MONTHYEARML24278A2832024-11-0707 November 2024 Letter to E. Carr Environmental Impact Statement Scoping Summary Report for Virgil C. Summer Nuclear Station Unit 1 ML24305A1302024-10-31031 October 2024 Submittal of 30 Day Report Per 10 CFR 26.719(c) Blind Performance Testing ML24308A0052024-10-28028 October 2024 10-28-24 NRC V.C. Summer Nuclear Station SLR Cherokee Nation Letter to USNRC ML24308A0062024-10-25025 October 2024 Subsequent License Renewal Application Area of Potential Effect (Ape) Clarification Fairfield County, South Carolina SHPO Project No. 22-EJ0147 ML24302A1442024-10-24024 October 2024 Update to Subsequent License Renewal Application (SLRA) Supplement 4 and Requested Information Formation in Response to Limited Aging Management Audit ML24250A0782024-10-22022 October 2024 Relief Request RR-5-V1 Regarding Service Water Return Header Check Valves ML24256A2322024-10-22022 October 2024 Relief Request RR-5-P1 Charging/Safety Injection Pumps ML24255A3152024-10-22022 October 2024 Relief Request RR-5-V2 Regarding Pressure Isolation Valves 05000395/LER-2024-002, Loss of Control Room Emergency Filtration System2024-10-15015 October 2024 Loss of Control Room Emergency Filtration System ML24290A1052024-10-0707 October 2024 Core Operating Limits Report VCSNS Unit 1 Cycle 29, Revision 0 IR 05000395/20244042024-09-26026 September 2024 Cyber Security Inspection Report 05000395-2024404 - Public ML24274A1942024-09-26026 September 2024 (Vcsns), Unit 1 Subsequent License Renewal Application (SLRA) First 10 CFR 54.21(b) Annual Amendment ML24221A2112024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0552024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0642024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0542024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0592024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) IR 05000395/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000395/2024402 IR 05000395/20240052024-08-22022 August 2024 Updated Inspection Plan for Virgil C. Summer Nuclear Station - Report 05000395/2024005 ML24190A4012024-08-19019 August 2024 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application - Dominion Energy Letter Dated May 30, 2024 IR 05000395/20240022024-08-12012 August 2024 Integrated Inspection Report 05000395/2024002 ML24180A0062024-08-0505 August 2024 Issuance of Amendment No. 227 to Modify Technical Specification 3.8.3.1 to Increase Completion Time for 120-Volt A.C. Vital Busses ML24218A3002024-08-0101 August 2024 Environmental Review Response to NRC Requests for Additional Information and Response to NRC Requests for Confirmation of Information Set 1 ML24158A3882024-07-31031 July 2024 Issuance of Amendment No. 226 to Change Emergency Plan Staff Augmentation Times and Relocate Emergency Operations Facility ML24162A3292024-07-0505 July 2024 Letter to E Carr - V.C. Summer Unit 1 - Summary of the May 2024 Audit Regarding the Environmental Review of the Subsequent License Renewal Application ML24185A1902024-06-25025 June 2024 Submittal of Updated Final Safety Analysis Report, Revision 24 ML24177A1382024-06-25025 June 2024 Aging Management Audit Report- VC Summer, Unit 1 - Subsequent License Renewal Application ML24178A1192024-06-25025 June 2024 Update to License Amendment Request- Inverter Allowed Outage Time (AOT) Extension ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24171A0152024-06-17017 June 2024 Update to Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Set 2 Safety Review ML24157A3352024-06-0606 June 2024 – Notification of an NRC Cybersecurity Baseline Inspection (NRC Inspection Report 05000395-2024404 and Request for Information ML24155A2042024-05-31031 May 2024 Proposed Alternative Request RR-24-123, Containment Unbonded Post-Tensioning System Inservice Inspection Requirements ML24155A1462024-05-30030 May 2024 Update to Subsequent License Renewal Application (SLRA) -Response to NRC Request for Additional Information Set 1 Response to NRC Request for Confirmation of Information Set 1 and Supplement 3 ML24143A1792024-05-22022 May 2024 Special Report 2024-001-01 for Virgil C. Summer Nuclear Station (Vcsns), Unit 1, Waste Gas System Inoperability ML24141A2822024-05-20020 May 2024 (Vcsns), Unit 1 - License Amendment Request - Emergency Response Organization (ERO) Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes IR 05000395/20240012024-05-10010 May 2024 Integrated Inspection Report 05000395/2024001 ML24129A2002024-05-0606 May 2024 Update to Subsequent License Renewal Application, Supplement 2 IR 05000395/20240402024-05-0101 May 2024 95001 Supplemental Inspection Report 05000395/2024040 and Follow-Up Assessment Letter ML24121A1002024-04-29029 April 2024 Response to Request for Additional Information Regarding Alternative Request RR-5-V2 ML24120A2072024-04-29029 April 2024 Submittal of Annual Radiological Environmental Operating Report ML24116A2052024-04-23023 April 2024 Annual Radioactive Effluent Release Report ML24109A1792024-04-19019 April 2024 Aging Management Audit Plan Regarding the Subsequent License Renewal Application Review ML24108A0392024-04-18018 April 2024 Letter to E Carr-V.C. Summer Unit 1- Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application ML24108A0672024-04-17017 April 2024 Submittal of Summary for Condition of the Service Water Intake Structure Provided in Accordance with License Condition 2.C.5.d 05000395/LER-2024-001, (Vcsns), Unit 1, Automatic Actuation of B Emergency Diesel Generator2024-04-17017 April 2024 (Vcsns), Unit 1, Automatic Actuation of B Emergency Diesel Generator ML24100A7312024-04-0909 April 2024 Personnel Exposure and Monitoring Annual Report ML24095A2072024-04-0101 April 2024 Update to Subsequent License Renewal Application (SLRA) Supplement 1 ML24088A2062024-03-26026 March 2024 Annual Operating Report ML24087A2182024-03-26026 March 2024 (Vcsns), Unit 1 - License Amendment Request - Emergency Response Organization (ERO) Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes - Response to Request. 2024-09-26
[Table view] |
Text
August 26, 2002 PUMPU Document Control Desk US Nuclear Regulatory Commission Washington, D.C. 20555
SUBJECT:
Power Shield Transformer Saturation at 12X Instantaneous 10CFR Part 21 Report NOTIFICATION BY: ABB Inc.
