Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Information Notice 1995-30, Susceptibility of Low-Pressure Coolant Injection Valves to Pressure Locking +
- NRC Generic Letter 1995-05 +
- ML17332A877 +
- ML17311B093 +
- ML18038B383 +
- ML20087L381 +
- ML20087F402 +
- ML20087F384 +
- ML20087C961 +
- ML20087C614 +
- ML20087C546 +
- ML20087C307 +
- ML20087C303 +
- ML20087C298 +
- ML20087C132 +
- ML20087C078 +
- ML20137M803 +
- ML20266B335 +
- TAC:M92131 +
- RBG-41641, Responds to NRC Re long-term Performance Improvement Program Meeting on 950410,in Regard to Development of Impact Statement for Preventive Maint Work Plans +
- ST-HL-AE-5135, Application for Amends to Licenses NPF-76 & NPF-80,changing TS 3.6.1.2 for Clarification of Action Station as Submitted in 950525 Request for Exemption to 10CFR50 App J & Proposed Change to TS 3.6.1.1,3.6.1.2 & 3.6.1.3 +
- ST-HL-AE-5132, Forwards Replacement Figure 1 to Addl Info Re Stp,Unit 2 Core Exit Thermocouple Submitted in Hl&P , Reflecting Correction of Error from Core Exit Thermocouple 17 Via Jumper to Train C Ref Junction +
- RBG-41795, Requests Listed Changes Be Made to NRC Service List for Correspondence Re River Bend Station +
- 3F0895-03, Forwards six-month FFD Program Performance Data for Jan-June 1995 +
- ULNRC-03249, Informs of Implementation of Amend 101 to License NPF-30, Revising TS Sections 4.2.2.2,4.2.2.4 & 6.9.19 Re COLR +
- TAC:M87073 +
- ULNRC-03248, Informs of Implementation of Amend 100 to License NPF-30, Revising TS 3/4.8.1.1 & 3/4.8.1.2 +
- 0CAN089507, Responds to Violations Noted in Insp Repts 50-313/95-16 & 50-368/95-16.Corrective Actions:Survey of Employees Overseeing Personnel Performed & Quality Work Review Conducted +
- 05000278/LER-1995-002-02, :on 950706,HPCI Steam Admission Valve (MO-3-23-14) Failed to Fully Open When Given Initiation Signal.Caused by Failure of Operator Motor.Operator Motor Replaced.W/Undated Ltr +
- ML20087B573 +
- ML20087B566 +
- ML20087C345 +
- ML20087C338 +
- ML20087C315 +
- ML20087C596 +
- ML20087C582 +
- 05000311/LER-1995-005, Forwards LER 95-005-00 Re Failure to Analyze Second Sample W/Radiation Monitor Inoperable +
- HNP-95-072, Requests That 950320 Request for License Amend Re Reactor Trip Sys Instrumentation Setpoint Relocation to COLR Be Withdrawn,Per NRC Position That TS Parameters in Questions Would Not Meet Commission Criteria for Relocation +
- 05000335/LER-1995-003-02, :on 950708,automatic Reactor Trip Occurred During Turbine Overspeed Surveillance Testing Due to Personnel Error.Personnel Involved in Event Counseled & Procedure Changes Being Made +
- ML14181A305 +
- ML16141A933 +
- TAC:M92023 +
- PNO-II-95-047, on 950802,plant Declared Unusual Event Due to Two Gpm Leak from 1A2 RCP Seal to Containment Sump.Unit 1 Shut Down in Mode 3 Preparing for Restart After Hurricane Erin Passed +
- ML16342D003 +
- ML16141A935 +
- ML20155G366 +