Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML21067A071 + (3-5-21 Motion to Intervene (DC Cir.)(Case No. 21-1055))
- ML21067A082 + (3-5-21 Order (DC Cir.)(Case No. 21-1048))
- ML21069A343 + (3-5-21 Petition for Review (DC Cir.)(Case No. 21-1084)(Consolidated 21-1037))
- ML20070H901 + (3-6-20 Miami Waterkeeper Entry of Appearance (DC Cir.) (Case No. 20-1026).pdf)
- ML20070H817 + (3-6-20 NRDC Entry of Appearance (DC Cir.)(Case No. 20-1026))
- ML20070H584 + (3-6-20 Petitioners Certificate as to Parties Rulings and Related Cases (Dc. Cir.)(Case No. 20-1026))
- ML20070H620 + (3-6-20 Petitioners Docketing Statement (DC Cir.)(Case No. 20-1026))
- ML20070H668 + (3-6-20 Petitioners Statement of Issues to Be Raised (DC Cir.)(Case No. 20-1026))
- ML20070H507 + (3-6-20 Statement of Intent to Utilize Deferred Joint Appendix (DC Cir.)(Case No. 20-1026))
- ML20070H548 + (3-6-20 Underlying Decisions from Which Appeal or Petition Arises (DC Cir.)(Case No. 20-1026))
- ML19088A137 + (3-7-19 ROP Public Meeting Summary)
- ML22069A094 + (3-7-22 Clerks Order Granting Motion to Extend Time and Utilize Deferred Appendix (DC Cir.)(Case No. 21-1162))
- ML22069A097 + (3-7-22 Joint Motion for Filing a Deferred Appendix (DC Cir.)(Case No. 21-1162))
- ML22069A103 + (3-7-22 Petitioners Unopposed Motion to Extend Time to File Brief (DC Cir.)(Case No. 21-1162))
- ML21067A414 + (3-8-21 Mandate from 9th Circuit - Public Watchdogs V NRC 9th Cir 20-70899(Filed))
- ML21067A083 + (3-8-21 Unopposed Motion for Enlargement of Time to Comply with Docketing Order (Refiled)(Dc Cir.)(Case No. 21-1048))
- ML23067A011 + (3-8-23 - Email to J. Hawkins, SMR (Holtec) - NRC Staff Response to SMR-160 Question Polar Crane Analysis (Project 99902049))
- ML050690467 + (3-9-05, Notice of Availability of the Final Plant-Specific Supplement 18 to the Generic Environmental Impact Statement (GEIS) Regarding License Renewal for Joseph M. Farley Nuclear Plant, Units 1 and 2 (TAC MC0768 and MC9769)
- ML21069A344 + (3-9-21 Notice (DC Cir.)(Case No. 21-1084))
- ML21069A345 + (3-9-21 Order (DC Cir.)(Case No. 21-1037)(Consolidated 21-1084))
- ML25195A128 + (3-Amir Bahadori-Presentation to NRC Public Meeting on EO 14300 16 July 2025)
- ML24205A018 + (3-Base: Isolation/Observations - Final Stakeholder Meeting, 07-24-24)
- ML23173A089 + (3-CGS-2023-02 Draft Written Exam)
- ML20241A243 + (3-CN-2020-04-Draft Written Exam)
- ML17081A539 + (3-COLUMBIA-2017-02 Draft Written Exam)
- ML20276A154 + (3-CW-2020-08 Draft Written Exam)
- ML091040726 + (3-D Drywell Analysis - Independent Review Findings)
- ML20136A690 + (3-D Response Spectrum Analysis & Verification of Multimode Response Multiplier Equal to 1.25)
- NL-11-065, 3-ECA-0.0, Rev. 5, Loss of All AC Power + (3-ECA-0.0, Rev. 5, Loss of All AC Power)
- NLS2019040, 3-EN-DC-147, Rev. 5C1, Cooper Nuclear Station Pressure and Temperature Limits Report (PTLR) for 54 Effective Full-Power Years (Efpy). (Non-proprietary) + (3-EN-DC-147, Rev. 5C1, Cooper Nuclear Station Pressure and Temperature Limits Report (PTLR) for 54 Effective Full-Power Years (Efpy). (Non-proprietary))
- ML081210102 + (3-PT-CS032A, Rev. 11, Flow Test SW Header Check Valves and Flow Test of Underground Portions of (Service Water) Line 409)
- ML23143A204 + (3-PV-2023-05 Draft Written Exam)
- ML071150214 + (3-Part E-Mail Between R. Pedersen, Dpopm, to M. Shannon, Rii, Subject: Action: Review DPO-2006-003 Report)
- ML18239A238 + (3-RBS 2018-07 Written Exam (Draft))
- ML21265A507 + (3-STP-2021-07 Draft Written Exam)
- ML20007E844 + (3-WC-2019-12 Draft Written Exam)
- ML20266E488 + (3-inch Nuclear Diaphragm Valve H.W.O)
- ML25246A730 + (3. Attachment 3 - Subcritical Systems - Energy Amplifier White Paper)
- ML25002A191 + (3. CoC 1014 Renewed Amendment No. 19 Appendix B)
- ML24164A262 + (3. Design Analysis and Calculation ASME Code Subsections Nb and Wb Stress Analysis for ES-3100 Containment Vessel)
- ML21265A308 + (3. Email Response to Requests for Additional Information)
- ML25181A195 + (3. Enclosure 2 - Amendment 1 to SNM-2013 (Public - Redacted))
- ML090860789 + (3. FEMA Response to NRC Regarding Farley TARs Seven Question, FEMA Memo from Burnside, January 16, 2009)
- ML23250A326 + (3. Final CoC 1031 Amendment 0 Revision 2, TS Appendix a)
- ML24324A365 + (3. Final CoC 1031 Amendment 13 TS Appendix a)
- ML25042A641 + (3. Final CoC 1031 Amendment 14 TS Appendix a)
- ML25211A338 + (3. Final Safety Evaluation Report or CoC No. 1042, Amendment No.4 for the NUHOMS Eos System)
- ML21308A608 + (3. Non-Proprietary Slide Presentation from 10-22-21 pre-application Meeting (Public))
- ML25231A256 + (3. Preliminary Safety Evaluation Report for Certificate of Compliance No. 1042, Amd 5)
- ML23030B794 + (3. Proposed Certificate of Compliance No. 1032, Amendment 7, Appendix a)
- ML24312A181 + (3. Proposed CoC 1014 Amendment No. 19 Appendix B)