MONTHYEARML20217P6171999-10-21021 October 1999 Forwards non-proprietary & Proprietary Versions of HI-982083, Licensing Rept for Byron & Braidwood Nuclear Stations. Proprietary Rept Withheld,Per 10CFR2.790(b)(4) ML20217M2871999-10-21021 October 1999 Refers to Rev 5 Submitted in May 1999 for Portions of Byron Nuclear Power Station Generating Stations Emergency Plan Site Annex.Informs That NRC Approval Not Required Based on Determination That Plan Effectiveness Not Decreased ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20217F7891999-10-0808 October 1999 Forwards Insp Repts 50-454/99-12 & 50-455/99-12 on 990803- 0916.One Violation Occurred Being Treated as NCV ML20217B6351999-10-0505 October 1999 Forwards for Info,Final Accident Sequence Precursor Analysis of Operational Event at Byron Station,Unit 1,reported in LER 454/98-018 & NRC Responses to Util Specific Comments Provided in ML20212L1791999-10-0505 October 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Rvid & Is Releasing Rvid Version 2 ML20217B2991999-10-0101 October 1999 Forwards Insp Repts 50-454/99-16 & 50-455/99-16 on 990907-10.No Violations Noted.Water Chemisty Program Was Well Implemented,Resulted in Effective Control of Plant Water Chemistry ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20212J6751999-09-30030 September 1999 Forwards Replacement Pages Eight Through Eleven of Insp Repts 50-454/99-15 & 50-455/99-15.Several Inaccuracies with Docket Numbers & Tracking Numbers Occurred in Repts ML20217A5821999-09-29029 September 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities ML20216F8051999-09-17017 September 1999 Forwards Insp Rept 50-454/99-14 & 50-455/99-14 on 990823-27. Security Program Was Effectively Implemented in Areas Inspected.No Violations Were Identified ML20211P1841999-09-0808 September 1999 Forwards Insp Repts 50-454/99-15 & 50-455/99-15 on 990824- 26.No Violations Noted.Objective of Insp to Determine Whether Byron Nuclear Generating Station Emergency Plan Adequate & If Emergency Plan Properly Implemented ML20211Q6821999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Byron Operator Licesne Applicants During Wks of 000619 & 26.Validation of Exam Will Occur at Station During Wk of 000529 ML20211N5151999-09-0303 September 1999 Ack Receipt of Re Safety Culture & Overtime Practices at Byron Nuclear Power Station.Copy of Recent Ltr from NRC to Commonwealth Edison Re Overtime Practices & Safety Culture Being Provided ML20211K1081999-09-0202 September 1999 Responds to Request for Addl Info to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Braidwood,Units 1 & 2 & Byron,Unit 2 ML20211M1371999-09-0202 September 1999 Discusses 990527 Meeting with Ceco & Byron Station Mgt Re Overtime Practices & Conduciveness of Work Environ to Raising Safety Concerns at Byron Station.Insp Rept Assigned for NRC Tracking Purposes.No Insp Rept Encl ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211G4021999-08-25025 August 1999 Forwards Insp Repts 50-454/99-10 & 50-455/99-10 on 990622-0802.No Violations Noted ML20211B8691999-08-20020 August 1999 Forwards Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Action Plans Developed to Address Configuration Control Weaknesses Not Totally Effective as Listed 05000454/LER-1998-008, Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER1999-08-12012 August 1999 Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210K0771999-07-30030 July 1999 Submits 30-day Rept Re Discovery of ECCS Evaluation Model Error for Byron & Braidwood Stations,As Required by 10CFR50.46 ML20210J8951999-07-29029 July 1999 Submits Other Actions,As Described,To Be Taken for Valves to Resolve Potential Pressure Locking Concerns,In Light of Extended Period for Valve Bonnet Natural Depressurization,In Response to GL 95-07, Pressure Locking & Thermal.. ML20210E2151999-07-23023 July 1999 Forwards Byron Unit 1 B1R09 ISI Summary Rept Spring 1999 Outage,980309-990424, in Compliance with Requirements of Article IWA-6000, Records & Repts of Section XI of ASME & P&PV,1989 Edition ML20209H2991999-07-16016 July 1999 Withdraws 980529 LAR to Credit Automatic PORV Operation for Mitigation of Inadvertent Safety Injection at Power Accident.Response to NRC 990513 