Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20073P836 + (ABB Cenp Critical Experiments in Reactor Critical Facility of Rpi)
- ML20149M033 + (ABB Combustion Engineering Nuclear Sys Comments on DSI-5, Llw. Option 5 Discussed)
- ML022410017 + (ABB Inc, Power Shield Transformer Saturation at 12X Instantaneous 10CFR Part 21 Report)
- ML101060223 + (ABB Inc. Ltr. Amended 10 CFR Part 21 Notification of Deviation Re. P/N 1SDA055274R1 Close Coil)
- ML102950191 + (ABB Inc., 10CFR Part 21 Notification of Potential Defect, 27H Relay, 411R0175-DP-1E and 411R0175-1E)
- ML13022A195 + (ABB Model 27H Under-Voltage Relays in Calc G13.18.6.2-ENS*006)
- ML19072A064 + (ABB Motors & Mechanical Inc. - Closure of Interim Report and Potential Part 21)
- ML18302A229 + (ABB Motors & Mechanical Inc. - Interim Notification Per 10 CFR Part 21)
- ML19024A165 + (ABB Motors & Mechanical Inc. - Second Interim Notification Per 10 CFR Part 21)
- ML20129H183 + (ABB Seismic/Loca Evaluation Methodology for Boiling Water Fuel)
- ML20148A821 + (ABB System 80+ Design Control Document - Volume 1)
- ML22112A044 + (ABB System 80+ Design Control Document - Volume 10)
- ML22112A050 + (ABB System 80+ Design Control Document - Volume 11)
- ML22112A052 + (ABB System 80+ Design Control Document - Volume 12)
- ML22112A046 + (ABB System 80+ Design Control Document - Volume 13)
- ML22112A039 + (ABB System 80+ Design Control Document - Volume 14)
- ML22112A078 + (ABB System 80+ Design Control Document - Volume 15)
- ML22112A085 + (ABB System 80+ Design Control Document - Volume 16)
- ML22112A088 + (ABB System 80+ Design Control Document - Volume 17)
- ML22112A086 + (ABB System 80+ Design Control Document - Volume 18)
- ML22112A077 + (ABB System 80+ Design Control Document - Volume 19)
- ML22112A037 + (ABB System 80+ Design Control Document - Volume 2)
- ML22112A079 + (ABB System 80+ Design Control Document - Volume 20)
- ML22112A076 + (ABB System 80+ Design Control Document - Volume 21)
- ML22112A081 + (ABB System 80+ Design Control Document - Volume 22)
- ML22112A075 + (ABB System 80+ Design Control Document - Volume 23)
- ML22112A038 + (ABB System 80+ Design Control Document - Volume 3)
- ML22112A042 + (ABB System 80+ Design Control Document - Volume 4)
- ML22112A051 + (ABB System 80+ Design Control Document - Volume 5)
- ML22112A048 + (ABB System 80+ Design Control Document - Volume 6)
- ML22112A043 + (ABB System 80+ Design Control Document - Volume 7)
- ML22112A049 + (ABB System 80+ Design Control Document - Volume 8)
- ML22112A045 + (ABB System 80+ Design Control Document - Volume 9)
- ML11278A076 + (ABB, Inc. - 10 CFR Part 21 Notification of Potential Defect, Solid State Relays - Update of Previous Notification)
- ML041450498 + (ABB, Inc. Report of Potential Defect Per 10CFR Part 21 Indicating Instantaneous Trip Unit on Type Co and COM Relays)
- ML18289A455 + (ABB, Inc., 10 CFR Part 21 Notification of Deviation, Dry Type Transformer Serial 24-26458)
- ML12123A089 + (ABB, Inc., Notification of Potential Part 21 Report - Hk Circuit Breaker Studs Failed to Meet Specification)
- ML20044C006 + (ABB-C-E Sys 80+ Structural Analysis of Nuclear Island & Nuclear Annex Structures)
- ML20155J325 + (ABB-CE Evaluation of CSP NPSH Accounting for Sump Subcooling)
- ML063190083 + (ABWR Braidwood Fuel Transportation Data)
- ML20071H998 + (ABWR Certified Design Matl)
- ML18354B167 + (ABWR DC Renewal - ECCS Suction Strainer Design Audit Report)
- ML19162A078 + (ABWR DC Renewal Issue 09 SE Section 6.2.1.9 ECCS Strainers Rev 5)
- ML19162A065 + (ABWR DC Renewal Issue 09 SER Section-6.2.1.9 ECCS Strainers)
- ML18096A044 + (ABWR DC Renewal Issue 13 SER Package Section 9.1.1-New Fuel Storage)
- ML18096A118 + (ABWR DC Renewal Issue 13 SER Package Section 9.1.4-Light Load Handling)
- ML18096A057 + (ABWR DC Renewal Issue 13 SER Package Section 9.1.5-Heavy Load Cranes)
- ML19171A290 + (ABWR DC Renewal Issue 18b SER Section-9.1.2.2 Fuel Racks)
- ML19171A293 + (ABWR DC Renewal Issue 18b Section 9.1.2.2 New and SFP Racks Seismic Structural Analysis Rev 4)
- ML19156A177 + (ABWR DC Renewal Issue 19 & 20 SER Section-9.1.2.1 New and Spent Fuel Storage)
- ML19091A120 + (ABWR DC Renewal Issue 22 SE Section 7.7.1.2.1 CR Ganged Withdrawal Sequence)