Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NRC Generic Letter 1990-03 +
- ML17261B041 +
- ML17328A616 +
- ML17285B118 +
- ML18033B219 +
- ML20012F056 +
- ML20012E501 +
- ML20012E492 +
- ML20012E215 +
- ML20012D968 +
- ML20012D967 +
- ML20012D923 +
- ML20012D920 +
- ML20012D890 +
- ML20012D884 +
- ML20012D830 +
- ML20012D821 +
- ML20012D755 +
- ML20012D680 +
- ML20012D164 +
- ML20012C987 +
- ML18094B405 +
- ML18094B364 +
- ML18054B509 +
- ML18054B508 +
- ML18153C155 +
- ML20042G464 +
- ML20087D939 +
- PNO-V-90-010, on 900320,facility Entered TS 3.0.3 After Engineering Organization Determined Main Steam Flow Trip Setpoints Were Incorrect & Nonconservative.Plant Shutdown Began IAW TSs +
- PNO-V-90-011, on 900919,Vice President Nuclear DW Cockfield Announced Resignation After Being in Position Since March 1987.TD Walt Will Serve as Vice President-Nuclear Until Licensee Identify Replacement +
- ML20058A798 +
- TAC:76279 +
- ML20261F083 +
- ML20217C100 +
- ML20092G951 +
- ML20043H026 +
- ML20042D690 +
- ML20042D733 +
- ML20042D677 +
- ML20034C926 +
- IR 05000184/1990002 +
- IR 05000352/1990002 +
- PNO-II-90-016, on 900320,site Area Emergency at Facility Due to Loss of Offsite Power W/Concurrent Loss of Onsite Emergency Diesel Generator Capability.Caused by Truck Accident Onsite +
- ML20033F785 +
- ML20012E805 +
- IR 05000285/1990006 +
- 05000348/LER-1990-002, :on 900222,two Cases Found Where Surveillance Testing Procedures Did Not Perform All Tests Required by Tech Specs.Caused by Inadequate Procedural Guidance. Procedures Revised +
- ML20012D686 +
- IR 05000395/1990006 +
- ML20012D994 +