RAI Re LAR Encl ML20210A3151999-07-16016 July 1999 Forwards Insp Repts 50-454/99-08 & 50-455/99-08 on 990511-0621.Three Violations Being Treated as Noncited Violations ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) ML20207H7501999-07-12012 July 1999 Forwards Revised Pressure Temp Limits Rept, for Byron Station,Units 1 & 2.Revised Pressurized Thermal Shock Evaluations,Surveillance Capsule Rept & Credibility Repts, Also Encl ML20209G1391999-07-0909 July 1999 Forwards Results of SG Tube Insps Performed During Byron Station,Unit 1,Cycle 9 Refueling Outage within 12 Months Following Completion of Insps ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes ML20196K0161999-06-30030 June 1999 Discusses 990622 Meeting at Byron Nuclear Power Station in Byron,Il.Purpose of Visit Was to Meet with PRA Staff to Discuss Ceco Initiatives in Risk Area & to Establish Dialog Between SRAs & PRA Staff ML20196G2161999-06-25025 June 1999 Forwards for NRC Region III Emergency Preparedness Inspector,Two Copies of Comed Emergency Preparedness Exercise Manual for 1999 Byron Station Annual Exercise. Exercise Is Scheduled for 990825.Without Encls ML20212H8241999-06-24024 June 1999 Informs That Effective 990531 NRC Project Mgt Responsibility for Byron & Braidwood Stations Was Transferred to Gf Dick ML20209D4861999-06-17017 June 1999 Informs That R Heinen,License OP-30953-1 & a Snow,License SOP-30212-3,no Longer Require License at Byron Station 05000454/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed1999-06-0808 June 1999 Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed ML20207G0601999-06-0707 June 1999 Provides Updated Info Re Number of Failures Associated with Initial Operator License Exam Administered from 980914-0918. NRC Will Review Progress Wrt Corrective Actions During Future Insps ML20207G0421999-06-0404 June 1999 Forwards Insp Repts 50-454/99-04 & 50-455/99-04 on 990330-0510.Violations Identified & Being Treated as non-cited Violations ML20195D6351999-06-0404 June 1999 Notifies NRC of Actions That Has Been Taken in Accordance with 10CFR26, Fitness for Duty Programs ML20207E5451999-05-28028 May 1999 Forwards Insp Repts 50-454/99-07 & 50-455/99-07 on 990517-20.No Violations Noted.Fire Protection Program Was Effective ML20211M1611999-05-28028 May 1999 Discusses 990527 Meeting with Comed Re Safety Culture & Overtime Control at Byron Nuclear Plant from Videoconference Location at NRC Headquarters.Requests That Aggressive Actions Be Taken to Ensure That Comed Meets Expectations ML20207D5261999-05-26026 May 1999 Forwards Response to NRC 990318 RAI Concerning Alleged Chilling Effect at Byron Station.Attachment Contains Responses to NRC 12 Questions ML20207B6361999-05-25025 May 1999 Forwards SE Accepting Revised SG Tube Rupture (SGTR) Analysis for Bryon & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station ML20211M1781999-05-25025 May 1999 Summarizes Concerns with Chilling Effect & Overtime Abuses at Commonwealth Edison,Byron Station.Request That Ltr Be Made Part of Permanent Record of 990527 Meeting ML20195C7911999-05-25025 May 1999 Forwards Revised COLR for Byron Unit 2,IAW 10CFR50.59.Rev Accounts for Planned Increase of Reactor Coolant Full Power Average Operating Temp from 581 F to 583 F 05000454/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B).Required Actions to Address Causes of Event Listed1999-05-21021 May 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B).Required Actions to Address Causes of Event Listed ML20206U3471999-05-20020 May 1999 Forwards Insp Rept 50-454/99-05 on 990401-22.No Violations Noted.Insp Reviewed Activities Associated with ISI Efforts Including Selective Exam of SG Maint & Exam Records, Calculations,Observation of Exam Performance & Interviews ML20207A2151999-05-19019 May 1999 Forwards Insp Repts 50-454/99-06 & 50-455/99-06 on 990419-23.No Violations Noted.Insp Consisted of Review of Liquid & Gaseous Effluent Program,Radiological Environmental Monitoring Program,Auditing Program & Outage Activities 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217P6171999-10-21021 October 1999 Forwards non-proprietary & Proprietary Versions of HI-982083, Licensing Rept for Byron & Braidwood Nuclear Stations. Proprietary