ML12299A474

From kanterella
Jump to navigation Jump to search
Dairyland Power Cooperative, La Crosse Boiling Water Reactor (Lacbwr), Possession-Only License DPR-45, DPC Commitment to Place No Spent Fuel in LACBWR Spent Fuel Storage Pool
ML12299A474
Person / Time
Site: La Crosse  File:Dairyland Power Cooperative icon.png
Issue date: 10/24/2012
From: Berg W
Dairyland Power Cooperative
To:
Document Control Desk, NRC/FSME, Office of Nuclear Material Safety and Safeguards
References
LAC-14257
Download: ML12299A474 (2)


Text

WILLIAM L. BERG President and CEO DAIRYLAND POWER COOPERATIVE October 24, 2012 In reply, please refer to LAC-14257 DOCKET NO. 50-409 and 72-046 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Dairyland Power Cooperative La Crosse Boiling Water Reactor (LACBWR)

Possession-Only License DPR-45 DPC Commitment to Place No Spent Fuel in LACBWR Spent Fuel Storage Pool

REFERENCE:

1) Letter (LAC-14254), DPC to NRC, dated September 12, 2012, "Request for Rescission of NRC Orders EA-02-077 and EA-03-099" By letter of Reference 1, DPC requested rescission from the security requirements of NRC Order EA 077, "Interim Compensatory Measures for the Current Threat Environment," and NRC Order EA-03-099, "Issuance of Order for Implementation of Additional Security Measures Associated with Access Authorization, Fitness for Duty and Behavior Observation." The basis for this request is because all spent nuclear fuel has been transferred from the LACBWR spent fuel pool to dry cask storage at the on-site Independent Spent Fuel Storage Installation (ISFSI).

DPC hereby attests that there is no spent fuel stored in the LACBWR spent fuel pool. DPC hereby commits to the NRC that there shall be no spent fuel placed in the LACBWR spent fuel pool from this date forward. If for some unforeseeable reason spent fuel should need to be returned to the spent fuel pool prior to that system's demolition, DPC shall immediately reinstate compliance with the requirements of NRC Orders EA-02-077 and EA-03-099.

If you have any questions concerning this matter, please contact Don Egge, LACBWR Plant/ISFSI Manager at (608) 689-4207.

Sincerely, William L. Berg, President 9 CEO ,.-1vP WLB:JBM:jkl

__2 Cooperative A Touchstone Energy 3200 East Ave. S.

  • PO Box 817 ° La Crosse, WI 54602-0817 . 608-787-1258
  • 608-787-1469 fax
  • www.dairynet.com

Document Control Desk LAC-14257 Page 2

'October 24, 2012 cc: John Hickman Project Manager U.S. Nuclear Regulatory Commission Charles Casto Regional Administrator, Region III U.S. Nuclear Regulatory Commission STATE OF WISCONSIN )

)

COUNTY OF LA CROSSE )

Personally came before me this ,ý. day of 622-O , 2012, the above named, William L. Berg, to me known to be the person who executed the foregoing instrument and acknowledged the same.

My commission expires(/ALuen/be/ b/ /tAm. ,