Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000346/2012004 +
- IR 05000400/2012004 +
- IR 05000458/2012011 +
- ML12299A326 +
- IR 05000302/2012004 +
- ML12298A430 +
- ML12299A474 +
- ML12299A249 +
- ML13246A381 +
- TAC:ME9853 +
- ML12284A101 +
- ML12275A151 +
- ML13004A474 +
- ML12362A325 +
- ML12298A088 +
- TAC:ME9836 +
- ML12320A564 +
- ML12307A284 +
- RBG-47299, Unit 1, 90-Day Response to Bulletin 2012-01, Design Vulnerability in Electric Power System +
- RBG-47303, Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) +
- CP-201201309, Independent Spent Fuel Storage Installation, Additional Information Regarding Application for Order Approving Indirect and Internal Transfer of Licenses +
- ML12298A111 +
- ML12311A023 +
- NOC-AE-12002908, Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) +
- NOC-AE-12002909, Initial Status Report in Response to March 12, 2012 Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) +
- RA-12-105, Sea Turtle Incidental Take Report 2012-5 +
- NOC-AE-12002920, Revision to Nuclear Regulatory Commission Distribution List +
- BSEP 12-0114, Response to NRC Bulletin 2012-01: Design Vulnerability in Electric Power System +
- L-12-373, Submittal of Emergency Plan Changes, Revision 37 +
- ML12306A415 +
- 3F1012-08, Response to NRC Bulletin 2012-01: Design Vulnerability in Electric Power System +
- NLS2012081, 90-Day Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power System +
- ML12305A165 +
- ML12305A017 +
- RC-12-0121, (VCSNS) Unit 1, South Carolina Electric & Gas Company'S Request for Extension of the 90-Day Response to Bulletin 2012-01, Design Vulnerability in Electric Power System. +
- LIC-12-0148, 90-Day Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power System, for Fort Calhoun Station +
- L-12-360, Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power System. +
- GNRO-2012/00126, Day Response to Bulletin 2012-01, Design Vulnerability in Electric Power System +
- ML12299A345 +
- ULNRC-05920, Enclosure 2 to ULNRC-05920, Amendment 13, LRA Changes from RAI Responses +
- ML12299A248 +
- NRC-12-0059, Day Response to NRC Bulletin 2012-01: Design Vulnerability in Electric Power System, Dated July 27, 2012 +
- ML12299A095 +
- L-12-331, Technical Specification 5.6.6.1 - Steam Generator Inspection Report +
- PLA-6919, 90 Day Response to NRC Bulletin 2012-01 +
- NRC 2012-0091, Response to NRC Bulletin 2012-01 Design Vulnerability in Electric Power System +
- ULNRC-05926, 90-Day Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power System +
- ML12298A384 +
- ML12298A351 +
- Press Release-12-118, ASLB to Hear Oral Arguments Nov. 5-6 on Contention Regarding Cracks in Davis-Besse Shield Building +