Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Press Release-95-081, NRC Changes Emergency Planning Requirements for Spent Fuel Storage Facilities +
- Press Release-95-080, the Nuclear Regulatory Commission Has Received Two Reports from Its Independent Advisory Committee on Reactor Safeguards +
- ML17311A970 +
- ML18101A869 +
- ML18101A867 +
- ML20086C523 +
- ML20086B671 +
- ML20086B375 +
- ML20086B236 +
- ML20086A255 +
- ML20086A249 +
- ML20086A143 +
- BSEP-95-0305, Two Inoperable Control Rod Accumulators Result in Entry Into TS 3.0.3 +
- BSEP-95-0303, Reactor Water Cleanup Sys Isolation Due to Filter Leakage +
- ML20085N160 +
- ML20085N155 +
- ML20085N143 +
- ML20085N099 +
- ML20085N092 +
- ML20085N085 +
- ML20085M566 +
- ML20085M464 +
- ML20085M385 +
- ML20085K887 +
- ML20092K980 +
- ML20092A731 +
- ML20091Q669 +
- ML20148H436 +
- ML20134B648 +
- ML20207M157 +
- ML20207M128 +
- ML20207M031 +
- 1CAN069507, Provides Suppl to TS Change Request Re ANO Units 1 & 2 on Control Room Ventilation.Typographical Error Was Introduced on ANO-1 Page 59a +
- LIC-95-0134, Forwards Proprietary & non-proprietary Versions of Rev 5 to EPIP-OSC-21 & Revised EPIP Index +
- ST-HL-AE-5112, Forwards 1RE05 Inservice Insp Summary Rept for Repairs & Replacements for South Texas Project Electric Generating Station,Unit 1 +
- HL-4872, Forwards Addl Info to Support Response Time Testing TS Rev Request, ,based on 950606 Telcon W/Nrc +
- RC-95-0166, Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-395/95-08.Corrective Actions:Removed Damper from Wall to Ensure Unobstructed Air Flow Path in Seismic Event +
- 3F0695-06, Submits Request for Exemption from 10CFR73.55(d)(5) for Use of Hand Geometry Devices.Physical Security Plan Will Be Revised to Allow Licensee Employees & Contractors to Take Badges Offsite +
- BSEP-95-0304, Forwards Response to Violations Noted in Insp Repts 50-324/95-10 & 50-325/95-10.Corrective Actions:Requires That Licensee Maintain Control of Quality by Contractors +
- 3F0695-03, Forwards Response to GL-95-03, Circumferential Cracking of SG Tubes, Per 10CFR50.54(f) +
- ML20265D933 +
- ML20266E804 +
- ML20199L684 +
- 05000298/LER-1995-013, :on 950523,determined That Plant Procedural Requirements Inconsistent W/Assumptions & Commitments Made to NRC on 910930.Caused by Programmatic Deficiency.Rev to Procedure 5.2.5.1 Made +
- ML20085N212 +
- ML20086B247 +
- ML20085N732 +
- ML20086B239 +
- ML20086A155 +
- ML20086B838 +