Special Rept:On 900312,planned Maint Outage of 1E Bs Bus Initiated to Complete 5-yr Bus Cleaning Surveillance, Rendering All Fire Dectection Sys Alarms & Sprinkler Sys Inoperable.Containment Air Temps Monitored Hourly
ML20012D920
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 03/20/1990
From: Nandy F
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9003290092
Download: ML20012D920 (1)


Text

,

if #

h-"

j, 4

.a..

I

/

Southem Califomla Edison Company 23 PARKER STREET

. IRVINE. CALIFORNIA 92718 March 20,.1990 F. R. N ANDY ~

TELEPHONE edANAGER OF NUCLEAR UCEN31NO 1714:5976400 U.

S.

Nuclear Regulatory Commission Document Control-Desk

. Washington,:D.C. !20555'.

~

Subject:

Docket Nos. 50-361 and 50-362

~Special Report-San Onofre Nuclear-Generating Station, Units-2 and 3.

t

. The ' purpose. of;.this submittal is to.. provide the Special. Report required by-Technical-Specification' section 3.7.8.2, Action (b),

t

_of: Facility Operating' Licenses.NPF-10'and'NPF-15, San Onofre Units 2

and 3,

concerning containment spray / sprinkler-systems being.

inoperable for greater than 24' hours.-

.On1 March 12,.1990,1a planned ma ntenance. outage of the 1E 'BS'.bu's-i

>was initiated'to complete a 5-year bus cleaning surveillance.- This'

~

outage rendered all -fire. detection system alarms'and pre-action?

sprinkler systems of-the. Units 2 and 3 fire protection cystem, inoperable since these systems are powered from.the 1E

'BS' bus.

However,~ temporary non-1E power was provided to the.'BS' bus during

the outage'.

In addition, compensatory measures required by all.'the 1 Technical' Specifications associated with.the inoperable systems were

provided, including ~' hourly-monitoring-of the-containment air s

temperatures for abnormal indications'in accordance with TS 3.3.3.7 Action (a.4).

l The fire detection systems and the spray / sprinkler: systems' for Units-i

2 ;- and 3 were returned to service on '. March 17,
1990, followings

~

completion!of.the 1E 'BS' bus outage.

If'you require any additional information, please let me know.

very truly yours,-

[

/

(ik g%

I

'^

J r..

/

lcc: J. B. Martin (Regional Administrator, NRC Region V)

C.,W Caldwell (NRC Senior Resident Inspector, Units 1, 2 and 3)

Institute of Nuclear Power Operations (INPO)

)

t9003290092 900320

= 5, PDR ADOCK 050003 S

PD Q

.