Substation Automation and Protection Division 7036 Snowdrift Road Allentown, PA 18106 Dennis Haring Quality Assurance In April 2002 ABB SAPD Quality Assurance Department received a notification from Virgil C.
Summer Nuclear Station outlining a failure of a Power Shield trip device during surveillance the testing. Two of the three phases tripped at more than 20% above the nominal set point of Serial Power Shield trip device. The Power Shield trip device that failed was a 225 Amp model, number 32301 and was being used in a non-safety related application.
Subsequent testing and troubleshooting by Virgil C. Summer Nuclear Station indicated that during single phase testing when the Power Shield amp tap was set to its highest Setting (225 amp) and the Instantaneous set point was set to 12X (highest instantaneous setting), the be transformer board CT (Current Transformer) would go into saturation, causing the trip point to Station reported that any lower combination of out of specification. Virgil C. Summer Nuclear amp tap and instantaneous pickup yielded results in tolerance. In other words, the problem only appeared at the highest allowable value for the instantaneous trip.
It should be noted that the Current Transformer (CT) design used on the Power Shield that Virgil C. Summer Nuclear Station tested is no longer used in manufacturing the Power Shield Trip Device. ABB Engineering changed this CT design in March of 1991. The design of the the output transformer was changed to reduce the flux density in order to improve the linearity of change involved increasing the primary and up through the 12X Instantaneous tap setting. This secondary turns by 10%.
ABB SAPD has duplicated and verified the test results reported by Virgil C. Summer Nuclear trip Station on a Power Shield trip device containing the pre-1991 CT design. Power Shield devices with transformers installed after March 1991, do not exhibit the problem.
The current transformer used before March 1991 only saturates at the highest Instantaneous during a setting (12X) during a single-phase to ground fault. The transformer performs properly that see the fault are phase-to-phase or a three-phase fault because the two or three transformers sharing the secondary burden.
ABB Inc.
Fax Telephone 7036 Snowdrift Rd, Suite 2 Allentown, PA 18106 610-395-1055 610-395-7333
"'UPIP This also means that electrical systems that are ungrounded or high-resistance-grounded, where the ground fault current is limited to a very low value, would not be of any concern for this situation. Solidly grounded systems where additional ground fault protective elements are used would likely not be affected by this situation.
Power Shield Trip Devices that were dedicated as 1E Nuclear Safety related devices and manufactured before March 1991 have the transformer that may saturate at the highest setting of the instantaneous tap (12X). Products with a serial number higher than 82019 were manufactured with the improved transformer and are not affected by this notice. Products with a serial number of 82019 and below may have the transformer affected by this notice.
Testing can be performed at the user's discretion to verify that the Current Transformers are not saturating when using the 12X instantaneous setting.
For units affected by this notice, ABB SAPD recommends that you implement one of the following solutions:
- 1) Review the protection and coordination requirements for any circuit that is using the 12X Instantaneous tap setting. Determine if the circuit could be subjected to high magnitude single-phase-to-ground faults. If this is the case, determine if it would be possible to lower the instantaneous tap to the lOx set point. ABB SAPD recommends avoiding the use of the 12X instantaneous setting regardless of the amp tap setting.
- 2) Replace the transformer board with one that has the improved transformer design. Power Shield Trip Devices can be returned to ABB SAPD to have the transformer board replaced at a nominal charge. Customers choosing this option should contact the RMR department at 1 800-634-6005 or 610-395-7333 or fax 610-395-1055. These same numbers should be utilized if you have any questions regarding this issue.
2 Prepared by Dennis Haring o l,ý,* V;L.-
QA Supervisor, Substation Automation & Proteetioli Division, Allentown plant Reviewed by Dennis Batovsky _ / ,,
Quality Manager, Substation Automation & Protection Division'-"
Reviewed by Doug Voac* f General Manager,.Siubstat uýtomaon & Protection Division ABB Inc.
Telephone 7036 Snowdrift Rd, Suite 2 Fax 610-395-7333 Allentown, PA 18106 610-395-1055 2