Rept Withheld,Per 10CFR2.790(b)(4) ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) 05000454/LER-1998-008, Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER1999-08-12012 August 1999 Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210K0771999-07-30030 July 1999 Submits 30-day Rept Re Discovery of ECCS Evaluation Model Error for Byron & Braidwood Stations,As Required by 10CFR50.46 ML20210J8951999-07-29029 July 1999 Submits Other Actions,As Described,To Be Taken for Valves to Resolve Potential Pressure Locking Concerns,In Light of Extended Period for Valve Bonnet Natural Depressurization,In Response to GL 95-07, Pressure Locking & Thermal.. ML20210E2151999-07-23023 July 1999 Forwards Byron Unit 1 B1R09 ISI Summary Rept Spring 1999 Outage,980309-990424, in Compliance with Requirements of Article IWA-6000, Records & Repts of Section XI of ASME & P&PV,1989 Edition ML20209H2991999-07-16016 July 1999 Withdraws 980529 LAR to Credit Automatic PORV Operation for Mitigation of Inadvertent Safety Injection at Power Accident.Response to NRC 990513 RAI Re LAR Encl ML20207H7501999-07-12012 July 1999 Forwards Revised Pressure Temp Limits Rept, for Byron Station,Units 1 & 2.Revised Pressurized Thermal Shock Evaluations,Surveillance Capsule Rept & Credibility Repts, Also Encl ML20209G1391999-07-0909 July 1999 Forwards Results of SG Tube Insps Performed During Byron Station,Unit 1,Cycle 9 Refueling Outage within 12 Months Following Completion of Insps ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes ML20196G2161999-06-25025 June 1999 Forwards for NRC Region III Emergency Preparedness Inspector,Two Copies of Comed Emergency Preparedness Exercise Manual for 1999 Byron Station Annual Exercise. Exercise Is Scheduled for 990825.Without Encls ML20209D4861999-06-17017 June 1999 Informs That R Heinen,License OP-30953-1 & a Snow,License SOP-30212-3,no Longer Require License at Byron Station 05000454/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed1999-06-0808 June 1999 Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed ML20195D6351999-06-0404 June 1999 Notifies NRC of Actions That Has Been Taken in Accordance with 10CFR26, Fitness for Duty Programs ML20211M1611999-05-28028 May 1999 Discusses 990527 Meeting with Comed Re Safety Culture & Overtime Control at Byron Nuclear Plant from Videoconference Location at NRC Headquarters.Requests That Aggressive Actions Be Taken to Ensure That Comed Meets Expectations ML20207D5261999-05-26026 May 1999 Forwards Response to NRC 990318 RAI Concerning Alleged Chilling Effect at Byron Station.Attachment Contains Responses to NRC 12 Questions ML20211M1781999-05-25025 May 1999 Summarizes Concerns with Chilling Effect & Overtime Abuses at Commonwealth Edison,Byron Station.Request That Ltr Be Made Part of Permanent Record of 990527 Meeting ML20195C7911999-05-25025 May 1999 Forwards Revised COLR for Byron Unit 2,IAW 10CFR50.59.Rev Accounts for Planned Increase of Reactor Coolant Full Power Average Operating Temp from 581 F to 583 F 05000454/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B).Required Actions to Address Causes of Event Listed1999-05-21021 May 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B).Required Actions to Address Causes of Event Listed ML20195B2301999-05-19019 May 1999 Requests Approval of Proposed Changes to QA Topical Rept CE-1-A,rev 66a.Attachment a Describes Changes,Reason for Change & Basis for Concluding That Revised QAP Incorporating Proposed Changes Continues to Satisfy 10CFR50AppB ML20207E9831999-05-18018 May 1999 Forwards Copy of Commonwealth Edison Co EP Exercise Evaluation Objectives for 1999 Byron Station Annual EP Exercise,Which Will Be Conducted on 990825.Without Encl ML20206N8551999-05-11011 May 1999 Forwards 1998 Annual Radioactive Environ Operating Rept for Byron Station. Rept Includes Summary of Radiological Liquid & Gaseous Effluents & Solid Waste Released from Site ML20206U3351999-04-30030 April 1999 Forwards Evaluation of Matter Described in Re Byron Station.Concludes That Use of Overtime at Byron Station Was Controlled IAW Administrative Requirements & Mgt Expectations Established to Meet Overtime Requirement of TS ML20206F5381999-04-30030 April 