Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NLS2008012, 10 CFR 50.55a Request Number RI-35, Revision 0 + (10 CFR 50.55a Request Number RI-35, Revision 0)
- NLS2006020, 10 CFR 50.55a Request Number RI-37, Revision 0 + (10 CFR 50.55a Request Number RI-37, Revision 0)
- ML102300641 + (10 CFR 50.55a Request Number RR-12, Request for Relief from Code Case N-722 Visual Examination of the Reactor Vessel Hot Leg Nozzle to Safe End Dissimilar Metal Welds)
- ML21055A881 + (10 CFR 50.55a Request Number SR-2, Revision 0, Snubber Testing Extension, RAI-EMIB-08 Supplement)
- EPID:L-2021-LLR-0005 + (10 CFR 50.55a Request Number SR-2, Revision 0, Snubber Testing Extension)
- ML21018A004 + (10 CFR 50.55a Request Number SR-2, Revision 0, Snubber Testing Extension)
- L-21-280, 10 CFR 50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirements + (10 CFR 50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirements)
- EPID:L-2022-LLR-0005 + (10 CFR 50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirements)
- L-21-045, 10 CFR 50.55a Request Number VR-4, Revision 0, Exercising Test Frequency, VR-6, Revision 0, Position Verification Testing, and VR-8, Revision 0, Valve Test Frequency Extension + (10 CFR 50.55a Request Number VR-4, Revision 0, Exercising Test Frequency, VR-6, Revision 0, Position Verification Testing, and VR-8, Revision 0, Valve Test Frequency Extension)
- EPID:L-2021-LLR-0010 + (10 CFR 50.55a Request Number VR-4, Revision 0, Exercising Test Frequency, VR-6, Revision 0, Position Verification Testing, and VR-8, Revision 0, Valve Test Frequency Extension)
- L-21-054, 10 CFR 50.55a Request Number VR-7, Revision 0, Check Valve Testing Extension + (10 CFR 50.55a Request Number VR-7, Revision 0, Check Valve Testing Extension)
- EPID:L-2021-LLR-0009 + (10 CFR 50.55a Request Number VR-7, Revision 0, Check Valve Testing Extension)
- L-09-078, 10 CFR 50.55a Request Numbers 1-TYP-4-B3.120-1 and 2-TYP-3-C6.10-1, and Beaver Valley Power Station Inservice Inspection Plans + (10 CFR 50.55a Request Numbers 1-TYP-4-B3.120-1 and 2-TYP-3-C6.10-1, and Beaver Valley Power Station Inservice Inspection Plans)
- L-21-047, 10 CFR 50.55a Request Numbers VR-3 and VR-5, Valve Testing Extension + (10 CFR 50.55a Request Numbers VR-3 and VR-5, Valve Testing Extension)
- EPID:L-2021-LLR-0007 + (10 CFR 50.55a Request Numbers VR-3 and VR-5, Valve Testing Extension)
- L-19-146, 10 CFR 50.55a Request PR-3, Standby Liquid Control Pump Periodic Verification Test + (10 CFR 50.55a Request PR-3, Standby Liquid Control Pump Periodic Verification Test)
- L-MT-18-023, 10 CFR 50.55a Request RR-012: Inservice Inspection Impracticality in Accordance with 10 CFR 50 .55a(g)(5)(iii) During the Fifth Ten-Year Interval + (10 CFR 50.55a Request RR-012: Inservice Inspection Impracticality in Accordance with 10 CFR 50 .55a(g)(5)(iii) During the Fifth Ten-Year Interval)
- L-MT-24-001, 10 CFR 50.55a Request RR-017 - Inservice Inspection (ISI) Impracticality in Accordance with 10 CFR 50.55a(g)(5)(iii) During the Fifth Ten-Year Interval + (10 CFR 50.55a Request RR-017 - Inservice Inspection (ISI) Impracticality in Accordance with 10 CFR 50.55a(g)(5)(iii) During the Fifth Ten-Year Interval)
- EPID:L-2024-LLR-0014 + (10 CFR 50.55a Request RR-017 - Inservice Inspection (ISI) Impracticality in Accordance with 10 CFR 50.55a(g)(5)(iii) During the Fifth Ten-Year Interval)
- NL-08-053, 10 CFR 50.55a Request RR-CRV-75 - Relief from Examinations of Component Welds with Less than Essentially 100% Examination Coverage for Third-Ten Year Inservice Inspection Interval Closeout + (10 CFR 50.55a Request RR-CRV-75 - Relief from Examinations of Component Welds with Less than Essentially 100% Examination Coverage for Third-Ten Year Inservice Inspection Interval Closeout)
