- 05000272/LER-1995-007, :on 950505,EDGs 1A,1B & 1C Simultaneously Paralleled to Electrical Grid,Resulting in Potential for Common Mode Failure of All Three Edgs.Caused by Mgt/Qa Deficiency.Procedures Revised +
- ML20086T746 +
- ML20086T722 +
- ML20086B495 +
- ML20086A348 +
- ML20085D634 +
- ML20085D589 +
- ML20085B640 +
- ML20085A250 +
- ML20084U157 +
- ML20084T978 +
- ML20084T963 +
- ML20084T919 +
- ML20084T785 +
- ML20084S765 +
- ML20084R444 +
- ML20084R130 +
- ML20084Q539 +
- ML20084P974 +
- ML20084P968 +
- ML20084N301 +
- ML20084N293 +
- ML20084M717 +
- ML20084K756 +
- ML20084J338 +
- ML20084J306 +
- ML20084J264 +
- ML20084H925 +
- 05000324/LER-1995-002, Forwards LER 95-002,fulfilling Requirement for Written Rept within Thirty Days of Reportable Occurrence Re HPCI Failure to Operate as Required During Performance of Periodic Tests +
- ML20091G582 +
- ML20135B307 +
- NRC-95-4474, Forwards Comments on Pr 10CFR50,52 & 100, Reactor Site Criteria Including Seismic & Earthquake Engineering Criteria for Nuclear Plants +
- NRC-95-4467, Forwards Proprietary & Nonproprietary Versions of PCS-T2C-059, Analysis of AP600 Wind Tunnel Testing for PCS Heat Removal. Proprietary Version of Analysis Withheld from Public Dislosure Per 10CFR2.790 +
- NRC-95-4479, Forwards AP600 PRA Electronic Computer Files Requested by NRC During 941020 Meeting.Files Represent Rev 3 PRA Model.W/ Disk Encl +
- B15098, Provides Info Re Unit 2 Insp Program of Critical Welds on Heavy Lift Rigs.Second 10-year Insp Interval Re Welds Will Be Completed During Present Refueling Outage +
- NG-95-1223, Forwards Response to NRC 950214 RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers, Pertaining to Methodology Used to Calculate Electrical Cable Ampacity Derating in Raceways Encased in Thermo-Lag Fire Barrier Matl +
- NRC-95-0054, Responds to NRC Re Violation Noted in Insp Rept 50-341/95-04.Corrective Actions:Inconsistency in Drywell Cooling Water Restoration Support Procedure Corrected & Remaining Seven Emergency Support Procedures Reviewed +
- RC-95-0148, Forwards Rev 1 to Sce&G VC Summer Nuclear Station ASME Section XI Inservice Exam Manual for 2nd Insp Interval +
- RBG-41579, Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-458/95-02 on 950212-0325.Corrective Actions:Maint Was Performed to Return Lighting Units to Functional Status +
- 0CAN069501, Responds to Violation Noted in Insp Rept 50-313/95-03 on 950219-0401.Corrective Actions:Condition Rept (CR-1-95-272) Initiated & Limited Design Change Package (Lcp 95-5003) Developed to Properly Anchor RBC Units & Installed in 1R12 +
- ML20265C888 +
- 05000374/LER-1995-009-02, :on 950503,HPCS DG & HPCS Pump Initiation Occurred Due to Procedural Deficiency.Hpcs Pump Was Secured After Verification That Actual Rv Water Level Was Not Low +
- 05000324/LER-1995-002-02, :on 950510,HPCI Sys Failed to Operate as Required During Performance of HPCI Periodic Test.Caused by End of Burnout.Verified Adequacy of Similar Resistors in Unit 1 & 2HPCI & RCIC Sys +
- BSEP-95-0252, Spurious Actuation of Primary Containment Isolation Sys Group 6 Valves +
- 05000445/LER-1995-002, :on 950505,automatic Reator Trip Occurred. Caused by Lightning Strike.Task Team Formed to Evaluate & Investigate Methods of Minimizing Effects of Lightning Strike +
- NRC-95-4480, Forwards Preliminary Marked Up Sections of AP600 SSAR Chapter 15.Proprietary Portion Withheld +
- ML20085C369 +
- NRC-95-4478, Forwards Draft Rev 4 of Section 3.7 of AP600 SSAR for Discussion at Meeting on Seismic & Structural Issues During Wk of 950612-16 +
- ML20085H985 +
- ML17311A957 +