1999 Forwards Magnetic Tape Containing Annual Dose Repts for 1998 for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR20.2206(c).Without Magnetic Tape ML20206C7901999-04-23023 April 1999 Provides Suppl Info Re Use of W Dynamic Rod Worth Measurement Technique,As Requested During 990413 Telcon.Rev Bars in right-hand Margin Identify Changes from Info Submitted by ML20206E7521999-04-22022 April 1999 Submits Rept on Number of Tubes Plugged or Repaired During Inservice Insp Activities Conducted at Plant During Cycle 9 Refueling Outage,Per TS 5.6.9 ML20206A7431999-04-22022 April 1999 Forwards Comments Generated Based on Review of NRC Ltr Re Preliminary Accident Sequence Precursor Analysis for Byron Station,Unit 1 ML20206B3941999-04-21021 April 1999 Forwards Annual & 30-Day Rept of ECCS Evaluation Model Changes & Errors, for Byron & Braidwood Stations.Updated Info Re PCT for Limiting Small Break & Large Break LOCA Analysis Evaluations & Detailed Description of Errors ML20206B2471999-04-20020 April 1999 Informs That SE Kuczynski Has Been Transferred to Position No Longer Requiring SRO License.Cancel License SOP-31030-1, Effective 990412 ML20205S9621999-04-20020 April 1999 Responds to 981203 RAI Telcon Re SG Tube Rupture Analysis for Byron Station,Unit 2 & Braidwood Station,Unit 2.Addl Info & Subsequent Resolution of Issues Discussed During 990211 Telcon Are Documented in Encl ML20206A8141999-04-20020 April 1999 Advises NRC of Review of Cycle 10 Reload Under Provisions of 10CFR50.59 & to Transmit COLR for Upcoming Cycle ML20205T3901999-04-13013 April 1999 Forwards Byron Station 1998 Occupational Radiation Exposure Rept, Which Is Tabulation of Station,Utility & Other Personnel Receiving Annual Deep Dose Equivalent of Less than 100 Mrem ML20196K6661999-03-31031 March 1999 Forwards Byron Nuclear Power Station 10CFR50.59 Summary Rept, Consisting of Descriptions & SE Summaries of Changes, Tests & Experiments.Rept Includes Changes Made to Features Fire Protection Program,Not Previously Presented to NRC ML20205K5841999-03-31031 March 1999 Submits Rept on Status of Decommissioning Funding for Reactors Owned by Comm Ed.Attachment 1 Contains Amount of Decommissioning Funds Estimated to Be Required Pursuant to 10CFR50.75(b) & (C) ML20205B4241999-03-23023 March 1999 Provides Results of drive-in Drill Conducted on 990208,as Well as Augmentation Phone Drills Conducted Since 981015,as Committed to in Util ML20207K0351999-03-0404 March 1999 Forwards Util Which Transmitted Corrected Pages to SG Replacement Outage Startup Rept.Subject Ltr Was Inadvertently Not Sent to NRC Dcd,As Required by 10CFR50.4 ML20205C6861999-03-0404 March 1999 Provides Notification That Byron Station Implemented ITS on 990205 & Braidwood Station Implemented ITS on 990219 ML20207D6831999-03-0101 March 1999 Forwards fitness-for-duty Program Performance Data for Each Comed Nuclear Power Station & Corporate Support Employees for Six Month Period Ending 981231,per 10CFR26.71(d) ML20207D4301999-02-26026 February 1999 Informs NRC That Supplemental Info for Byron & Braidwood Stations Will Be Delayed.All Mod Work Described in Ltr Is on Schedule,Per GL 96-06 ML20207B8971999-02-25025 February 1999 Expresses Concern That Low Staffing Levels & Excessive Staff Overtime May Present Serious Safety Hazard at Some Commercial Nuclear Plants in Us ML20203C7001999-02-0202 February 1999 Informs That Mhb Technical Associates No Longer Wishes to Receive Us Region III Docket Info Re Comed Nuclear Facilities.Please Remove Following Listing from Service List ML20202F5911999-01-29029 January 1999 Forwards Byron Unit 1 Cycle 9 COLR in ITS Format & W(Z) Function & Byron Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function. New COLR Format Has Addl Info Requirements ML20199E1611999-01-15015 January 1999 Forwards Response to 980902 RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. CE Endorses Industry Response to RAI as Submitted by NEI ML20199B7511999-01-0808 January 1999 Forwards Proprietary Versions of Epips,Including Rev 52 to Bzp 600-A1 & Rev 48 to Bzp 600-A4 & non-proprietary Version of Rev 52 to Bzp 600-A1 & Index.Proprietary Info Withheld 1999-09-30
[Table view] |
Text
p- 1
, Commonwealth libwn Onnpany.