- NL-09-008, 10 CFR 50.55a Request RR-CRV-75 - Withdrawal of Part B, Examination Category B-D, Item B3.120, Full Penetration Welded Nozzles in PRZN-1 (Pressurizer Spray) and PRZN-6 (Surge) Nozzles + (10 CFR 50.55a Request RR-CRV-75 - Withdrawal of Part B, Examination Category B-D, Item B3.120, Full Penetration Welded Nozzles in PRZN-1 (Pressurizer Spray) and PRZN-6 (Surge) Nozzles)
- L-13-101, 10 CFR 50.55a Request RR-E 1, Proposed Alternative Regarding Post-Repair Pressure Testing Requirements + (10 CFR 50.55a Request RR-E 1, Proposed Alternative Regarding Post-Repair Pressure Testing Requirements)
- ML032250652 + (10 CFR 50.55a Request RV-3 Regarding American Society of Mechanical Engineers Code for Operation and Maintenance (OM) of Nuclear Power Plants Inservice Testing Requirement at the Davis-Besse Nuclear Power Station, Unit 1)
- ML071870412 + (10 CFR 50.55a Request Regarding 48-Hour Hold Following J-Groove Nozzle Weld Repairs - Third Ten-Year Interval (RR-A31))
- ML071840039 + (10 CFR 50.55a Request Regarding Installation of Structural Weld Overlays Third Ten-Year Interval (RR-A30))
- L-11-346, 10 CFR 50.55a Request Regarding Motor Operated Valve Testing + (10 CFR 50.55a Request Regarding Motor Operated Valve Testing)
- L-11-287, 10 CFR 50.55a Request VR-1, Revision 1, Align Valve Testing Frequencies to NUREG-1482 Provision + (10 CFR 50.55a Request VR-1, Revision 1, Align Valve Testing Frequencies to NUREG-1482 Provision)
- L-11-020, 10 CFR 50.55a Request VRR3 Regarding Solenoid Operated Valve Remote Position Verification Frequency + (10 CFR 50.55a Request VRR3 Regarding Solenoid Operated Valve Remote Position Verification Frequency)
- L-17-308, 10 CFR 50.55a Request for Alternate Reactor Vessel Nozzle Flaw Depth Sizing Criteria (Request 2-TYP-4-RVSE-2) + (10 CFR 50.55a Request for Alternate Reactor Vessel Nozzle Flaw Depth Sizing Criteria (Request 2-TYP-4-RVSE-2))
- EPID:L-2017-LLR-0130 + (10 CFR 50.55a Request for Alternate Reactor Vessel Nozzle Flaw Depth Sizing Criteria (Request 2-TYP-4-RVSE-2))
- L-10-099, 10 CFR 50.55a Request for Alternate Repair Methods for Reactor Pressure Vessel Head Penetration Nozzles + (10 CFR 50.55a Request for Alternate Repair Methods for Reactor Pressure Vessel Head Penetration Nozzles)
- WM 04-0032, 10 CFR 50.55a Request for Alternative Requirements for ASME Class 1 Items Connected to the Upper Portion (Steam Side) of the Pressurizer + (10 CFR 50.55a Request for Alternative Requirements for ASME Class 1 Items Connected to the Upper Portion (Steam Side) of the Pressurizer)
- ML17138B115 + (10 CFR 50.55a Request for Approval of Alternative - RI-ISI-2)
- L-PI-15-011, 10 CFR 50.55a Request for Approval to Use a Portion of a Subsequent Edition and Addenda of ASME Boiler and Pressure Vessel Code, Section XI, for the Inservice Inspection Program Fourth Ten-Year Interval + (10 CFR 50.55a Request for Approval to Use a Portion of a Subsequent Edition and Addenda of ASME Boiler and Pressure Vessel Code, Section XI, for the Inservice Inspection Program Fourth Ten-Year Interval)
- L-2005-141, 10 CFR 50.55a Request for Mechanical Clamping Device Used as Piping Pressure Boundary + (10 CFR 50.55a Request for Mechanical Clamping Device Used as Piping Pressure Boundary)
- ML062360200 + (10 CFR 50.55a Request for Relief from ASME Section XI Repair and Replacement Requirements: Proposed Alternatives for Application of Structural Weld Overlays to Pressurizer Nozzle Welds)
- ML062350116 + (10 CFR 50.55a Request for Relief from ASME Section XI Repair and Replacement Requirements: Proposed Alternatives for Application of Structural Weld Overlays to Pressurizer Nozzle Welds)
- NLS2025023, 10 CFR 50.55a Request for Sixth and Seventh Twelve-Year Inservice Inspection Intervals + (10 CFR 50.55a Request for Sixth and Seventh Twelve-Year Inservice Inspection Intervals)
