Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML24109A088 + (1 to the Updated Safety Analysis Report, Chapter 6, Plant Engineered Safeguards)
- ML24109A097 + (1 to the Updated Safety Analysis Report, Chapter 15, USAR Drawings, Table of Contents)
- ML24109A096 + (1 to the Updated Safety Analysis Report, Chapter 14, Plant Safety Analysis)
- ML24109A092 + (1 to the Updated Safety Analysis Report, Chapter 10, Plant Auxiliary Systems)
- ML24109A090 + (1 to the Updated Safety Analysis Report, Chapter 8, Plant Electrical Systems)
- ML24109A108 + (1 to the Updated Safety Analysis Report, Appendix K, Renewed Operating License - USAR Supplement)
- ML24109A107 + (1 to the Updated Safety Analysis Report, Appendix J, Fire Protection Program)
- ML24109A094 + (1 to the Updated Safety Analysis Report, Chapter 12, Plant Structures and Shielding)
- ML19289D680 + (1 to the Vendor Inspection Program Plan)
- ML020870172 + (1) 03/26/2002 Limerick Generating Station Unit 1 & 2 Annual Assessment Meeting Slides Presented by Region I. 2) 03/26/2002 Limerick Generating Station Slides for NRC Public Meeting Presented by Exelon)
- ML021550458 + (1) 05/30/2002 Entergy Indian Point 2 Regulatory Performance Meeting Slides 2) 05/30/2002 NRC Region I Indian Point 2 Regulatory Performance Meeting Slides)
- ML25120A372 + (1) Cover Letter - Request for Additional Information in Support of Review of LAR 24-01)
- ML25049A289 + (1) Cover Letter to Penn State University (Public))
- ML25107A213 + (1) Cover Letter: Purdue University Decommission Funding Plan for SNM License 2025 (Public))
- ML20066F509 + (1) Crow Butte Resources, Inc., Crow Butte Project, E-mail Transmitting Latest Version of Financial Surety Mechanism)
- ML22276A240 + (1) FAQ Response Provided by NEI)
- ML25199A184 + (1) HI-STORM FW A10 RAI Letter Second Batch)
- ML21236A302 + (1) Industry-Suggested Edits to IMC 0616 - April 2021 Version)
- ML25125A204 + (1) Integrated Schedule of Regulatory Activities)
- ML24305A155 + (1) Integrated Schedule of Regulatory Activities - November 2024)
- ML19080A186 + (1) Letter to Hobbs, Crystal River Unit 3 Issuance of Amendment Approving ISFSI-Only Emergency Plan Revision 1)
- ML20084L823 + (1) Mcg 2020-301 Final RO Written Exam - Delay Release 2) Mcg 2019-301 Final SRO Written Exam - Delay Release)
- ML21313A120 + (1) NRC Public Meeting with Representatives of the Nuclear Industry to Discuss Approaches Tornado Hazards During ISFSI Short-Term Operations Presentation Slides)
- ML25085A095 + (1) NRC Response on Orano Enrichment USA, LLC Request for Exemption from 10 CFR 51.60(a) - Letter)
- ML050750263 + (1) TS Page - Diablo Canyon, Correction to Page Issued in Amendment Nos 179 and 181, Respectively)
- ML20083H186 + (1) Wma_C_Performance Assessment presentation_June_2014_STOMP_modeling)
- Regulatory Guide 1.85 + (1, (Draft Was Issued as DG-1049), Materials Code Case Acceptability ASME Section III, Division 1)
- SVPLTR 15-0056, 1, 2 and 3 - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report + (1, 2 and 3 - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report)
- ML18184A434 + (1, 2, 3, and ISFSI 10 CFR 50.59, 10 Crf 72.48 Change Report for 2017, and Commitment Change Report for 2017)
- RA-21-0063, 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan + (1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan)
- EPID:L-2020-LLA-0198 + (1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan)
- ML13206A048 + (1, Acceptance Letter Regarding License Amendment Request 13-03, Application for Technical Specification Change Regarding Risk-Informed Justifications for Relocation of Specific Frequency Requirements to a Licensee Controlled)
- ML031920233 + (1, EP-PS-355, Media/Public Officials Contact: Emergency Plan-Position Specific Instruction)
- ML22007A317 + (1, River Bend Station 1, and Waterford Steam Electric Station 3 - Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI)
- ML031920253 + (1, to EP-PS-207, Site Support Manager: Emergency Plan-Position Specific Procedure)
- ML20107K926 + (1,Confirmation of Design Adequacy for Jet Impingement Effects)
- ML20066F954 + (1,Cycle 9,Pattern R8 Core Surveillance Rept)
- ML17056A274 + (1,Restart Readiness Rept)
- ML20084E322 + (1,Safety & Relief Valve Piping Design Rept)
- NOC-AE-000008, 1,Unauthorized Entry Into Protected Area,Safeguards Event Report + (1,Unauthorized Entry Into Protected Area,Safeguards Event Report)
- ML24043A119 + (1- Impacts on RG 1.183 for Workshop2)
- ML21208A212 + (1-0-Agenda - Subsurface Surveys Workshop July 2021)
- ML25042A011 + (1-08-2025 Appendix a - List of Public Meeting Participants)
- ML25042A010 + (1-08-2025 Part 53 Proposed Rule Public Meeting Summary)
- 05000298/LER-1980-005-03, 1-0:on 800116,during Normal Operation,Two through-wall Cracks in Welds in Radiant Energy Conversion North Critical Loop Discovered.Caused by Intergranular Stress Corrosion.Welds Will Be Replaced + (1-0:on 800116,during Normal Operation,Two through-wall Cracks in Welds in Radiant Energy Conversion North Critical Loop Discovered.Caused by Intergranular Stress Corrosion.Welds Will Be Replaced)
- 05000255/FIN-2007007-06 + (1-1 EDG Fuel Header Leak)
- 05000255/FIN-2008003-06 + (1-1 EDG Fuel Header Leak)
- ML14357A323 + (1-1, Update to Emergency Plan)
- ML21208A213 + (1-1-NRC Overview Presentation: Subsurface Surveys Workshop)
- ML22019A214 + (1-10-22 Order (10th Cir.)(Case No. 21-9593))
- ML19077A322 + (1-11 Preparation for Advanced Reactors Environmental Reviews Including Integration of NEPA Processes Presentation ACC-1)