I400 Opus Place L***
g
.g.
nownen cnne.n tosis June 2',1995 Office of Nuclear Reactor Regulations U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: NRC Document Control Desk ,
Subject:
Byron Unit 1 Cycle 7 Mid-cycle Inspection Plans NRC Docket Number 50-454
References:
- 1. August 1,1994, letter from J. A. Bauer to W. T. Russell transmitting Byron Station's request for a license amendment to implement a 1.0 volt Interim Plugging Criteria, with supplements dated September 7, -
1994, September 17,1994, September 22,1994, September 30, 1994, and October 17,1994.
- 2. October 24,1994, letter from R. A. Capra to D.L. Farrar transmitting i Safety Evaluation for Use of a 1.0 Volt Interim Plugging Criteria for Byron Unit 1.
- 3. January 30,1995, letter from G. K. Schwartz to J.B. Martin transmitting the Byron Unit 1 Cycle 6 Interim Plugging Criteria 90 Day i Report and includes WCAP-14277, "SLB Leak Rate and Tube Burst Probability Analysis Methods for ODSCC at TSP Intersections, dated January,1995".
Reference 2, transmitted Nuclear Regulatory Commission's (NRC) Safety Evaluation Report (SER) for the use of a 1.0 volt interim Plugging Criteria (IPC) for Byron Unit 1.
In the SER, the Staff required Byron Station to submit plans for assessing the mid-cycle steam generator inspection data at least 60 days prior to the planned outage.
The inspection scope, inspection techniques, and analysis methodologies to be implemented during the Fall 1995 Byron Unit 1 mid-cycle inspection outage (B1P02) will be the same as implemented during the Fall 1994 Byron Cycle 6 refuel outag (81R06) and approved by Reference 2. Reference 1 and Reference 3 provide an in-depth description of the inspection and analysis methodologies for implementing the 1.0 volt IPC at Byron. ,
4 K.ntabroMaxtydycM 1 0 e
Q A Unkum company L_ .
i
, eme r- i NRC Document Control June 2,1995 l
On February 13,1995, Comed requested an amendment to Technical Specification
'4.4.5 to increase the IPC voltage limit from 1.0 volt to 3.0 volts. Approval of this :
revision was requested for B1P02 scheduled for September of 1995. The inspection scope leak and burst analysis methodologies described in this document assume that the currently approved 1.0 volt IPC would be applied. With approval of the' proposed ,
3.0 volt IPC and related supplements, the associated inspection scope leak and burst i analysis methodologies will be applied.
The following is a summary of the 1 volt IPC requirements which will be used to collect, analyze, and assess the steam generator (SG) tube inspection data during the B1P02 outage.
Insoection and Reoair Scoce: Byron will perform a 100% full length bobbin coil inspection of all hot leg and cold leg tubing. Byron has not experienced any outer diameter stress corrosion cracking (ODSCC) on the cold leg side. A 0.610 inch diameter bobbin probe will be used to inspect all intersections where IPC is applied.
In addition to the bobbin coil inspection, three coil rotating pancake coil (RPC) !
examinations will be performed on the following:
All ODSCC indications at TSP intersections greater than 1.0 volt. Any confirmed indications >1.0 volt and < or equal to 2.7 volts will be plugged or repaired. All indications greater than 2.7 volts will be plugged or repaired regardless of RPC confirmation.
All TSP intersections with dent signals greater than 5.0 volts. Any confirmed indications will be plugged or repaired.
A 20% sample of TSP intersections with dent signals between 2.5 and 5.0 volts.
The sample size will be expanded to 100% should any confirmed indication be indicative of PWSCC. The NRC will be promptly notified if any PWSCC indications are identified at the tube support plate intersections. All confirmed indications will be plugged or repaired.
All TSP intersections with large mixed residuals that could cause a 1.0 volt indication to be missed or misread. Any confirmed indications will be plugged i or repaired.
A minimum sample of 100 TSP intersections that contain indications 1.0 volt or less.
