ML12340A346

From kanterella
Jump to navigation Jump to search
180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
ML12340A346
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/27/2012
From: Kaegi G T
Exelon Generation Co
To:
Document Control Desk, Japan Lessons-Learned Division
References
RS-12-165
Download: ML12340A346 (5)


Text

NEExelon Generation.

10 CFR 50.54(f)RS-12-165 November 27, 2012 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461

Subject:

Exelon Generation Company, LLC's 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident

References:

1. NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012 2. NRC Letter, Endorsement of Electric Power Research Institute (EPRI) Draft Report 1025286, "Seismic Walkdown Guidance," dated May 31, 2012 3. Exelon Generation Company, LLC's 120-day response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Reference 1 to all power reactor licensees.

Enclosure 3 of Reference 1 contains specific Requested Actions, Requested Information, and Required Responses associated with Recommendation 2.3 for Seismic. On July 10, 2012, Exelon Generation Company, LLC (EGC) submitted the 120-day response requested in Enclosure 3 of Reference 1, confirming that EGC would use the NRC-endorsed seismic walkdown procedure (Reference 3).

U.S. Nuclear Regulatory Commission 180-Day Response to 50.54(f) Letter NTTF Recommendation 2.3: Seismic November 27, 2012 Page 2 For seismic Recommendation 2.3 (walkdowns), Enclosure 3 of Reference 1 states that within 180 days of the NRC's endorsement of the walkdown process (Reference 2), each addressee will submit a final response, including a list of any areas that are unable to be inspected due to inaccessibility and a schedule for when the walkdown will be completed.

This letter provides the Clinton Power Station 180-day response to Reference 1 for Seismic Recommendation 2.3.Conditions identified during the walkdowns were documented and entered into the corrective action program. Evaluations of the identified conditions are complete.Enclosure 1 to this letter provides the requested information for the Clinton Power Station.This letter contains new regulatory commitments, which are identified in Enclosure 2.Should you have any questions concerning the content of this letter, please contact Ron Gaston at (630) 657-3359.I declare under penalty of perjury that the foregoing is true and correct. Executed on the 27th day of November 2012.Respectfully, Glen T. Kaegi Director, Midwest Licensing and Regulatory Affairs Exelon Generation Company, LLC

Enclosures:

1. Seismic Walkdown Report In Response To The 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Clinton Power Station, Report Number: 12Q0108.60-R-001, Revision 0.2. Summary of Regulatory Commitments U.S. Nuclear Regulatory Commission 180-Day Response to 50.54(f) Letter NTTF Recommendation 2.3: Seismic November 27, 2012 Page 3 cc: Director, Office of Nuclear Reactor Regulation (with Enclosure 1 via CD)Regional Administrator

-NRC Region III (with Enclosure 1 via CD)NRC Senior Resident Inspector

-Clinton Power Station (with Enclosure 1 via CD)NRC Project Manager, NRR -Clinton Power Station (with Enclosure 1 via CD)Illinois Emergency Management Agency -Division of Nuclear Safety (with Enclosure 1 via CD)

U.S. Nuclear Regulatory Commission 180-Day Response to 50.54(f) Letter NTTF Recommendation 2.3: Seismic November 27, 2012 Page 4 Enclosure 1 Seismic Walkdown Report In Response To The 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Clinton Power Station, Unit 1, Report Number: 1200108.60-R-001, Revision 0 (676 pages)

U.S. Nuclear Regulatory Commission 180-Day Response to 50.54(f) Letter NTTF Recommendation 2.3: Seismic November 27, 2012 Page 5 Enclosure 2

SUMMARY

OF REGULATORY COMMITMENTS The following table identifies commitments made in this document. (Any other actions discussed in the submittal represent intended or planned actions. They are described to the NRC for the NRC's information and are not regulatory commitments.)

COMMITTED

[ COMMITMENT TYPE COMMITMENT DATE OR ONE-TIME ACTION PROGRAMMATIC"OUTAGE" (Yes/No) (Yes/No)1. Exelon Generation Company, LLC 12/31/2017 Yes No (EGC) will complete the walkdown of the 14 Clinton Power Station items identified in Table E-1 of Enclosure 1, deferred due to inaccessibility.

2. EGC will complete the supplemental 12/31/2019 Yes No inspections of 11 Clinton Power Station electrical cabinets identified in Table E-2 of Enclosure 1.