Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199B084 + (Audit Rept on Implementation of GL 98-01, Year 2000 Readiness of Computer Sys at Npps)
- ML18036A324 + (Audit Rept on TVA Conformance W/Title 10 of Code of Federal Regulations Part 50.4,50.59,50.71(e) in Amend 7 of Browns Ferry Updated Fsar)
- ML18018B632 + (Audit Rept, Human Factors Engineering Detailed Control Room Design Review In-Progress Audit)
- ML20198K748 + (Audit Rept, NRC Should Reconsider Methodology & Implementation of Management Control Program)
- ML20210C196 + (Audit Rept, Review of Expenses Associated with Furnishing Redecorating,Purchasing Furniture or Making Improvements to Commission Ofcs)
- ML20154S464 + (Audit Rept, Review of NRC Controls Over Pc Refresh Program)
- ML20154S485 + (Audit Rept, Review of NRC Representation Funds)
- ML20034H346 + (Audit Rept, Surveys of NRC Compliance W/Natl Energy Conservation Policy Act)
- ML20236R379 + (Audit Rept,Commitment Mgt Centerior Svc Co for Perry Nuclear Plant,Unit 1)
- ML20236S092 + (Audit Rept,Commitment Mgt for Tva,Sequoyah Nuclear Plants, Units 1 & 2)
- ML20236F720 + (Audit Rept,Commitment Mgt,Entergy Operations Inc,River Bend,Unit 1)
- ML20236F850 + (Audit Rept,Commitment Mgt,Union Electric Co,Callaway Plant, Unit 1)
- ML20107K574 + (Audit Rept,Human Factors Engineering Detailed Control Room Design Review In-Progress Audit)
- ML17212A839 + (Audit Rept:Human Factors Engineering Control Room Design Review/Audit)
- ML20069K620 + (Audit Rept:Human Factors Engineering Control Room in Progress Audit)
- ML16340E193 + (Audit Rept:Pullman Power Products Work Scope at Diablo Canyon Site 770822-0920)
- ML23269A062 + (Audit Status - the Staff Review of the NuScale Power, LLC Standard Design Approval Application – NuScale US460)
- ML23151A119 + (Audit Status - the Staff Review of the NuScale Power, LLC Standard Design Approval Application - NuScale US460)
- ML23151A075 + (Audit Status - the Staff Review of the NuScale Power, LLC Standard Design Approval (SDA) Application - NuScale US460)
- ML24269A008 + (Audit Status - the Staff Review of the NuScale Power, LLC Standard Design Approval (SDA) Application - NuScale US460)
- ML24138A200 + (Audit Status May 2024 - the Staff Review of the Nuscale Power, LLC Standard Design Approval Application - NuScale US460)
- ML24354A003 + (Audit Summary - RCI and RAI Enclosure v2 Track Changes 12.10.24)
- ML24366A031 + (Audit Summary - RCI and RAI Enclosure v2.23)
- ML24366A028 + (Audit Summary - RCI and RAI Enclosure v2.23clean)
- ML18113A105 + (Audit Summary - Vogtle Electric Generating Plant, Units 3 and 4 (LAR 18-002))
- ML20176A158 + (Audit Summary 2019 Memo NuScale Chapter 15)
- ML17264B153 + (Audit Summary Memo NuScale CHF TR)
- ML18025A857 + (Audit Summary Memo NuScale Chapter 4, 5 and 9)
- ML20160A247 + (Audit Summary Memo NuScale ECCS Boron Redistribution Issue)
- ML20010D131 + (Audit Summary Memo NuScale LOCA TR)
- ML18051A730 + (Audit Summary Memo NuScale Steam Generators)
- ML20084L502 + (Audit Summary Memorandum for LAR-19-019)
- ML18051A832 + (Audit Summary NuScale Chapter 5, Section 5.4.1)
- ML080720508 + (Audit Summary Regarding HNP, Unit 1, LRA)
- ML23317A001 + (Audit Summary Regarding LAR to Clarify Support System Requirements for the Residual Heat Removal and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6)
- ML091940215 + (Audit Summary Regarding the License Renewal Application for Beaver Valley Power Station, Units 1 and 2)
- ML080800243 + (Audit Summary Regarding the License Renewal Application for the Shearon Harris Nuclear Power Plant, Unit 1)
- ML073340491 + (Audit Summary Regarding the License Renewal for the Wolf Creek Generation Station)
- ML080360549 + (Audit Summary Regarding the License Renewal Application for the Wolf Creek Generating Station - AMP AMR)
- ML092881119 + (Audit Summary Regarding the Oyster Creek Nuclear Generating Station Containment Drywell Liner 3-D Finite Element Analysis)
- ML090860380 + (Audit Summary Regarding the Vermont Yankee Nuclear Power Station License Renewal Application)
- ML080790336 + (Audit Summary Regarding the Wolf Creek Generating Station, Unit 1, LRA)
- ML19329C587 + (Audit Summary Report)
- ML25027A458 + (Audit Summary Report for Application to Adopt TSTF-439, TSTF-505, and TSTF-591)
- ML25098A179 + (Audit Summary Report for LARs to Adopt TSTF-505, TSTF-591 and 10 CFR 50.69)
- ML071580049 + (Audit Summary Report for Plant Aging Management Reviews and Programs for the James A. FitzPatrick Nuclear Power Plant on License Renewal Application)
- ML25008A037 + (Audit Summary Report for the Exemption Requests Regarding Physical Barriers)
- ML24337A122 + (Audit Summary Report for the LAR to Revise Emergency Diesel Generator Frequency & Voltage Ranges for TS 3.8.1, AC (Alternating Current) Sources - Operating, Surveillance Requirements EPID L-2024-LLA-0031)
- ML25269A087 + (Audit Summary Report for the License Amendment Request to Increase Flexibility in Mode Restraints and the License Amendment Request for Shutdown Actions Mode Change Restrictions)
- ML19175A067 + (Audit Summary Report for the Regulatory Audit of NuScale Power, LLC Proposed Inspections, Tests, Analyses, and Acceptance Criteria and Revised Design Implementation Implementation Plan)
- ML18208A370 + (Audit Summary Report for the Regulatory Audit of Nuscale Power, LLC Design Certification Application Human Factors Engineering)