I K:ntatyroMsutydych2 ,
, : .a.-
17 NRC Document Control June 2,1995 I
IPC will not be applied to those interscetions that are susceptible to collapse or l
_ deformation during a postulated LOCA + SSE event. The excluded tube intersections are identified in WCAP-14046, Revision 2, transmitted to the Staff on February 15, 1995.' l Insoection Guidelinec: The eddy current acquisition and analysis guidelines to be ,
used during B1P02 are the same as those implemented during the B1R06 inspection .
and the Braidwood Unit 1 mid-cycle outage in February of 1995. These guidelines were included and described in Reference 1 and the associated supplements.
Methodology for Leakage and Burst Evaluations: The methodology for assessing tube 4 leakage and burst considerations will be the same as that implemented during B1R06 and as approved in Reference 2. A detailed description of the methodologies is i included in Reference 1 and Reference 3. Major aspects of the leakage and burst ;
evaluations are as follows:
- The beginning of cycle (BOC) voltage distribution is determined by scaling the !
as-found voltage distribution by 1/ POD (probability of detection) and then 1 subtracting the indications that are repaired. A POD of 0.6 will be used for all ;
voltage ranges. l The BOC voltage distribution is adjusted for voltage growth and eddy current- .
uncertainty by applying a Monte Carlo simulation to determine a projected end o' cycle (EOC) voltage distribution.
The Main Steam Line Break (MSLB) leakage and burst calculations are based on full Monte Carlo methodologies that account for parameter uncertainty. I 1
The MSLB leakage calculation is consistent with the methodology described in ]
the draft Generic Letter for 1.0 volt IPC. This method uses a log-logistic l probability of leakage model and the conditional leak rate versus voltage correlation. !
The conditional probability of tube burst assessment is consistent with the j methodology in the draft IPC Generic Letier. This method uses a free span ,
tube burst pressure versus voltage correlation and the conditional probability of j burst model. As described in Reference 3, the probability of multiple tube-ruptures is assessed with this analysis.
K:niatyron\sxtydycf@
f NRC Document Control June 2,1995
- . The database for the leakage and burst correlations is the same database used for the Byron Uinit 1 Cycle 6 evaluation (as described in Reference 3) with the inclusion of the Byron Unit 1 Cycle 6 and the Braidwood Unit 1 Cycle 4 tube pull results.
Please note that for the purpose of the ieak and burst evaluations for B1P02, reference to the previous cycle is defined as from BOC-7 to the mid-cycle outage and reference to the next cycle is definer; as the time period from the mid-cycle to EOC-7.
Reoortina Reauirements: Byron will satisfy the reporting requirements of Technical Specification 4.4.5.5 and the draft .PC Generic Letter. Reports to the Staff will be made prior to restart as follows:
If the estimated leakage based on the actual measured as found voltage distribution would have exceeded the site specific MSLB leakage limit. If the leakage lirr,it would have been exceeded, then a safety assessment will be submittec to the NRC prior to plant restart.
If circumferential crack-like indications are detected at the TSP. intersections.
- If Indications, are identified that extend beyond the confines of the' TSP.
If the calculated conditional probability of burst exceeds 1 x10'8 A safety assessment is required to be submitted to the NRC prior to plant startup for this
~
condition.
The final results of the inspection and tube integrity evaluation will be reported to NRC within 90 days following plant restart. Content of the 90 day report will be consistent with the reporting requirements stated in the draft Generic Letter and Reference 3.
Unit Restart: Prior to Byron Unit 1 restart, Comed will submit any required reports or safety assessments as discussed above. it is Comed's understanding that after reports and/or safety assessments are transmitted to the Staff, Byron Unit 1 will proceed with Unit Startup unless otherwise notified by the NRC. If no specific reports are required per the Technical Specifications or draft Generic Letter, Byron Unit 1 restart will proceed upon completion of all outage activities.
K:nlatyroff.sztydycM
4
.., 1
'}
NRC Document Control June 2,1995 Please address any questions that you may have to this office.
I Sincerely,
& oc j0 ;
Denise M. S' omando Nuclear Licensing Administrator cc: D. Lynch, Senior Project Manager, NRR G. Dick, Byron Project Manager, NRR H. Peterson, Senior Resident inspector, Byron J. Martin, Regional Administrator Office of Nuclear Safety-IDNS t
t i