Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000382/2013404 +
- IR 05000269/2013407 +
- IR 05000317/2013503 +
- ML13337A155 +
- IR 05000277/2013403 +
- IR 05000089/2013001 +
- IR 05000416/2013302 +
- ML15027A458 +
- TAC:MF0117 +
- TAC:MF3210 +
- ML13346A011 +
- TAC:MF0192 +
- TAC:MF0132 +
- TAC:MF0128 +
- ML13346A264 +
- TAC:MF0125 +
- TAC:MF0134 +
- ML14041A295 +
- CY-13-048, Redacted - Haddam Neck Plant Independent Spent Fuel Storage Installation, Biennial Update Final Safety Analysis Report +
- ML13282A147 +
- CY-13-049, Redacted - Connecticut Yankee Atomic Power Company - Biennial Update to the Haddam Neck Plant License Termination Plan +
- ML13354B850 +
- ML13336A860 +
- CY-13-051, Independent Spent Fuel Storage Installation, Biennial Update of Quality Assurance Program +
- NL-13-146, Supplemental Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis (CLB) for Seismic Requirements +
- ML13343A143 +
- ML13343A026 +
- 3F1213-02, Post-Shutdown Decommissioning Activities Report +
- ONS-2013-022, Additional Information Associated with License Amendment Request for Reverse Osmosis System Operation, License Amendment Request No. 2012-05, Supplement 5 +
- ML13339A739 +
- CNL-13-124, Tennessee Valley Authority - Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding the Watts Bar Nuclear Plant Seismic Walkdown Results of Recommendation 2.3 of the Near-Term Ta +
- CNL-13-123, Tennessee Valley Authority - Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding the Browns Ferry Nuclear Plant Seismic Walkdown Results of Recommendation 2.3 of the Near-Term +
- ML13339A169 +
- ML13338A299 +
- CNS-13-007, Response to Request for Additional Information Regarding the Seismic Hazard Walkdowns Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns +
- Press Release-I-13-041, NRC Region I Office to Conduct Webinar on Use of Dry Cask Storage at Pilgrim Nuclear Power Plant +
- ONS-2013-025, Emergency Plan Implementing Procedures Manual, Volume C, Revision 2013-14 +
- GNRO-2013/00087, Supplemental Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis (Clb) for Seismic Requirements +
- JAFP-13-0150, JAFP-13-0150, Supplemental Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis (CLB) for Seismic Requirements +
- DCL-13-114, Response to November 1, 2013, Request for Additional Information Regarding Recommendation 2.3 Seismic +
- LR-N13-0272, Response to NRC Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3: Seismic Walkdowns +
- ML13337A395 +
- LR-N13-0271, Response to NRC Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3: Seismic Walkdowns +
- PNO-II-13-008A, Update: Oconee Unit 1 Shutdown Due to Reactor Coolant System (RCS) Pressure Boundary Leakage +
- ML13336A911 +
- ML13336A909 +
- LIC-13-0164, Integrated Report to Support Restart of Fort Calhoun Station and Post-Restart Commitments for Sustained Improvement +
- ML13336A775 +
- PNP 2013-083, Response to Request for Additional Information - License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors +
- ML13336A537 +