evaluation of General Electric Boiling Water Reactor Water Level Instrument Nozzles for Pressure-Temperature Curve Evaluations)