Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Attachment 4 to Enclosure 1 - Holtec Affidavit for Withholding". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML22287A143  + (Attachment 4 - Safety Analysis Report on the HI-STAR Atb 1T Non-Fuel Waste Transport System)
  • ML20307A330  + (Attachment 4 - Standardized Radiological Emergency Plan Revision EP-AA-1004, Revision 39, Radiological Emergency Plan Annex for Dresden Station)
  • ML14170A043  + (Attachment 4 - TRM Bases Developmental Revision D Changes (Mark-Up) for WBN Unit 2)
  • ML12018A215  + (Attachment 4 - TVA Calculation EPM-LCP-072489, Cooling and Heating Load Analysis, Main Control Room HVAC, Revision 14 (Letter Item 4, Sser 23 Appendix Hh Item Number 108))
  • ML061240264  + (Attachment 4 - Table L - Less Restrictive Changes for Monticello, Amendment 146 for the Conversion to the Improved Technical Specifications with Beyond-Scope Issues)
  • ML021220067  + (Attachment 4 - Table L - Less Restrictive Changes North Anna, Units 1 and 2, Amendmends 231 and 212)
  • ML042470019  + (Attachment 4 - Table of Where ANSI N18.7 Requirements Are Addressed by NQA-1-1994 Standards And/Or the New QA Topical Report)
  • ML051360011  + (Attachment 4 - Tentative Meeting Topics for June 8-9, 2005, Public Meeting on NEI 04-01)
  • RS-22-091, Attachment 4 - Transware Enterprises Inc. Affidavits  + (Attachment 4 - Transware Enterprises Inc. Affidavits)
  • ML13254A118  + (Attachment 4 - Updated Evacuation Time Estimates for Dresden Nuclear Power Station Plume Exposure Pathway and ETE Review Criteria Checklist)
  • ML14316A207  + (Attachment 4 - Westinghouse, WCAP-15353, Supplement 2-NP, Revision 0, Palisades Reactor Pressure Vessel Fluence Evaluation)
  • ML20101N176  + (Attachment 4 Affidavit (Non-Proprietary))
  • ML091810622  + (Attachment 4 Affidavit of Nathan E. Goodman)
  • ML20247J599  + (Attachment 4 Basis and History)
  • ML15286A367  + (Attachment 4 Case Oct 9 2015 AO Turkey Point Dec 23 2014ML15035A227)
  • ML18213A533  + (Attachment 4 William Nuttle Expert Report)
  • RS-14-039, Attachment 4 and 5 to RS-14-039, HI-2104790, Rev. 1, Nuclear Group Computer Code Benchmark Calculations, and HI-2125245, Rev. 4, Licensing Report for Quad Cities Criticality Analysis for Inserts-Non Proprietary Version  + (Attachment 4 and 5 to RS-14-039, HI-2104790, Rev. 1, Nuclear Group Computer Code Benchmark Calculations, and HI-2125245, Rev. 4, Licensing Report for Quad Cities Criticality Analysis for Inserts-Non Proprietary Version)
  • ML023050002  + (Attachment 4 for 10/30/02, Meeting with NEI SGMP Responses to NRC RIS 2000-22 & NRC Lessons Learned Report on Indian Point 2 & Steam Generator Issues)
  • ML090580620  + (Attachment 4 from Board Ordered the Staff to Update the Milestones Page on the Commissions Web Site Re Prairie Island License Renewal. Hearing File Index - Initial Disclosures)
  • ML14330A250  + (Attachment 4 to 1CAN111401, ANP-3300, Revision 1, Pressure-Temperature Limits at 54 Efpy)
  • ML100710751  + (Attachment 4 to DCL-10-028, History DCPP PRA Model Development and Update)
  • ML12170A838  + (Attachment 4 to DCL-12-050, Scm 36-01, Rev. 0, Process Protection System (PPS) Replacement Software Configuration Management Plan (SCMP) Nuclear Safety Related)
  • DCL-13-016, Attachment 4 to DCL-13-016, WCAP-17696-NP, Revision 0, Westinghouse Setpoint Calculations for the Diablo Canyon Power Plant Digital Replacement Process Protection System.  + (Attachment 4 to DCL-13-016, WCAP-17696-NP, Revision 0, Westinghouse Setpoint Calculations for the Diablo Canyon Power Plant Digital Replacement Process Protection System.)
  • ML13267A133  + (Attachment 4 to DCL-13-016, WCAP-17696-NP, Revision 0, Westinghouse Setpoint Calculations for the Diablo Canyon Power Plant Digital Replacement Process Protection System)
  • ML22118B015  + (Attachment 4 to Email Dated 4/14/22 from Sburns (Nwp) to Ngarcia Santos (NRC) Courtesy Review - Summary Combined Comments from Nwp on Draft Certificate of Compliance No. 9279, Revision 10)