Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20266C386 + (Appendix R System Boundaries Condensate Storage and Supply System)
- ML20266C320 + (Appendix R System Boundaries Drawing Index & Notes)
- ML20266C349 + (Appendix R System Boundaries Emer Equip Cooling Water)
- ML20266C344 + (Appendix R System Boundaries Emer Equip Cooling Water)
- ML20266C377 + (Appendix R System Boundaries High Pressure Coolant Injection System)
- ML20266C393 + (Appendix R System Boundaries MSRV Control Air Supply)
- ML20266C323 + (Appendix R System Boundaries Nuclear Boiler)
- ML20266C340 + (Appendix R System Boundaries RHR Service Water System)
- ML20266C373 + (Appendix R System Boundaries Reactor Core Isolation Cooling System)
- ML20266C352 + (Appendix R System Boundaries Reactor Water Clean Up System)
- ML20266C336 + (Appendix R System Boundaries Residual Heat Removal System)
- ML20266C331 + (Appendix R System Boundaries Residual Heat Removal System)
- ML20266C327 + (Appendix R System Boundaries Residual Heat Removal System)
- ML20265E729 + (Appendix R Thermo Lag Fire Zone RB-FZ-1E & 1F2 Reactor Bldg El 23 Feet 6 Inches 33 Feet 6 Inches & 6 Feet 5 Inches)
- ML20265E734 + (Appendix R Thermo Lag Fire Zone RB-FZ-ID Reactor Bldg El 51 Feet 3 Inches)
- ML20265E744 + (Appendix R Thermo Lag Fire Zone TB-FZ-11D & 11C Turbine Bldg El 3 Feet 6 Inches & 23 Feet 6 Inches)
- ML20266H630 + (Appendix R Tray and Conduit Plan West Elect Pent RM El (+) 14 Ft - 6 Inches)
- 05000528/LER-2013-003, Appendix R Unanalyzed Condition - Direct Current Ammeter Circuits Without Overcurrent Protection + (Appendix R Unanalyzed Condition - Direct Current Ammeter Circuits Without Overcurrent Protection)
- ENS 50540 + (Appendix R Unanalyzed Condition Affecting the Turbine Driven Aux Feedwater Pump)
- 05000327/LER-2009-001, Appendix R Unanalyzed Condition Affecting Safety Related Shutdown Boards + (Appendix R Unanalyzed Condition Affecting Safety Related Shutdown Boards)
- ML033440492 + (Appendix R to Part 50 - Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979)
- ML032940116 + (Appendix R, Regulatory Conference)
- ML20263R485 + (Appendix R,Iiig/Iiil Flow Chart. No Revision Date)
- ML20263R483 + (Appendix R,Iiig/Iiil Task Flow Chart. No Revision Date)
- ML18093A760 + (Appendix R/Breaker Coordination as-Found Review (Pre-Audit 1987))
- ML102920188 + (Appendix Slides)
- ML113470253 + (Appendix Viii Cod Comparison NRC-PDI_Dec 2011)
- ML22138A338 + (Appendix Volume, Part 2 (5th Cir.)(Case No. 21-60743))
- ML22138A369 + (Appendix Volume, Part 4 (5th Cir.)(Case No. 21-60743))
- RA11-021, Appendix a & B, Offsite Dose Calculation Manual, Revision 2, LaSalle, Units 1 and 2 + (Appendix a & B, Offsite Dose Calculation Manual, Revision 2, LaSalle, Units 1 and 2)
- ML032820142 + (Appendix a - Commitment Table (1).wpd - Safety Evaluation Report with Open Items Related to the License Renewal of the R.E. Ginna Nuclear Power Plant)
- ML19352D305 + (Appendix a - Digital Photographs)
- ML15076A020 + (Appendix a - Examination of Mixed Enrichment Core Loading for the NCSU Pulstar Reactor)
- ML061660548 + (Appendix a - Facility License No. R-80 Technical Specifications for the Cornell University Triga Research Reactor)
- ML19095A011 + (Appendix a - Fig 1-1 - Site Location)
- ML19095A012 + (Appendix a - Fig 1-2 - Unc_Accessible Area)
- ML19095A013 + (Appendix a - Fig 1-3 - Unc_Utility Trenches)
- ML19095A014 + (Appendix a - Fig 5-1 - Unc_Acm Abatement)
- ML19095A015 + (Appendix a - Fig 6-1 - Unc_Soil Boring Locations)
- ML19095A016 + (Appendix a - Fig 8-1 - Unc_Gws Scan_1)
- ML19095A025 + (Appendix a - Fig 8-10 - Unc_Ab Wall_Ceiling Scan_3)
- ML19095A017 + (Appendix a - Fig 8-2 - Unc_Gws Scan_2)
- ML19095A018 + (Appendix a - Fig 8-3 - Unc_Gws Scan_3)
- ML19095A019 + (Appendix a - Fig 8-4 - Unc_Elev_Gamma_Static)
- ML19095A020 + (Appendix a - Fig 8-5 - Unc_Ab Floor Scan_1)
- ML19095A021 + (Appendix a - Fig 8-6 - Unc_Ab Floor Scan_2)
- ML19095A022 + (Appendix a - Fig 8-7 - Unc_Ab Floor Scan_3)
- ML19095A023 + (Appendix a - Fig 8-8 - Unc_Ab Wall_Ceiling Scan_1)
- ML19095A024 + (Appendix a - Fig 8-9 - Unc_Ab Wall_Ceiling Scan_2)
- ML19364A235 + (Appendix a - Figures)
- ML17165A310 + (Appendix a - Historical Boring Logs)