- NL-04-1475, 10 CFR 50.55a Request for an Alternative Alignment of IWE / Iwl Inspection Program Interval with Corresponding Plant ISI Program Intervals + (10 CFR 50.55a Request for an Alternative Alignment of IWE / Iwl Inspection Program Interval with Corresponding Plant ISI Program Intervals)
- L-19-145, 10 CFR 50.55a Request in Support of the Fourth 10-Year Inservice Inspection (ISI) Interval + (10 CFR 50.55a Request in Support of the Fourth 10-Year Inservice Inspection (ISI) Interval)
- EPID:L-2020-LLR-0002 + (10 CFR 50.55a Request in Support of the Fourth 10-Year Inservice Inspection (ISI) Interval)
- L-17-183, 10 CFR 50.55a Request to Apply Alternative Examination Requirements to Certain ASME Section Xl Class 1 Components (Request IR-056. Revision 2) + (10 CFR 50.55a Request to Apply Alternative Examination Requirements to Certain ASME Section Xl Class 1 Components (Request IR-056. Revision 2))
- ET 16-0006, 10 CFR 50.55a Request to Use ASME Code Cade N-789-2 for the Fourth Inservice Inspection Program Interval + (10 CFR 50.55a Request to Use ASME Code Cade N-789-2 for the Fourth Inservice Inspection Program Interval)
- NRC 2012-0088, 10 CFR 50.55a Request, Relief Request 1 -RR-4 Re-Examination of the Unit 1 Reactor Pressure Vessel Indication on the a Lnlet Nozzle Weld Fifth Ten-Year Inservice Inspection Program Interval + (10 CFR 50.55a Request, Relief Request 1 -RR-4 Re-Examination of the Unit 1 Reactor Pressure Vessel Indication on the a Lnlet Nozzle Weld Fifth Ten-Year Inservice Inspection Program Interval)
- NRC 2013-0072, 10 CFR 50.55a Request, Relief Request RR-4L2 Inservice Inspection Impracticality Examination Limitations Due to Configuration Fourth Ten-Year Inservice Inspection Program Interval, Response to Request for Additional Infomation + (10 CFR 50.55a Request, Relief Request RR-4L2 Inservice Inspection Impracticality Examination Limitations Due to Configuration Fourth Ten-Year Inservice Inspection Program Interval, Response to Request for Additional Infomation)
- NRC 2013-0105, 10 CFR 50.55a Request, Relief Request RR-5 Examination of the Pressurizer Surge Nozzle Inner Corner Region Fifth Ten-Year Inservice Inspection Program Interval + (10 CFR 50.55a Request, Relief Request RR-5 Examination of the Pressurizer Surge Nozzle Inner Corner Region Fifth Ten-Year Inservice Inspection Program Interval)
- NRC-2006-0078, 10 CFR 50.55a Request, Resubmittal of Relief Request 15, Fourth Ten-Year Interval Inservice Inspection (ISI) Program + (10 CFR 50.55a Request, Resubmittal of Relief Request 15, Fourth Ten-Year Interval Inservice Inspection (ISI) Program)
- NRC 2015-0034, 10 CFR 50.55a Request, Withdrawal of Relief Request 2-RR-7 Re-Categorization of Steam Generator Nozzle to Safe-End Welds + (10 CFR 50.55a Request, Withdrawal of Relief Request 2-RR-7 Re-Categorization of Steam Generator Nozzle to Safe-End Welds)
- NRC 2013-0073, 10 CFR 50.55a Request. Relief Request RR-4L3 Inservice Inspection Impracticality Examination Limitations Due to Configuration Fourth Ten-Year Inservice Inspection Program Interval Response to Request for Additional Information + (10 CFR 50.55a Request. Relief Request RR-4L3 Inservice Inspection Impracticality Examination Limitations Due to Configuration Fourth Ten-Year Inservice Inspection Program Interval Response to Request for Additional Information)
- SBK-L-09193, 10 CFR 50.55a Request: PR-1, Containment Building Spray Pump Testing on Recirculation Flow Path for the Third 10-Year Interval + (10 CFR 50.55a Request: PR-1, Containment Building Spray Pump Testing on Recirculation Flow Path for the Third 10-Year Interval)
- SBK-L-09194, 10 CFR 50.55a Request: PR-2, Increase of Vibration Alert Range Absolute Limit to 3.50 Ips for All Containment Building Spray Pump Bearings for the Third 10-Year Interval + (10 CFR 50.55a Request: PR-2, Increase of Vibration Alert Range Absolute Limit to 3.50 Ips for All Containment Building Spray Pump Bearings for the Third 10-Year Interval)