Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17228A903 +
- ML17264A202 +
- ML18038A987 +
- ML20078E046 +
- ML20078E043 +
- ML20077A066 +
- ML20076N571 +
- ML20076N511 +
- ML20076N149 +
- ML20076M688 +
- ML20076M515 +
- ML20076M505 +
- NRC-94-0102, Provides Status of Detroit Edison Initiatives on Pressure Locking & Thermal Binding of Gate Valves +
- ML20076L850 +
- ML20149H477 +
- ML20149H031 +
- ML20149G849 +
- ML20149G790 +
- ML20149G785 +
- ML20149G780 +
- ML20198K217 +
- B15027, Requests Relief from ASME B&PV Code Section XI Requirements, Consistent W/Intent of GL 90-05 & 10CFR50.55a(g)(6)(i). Description of Actions Taken by Util to Make Interim Repairs on Leak in SWS Piping Line 2-SW-6 Encl +
- 0CAN119403, Forwards Info Requested by NRC Administrative Ltr 94-12, Operator Licensing Exam Schedule, Including Number of Operator Licensing Candidates to Be Tested for FY95-98 +
- B14720, Requests NRC Review & Approval of Revised Basis for Fire Protection Exemption +
- TAC:M76683 +
- LIC-94-0192, Updates Response to IE Bulletin 80-06, ESF Reset Controls +
- DCL-94-244, Forwards Change 5 to Rev 18 to Physical Security Plan.Change Withheld (Ref 10CFR73.21) +
- RBG-41036, Forwards ISI Summary Rept Refueling Outage RF-5 +
- NRC-94-4335, Forwards Position Paper on AP600-specific Time Delay in physically-based Source Term +
- 2CAN119402, Clarifies Util Intention to Not Install Replacement Breakers in Next Practical Refueling Outage for ANO Unit 2, Per Concern Raised Re Circuitry Isolation During Electrical Distribution Sys Functional Insp of Facility +
- ML23152A135 +
- BECO-LTR-94-119, Forwards Proprietary Rept of Unsatisfactory Performance Testing Incident. Encl Withheld (Ref 10CFR2.790(b)(1)) +
- ML20265C031 +
- ML20266E875 +
- 05000373/LER-1994-010, :on 940705,Unit 1 Scramed from Power Level of Core Thermal Power.Caused by Loss of Feed Flow to Reactor Pressure vessel.1C34-K653B Circuit Card Replaced +
- 05000298/LER-1994-023, :on 941003,TS Violation Identified for Failure to Perform re-demonstration of DG-1 Operability.Caused by Inadequate Training.Training (Tailgate Sessions) W/Licensed Operations Personnel Will Be Performed +
- 05000373/LER-1994-007-09, :on 941003,div 1,group 2 & 4 Primary Containment & Reactor Bldg Ventilation Isolation Signal Occurred.Caused by Blown Fuse.Fuse Replaced +
- 05000331/LER-1994-012, :on 941004,essential Bus Degraded Voltage Relay Calibr Errors Discovered Due to Failure to Use Line Corrector During Calibr.Surveillance Test Procedure 42B030-A Revised +
- 05000353/LER-1994-009-02, :Between 940829 & 0906,approved Clearance Incorrectly Specified Removal of Fuse from D21 EDG Breaker Auxiliary Control Power Circuit That Would Prevent a CS Sys Subsystem from Automatically Starting +
- ML20078E443 +
- ML20078D704 +
- ML20080B890 +
- ML20078D698 +
- ML20076M641 +
- ML20080B884 +
- IR 05000387/1994016 +
- L-94-260, Application for Amends to Licenses DPR-67 & NPF-16,upgrading TS 3/4.6.2.1 & 3/4.6.2.3 by Adapting Combined Spec for Containment Spray & Cooling Sys Contained in Std TS for C-E Plants +
- ML17291A472 +
- ML16154A699 +
- ML17291A519 +