Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Information Notice 1996-02, Inoperability of Power-Operated Relief Valves Masked by Downstream Indications During Testing +
- Information Notice 1996-03, Main Steam Safety Valve Setpoint Variation as a Result of Thermal Effects +
- Information Notice 1996-03, Main Steam Safety Valve Setpoint Variation As a Result of Thermal Effects +
- ML17228B550 +
- ML17333A268 +
- Press Release-96-007, NRC Issues Updated Sdmp List of Contaminated Sites +
- Press Release-96-006, NRC to Hold Workshop January 18-19 in Maryland on Radioactive Devices +
- Press Release-96-005, the Nuclear Regulatory Commission Has Received the Attached Report from Its Advisory Committee on Nuclear Waste +
- ML17311B343 +
- ML18038B596 +
- ML18065A384 +
- ML18065A382 +
- ML20101M520 +
- ML20096E344 +
- ML20096C843 +
- ML20096C292 +
- ML20096C255 +
- ML20096C220 +
- ML20096B810 +
- ML20096B688 +
- ML20096B677 +
- ML20096B672 +
- ML20096B393 +
- ML20096B364 +
- ML20096B333 +
- ML20096B328 +
- ML20096B318 +
- ML20096B292 +
- ML20096B087 +
- ML20129G732 +
- ML20129E641 +
- TAC:M89274 +
- B15476, Application for Amend to License DPR-65,revising TS Sections 3.3.1.1,3.3.2.1 & 3.7.1.6 & Tables 3.3-2,3.3-3,3.3-4 & 3.3-5 & Bases Re Reactor Protective & ESFAS Instrumentation +
- ULNRC-03311, Advises That Amend 105 to License NPF-30,approving TS Changes to TS 4.1.3.1.2,4.4.6.2.2.b,4.4.3.2,4.6.2.1.d, 4.6.4.2 & TS Table 4.3-3 to Implement Recommendations of NRC GL 93-05 Implemented +
- NRC-95-0111, Forwards Response to NRC Re Violations Noted in Insp Rept 50-341/95-13.Corrective Action:Completed Engineering Design Change Package Showing as-built Configuration of Refueling Floor +
- TXX-9529, Submits Suppl to Util W/Respect to Evaluations Performed for in 92-018, Potential for Loss of Remote Shutdown Capability During CR Fire +
- ML20198S270 +
- 05000423/LER-1995-021-02, :on 951207,loop Stop Valves on One Loop Opened W/O Performing TS Surveillance Due to Procedure Inadequacy. Util Evaluated Whether Change Needed to Clarify TS +
- 05000456/LER-1995-019-03, :on 951207,manual Reactor Trip Initiated During Rod Drop Testing Due to Failed Testing Relays.Reactor Trip Breakers Opened +
- 05000254/LER-1995-008-08, :on 951206,HPCIS Declared Inoperable When HPCI Turbine Stop Valve Failed to Open within Acceptable Range of IST Program Due to Loose Connections & Fouled Limit Switch Contacts.Request for PM Initiated +
- 05000456/LER-1995-017-04, :on 951207,manual Reactor Trip Inserted During Rod Control Sys Testing Following Receipt of Urgent Failure Alarm on S/D Bank E.Suspect Failure Detector Card Replaced in Power Cabinet for S/D Banks C,D & E +
- 05000302/LER-1995-027, :on 951206,leak Found in Underground EFW Pump Recirculation Line.Caused by Nearby Excavation Using Power Tools.Mechanical Clamping Device Temporarily Used to Stop Leak Until Repairs Scheduled for 960229 +
- 05000456/LER-1995-018-04, :on 951207,manual Reactor Trip Inserted During Rod Control Sys Testing Following Failure of Shutdown Rod D-2 to Withdraw on Demand.Fuse Holders Cleaned & Fuses Replaced +
- ML20198L450 +
- ML20198S281 +
- ML20096E057 +
- ML20096C967 +
- ML16343A675 +
- TAC:M82962 +
- ML17228B379 +