Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20266C522 + (18 SW 1 Class Ivp Class Is Seismic Control Bldg)
- ML20266C512 + (18 SW 1 Class Ivp Reactor Bldg)
- ML20266C503 + (18 SW 1 Class Ivp Reactor Bldg B&R Const Dwg)
- ML20266C552 + (18 SW 2 Class Ivp Reactor Bldg)
- ML20266C535 + (18 SW 2 Class Ivp Reactor Bldg)
- ML093200554 + (18 U.S.C. 207 - Exceptions and Waivers: a Quick Reference Guide)
- ML18095A005 + (18-012 M180047 GEH Notice to NRC Regarding Parent Company Guarantee March 2018)
- ML19002A272 + (18-1232 (D.C. Cir.) Decision Granting NRC Motion to Dismiss)
- ML20261E601 + (18-Inch-L151 C1-Z-S6 150 Class Mclok Bfv W/Limitorque SMB-00-15-H3BC Actuator ASME Section III Class-2. Sheet 2 of 2)
- ML20261E606 + (18-Inch-L151 C1-Z-S6 150 Class Mclok Bfv W/Limitorque SMB-00-15-H3BC Actuator ASME Section III Class-2. Sheet 1 of 2)
- ML20261E595 + (18-Inch-L151 C1-Z-S6 150 Class Mclok Bfv W/Limitorque SMB-00-15-H3BC Actuator ASME Section III Class-2. Sheet 1 of 2)
- ML20261E611 + (18-Inch-L151 C1-Z-S6-150 Class Mclok Bfv W/Limitorque SMB-00-15-H3BC Actuator ASME Section III Class-2. Sheet 2 of 2)
- ML19134A186 + (18-MRP-227, Rev. 1 Review and Applicant/Licensee Action Item Closure)
- ML22271A945 + (18. Aliyeva- Anisotropic Concrete Expansion Due to ASR)
- ML25042A656 + (18. Final CoC 1031 Amendment 4 Revision 2 TS Appendix a)
- ML23250A341 + (18. Final CoC 1031 Amendment 5 Revision 1 TS Appendix a)
- ML24211A256 + (18. Proposed CoC 1031 Amendment 4 Revision 2)
- ML22220A170 + (18. Proposed CoC 1031 Amendment 5 Revision 1 TS Appendix a)
- ML22354A281 + (18. Proposed CoC No. 1026, Renewed Amendment No. 4)
- ML23068A402 + (18. Renewed Certificate of Compliance No. 1014, Amendment No. 5, Appendix a)
- 2CAN021003, 180 Day Report of Steam Generator Tubing Inspections + (180 Day Report of Steam Generator Tubing Inspections)
- L-2003-299, 180 Day Response to Generic Letter 2003-01 Re Control Room Habitability + (180 Day Response to Generic Letter 2003-01 Re Control Room Habitability)
- ML033450304 + (180 Day Response to Generic Letter 2003-01 Re Control Room Habitability)
- ML17325B762 + (180 Day Steam Generator Tube Inspection Report for the 21St Refueling Outage for Waterford Steam Electric Station, Unit 3)
- W3F1-2014-0041, 180 Day Steam Generator Tube Inspection Report for the 19TH Refueling Outage + (180 Day Steam Generator Tube Inspection Report for the 19TH Refueling Outage)
- ML15194A068 + (180-Day Relaxation of Certain Schedule Requirements for Order EA-12-049 Issuance of Order to Modify Licenses with Regard to Requirements for Mitigating Strategies for Beyond Design Basis External Events)
- ML20040D780 + (180-Day Rept in Response to IE Bulletin 80-11 for Quad Cities Nuclear Power Station,Units 1 & 2)
- ML20040D776 + (180-Day Rept in Response to IE Bulletin 80-11 for Dresden Nuclear Power Station,Units 2 & 3)
- LR-N03-0471, 180-Day Response to Generic Letter 2003-01, Control Room Habitability + (180-Day Response to Generic Letter 2003-01, Control Room Habitability)
- BSEP 03-0164, 180-Day Response to Generic Letter 2003-01, Control Room Habitability + (180-Day Response to Generic Letter 2003-01, Control Room Habitability)
- L-03-192, 180-Day Response to Generic Letter 2003-01, Control Room Habitability + (180-Day Response to Generic Letter 2003-01, Control Room Habitability)
- ML033430285 + (180-Day Response to Generic Letter 2003-01, Control Room Habitability)
- ML033510613 + (180-Day Response to Generic Letter 2003-01, Control Room Habitability)
- ML033510077 + (180-Day Response to Generic Letter 2003-01, Control Room Habitability)
- ML033510615 + (180-Day Response to Generic Letter 2003-01, Control Room Habitability)
- NRC-03-0090, 180-Day Response to Generic Letter 2003-01, Control Room Habitability. + (180-Day Response to Generic Letter 2003-01, Control Room Habitability.)
- ML033500344 + (180-Day Response to NRC Generic Letter 2003-01: Control Room Habitability)
- NL-03-181, 180-Day Response to NRC Generic Letter 2003-01 Regarding Control Room Habitability + (180-Day Response to NRC Generic Letter 2003-01 Regarding Control Room Habitability)
- ML033350400 + (180-Day Response to NRC Generic Letter 2003-01 Regarding Control Room Habitability)
- LIC-12-0170, 180-Day Response to NRC Request for Information Re Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident + (180-Day Response to NRC Request for Information Re Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident)
- ML12340A442 + (180-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident)
- DCL-03-166, 180-Day Response to Request for Information Pursuant to Generic Letter 2003-01, Control Room Habitability + (180-Day Response to Request for Information Pursuant to Generic Letter 2003-01, Control Room Habitability)
- DCL-10-050, 180-Day Steam Generator Report Fifteenth Refueling Outage + (180-Day Steam Generator Report Fifteenth Refueling Outage)
- DCL-07-106, 180-Day Steam Generator Report, Fourteenth Refueling Outage + (180-Day Steam Generator Report, Fourteenth Refueling Outage)
- W3F1-2008-0074, 180-Day Steam Generator Tube Inspection Report for the 15th Refueling Outage + (180-Day Steam Generator Tube Inspection Report for the 15th Refueling Outage)
- HNP-11-045, 180-Day Steam Generator Tube Inspection Report + (180-Day Steam Generator Tube Inspection Report)
- L-20-264, 180-Day Steam Generator Tube Inspection Report + (180-Day Steam Generator Tube Inspection Report)
- L-22-100, 180-Day Steam Generator Tube Inspection Report + (180-Day Steam Generator Tube Inspection Report)
- L-23-058, 180-Day Steam Generator Tube Inspection Report + (180-Day Steam Generator Tube Inspection Report)
- EPID:L-2022-LRO-0064 + (180-Day Steam Generator Tube Inspection Report)
- W3F1-2010-0031, 180-Day Steam Generator Tube Inspection Report for 16th Refueling Outage + (180-Day Steam Generator Tube Inspection Report for 16th Refueling Outage)
- ML20038B939 + (180-day Rept in Response to IE Bulletin 80-11)
- ML20038B941 + (180-day Rept in Response to IE Bulletin 80-11)
- ML12340A346 + (180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident)
- ML24341A135 + (1851-0001-RPT-002, Revision 0, Degradation Management Program for the Abilene Christian University Molten Salt Reactor (Public))
- ML18193A750 + (19)
- ML24172A265 + (19 - Austenitic Stainless Steel Fracture Toughness, EPRI Presentation Slides, Industry / NRC Materials Programs Technical Information Exchange Public Meeting June 25-27, 2024)