Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17333A274 +
- ML17333A269 +
- ML17333A020 +
- Press Release-96-010, NRC Denies Exemption Requests on Radiography Equipment Requirements +
- ML17353A631 +
- ML17312A526 +
- ML18102A131 +
- ML18101B385 +
- ML20100J377 +
- ML20100C013 +
- ML20100B960 +
- ML20100B954 +
- ML20100B930 +
- ML20097H735 +
- ML20096H343 +
- ML20096H011 +
- ML20096G931 +
- ML20096G558 +
- ML20096G354 +
- ML20096E861 +
- ML20096E845 +
- ML20108B117 +
- ML20141D252 +
- ML20202C978 +
- ML20202C970 +
- ML20266H387 +
- ML20216D694 +
- NRC-96-4626, Responds to NRC RAI on AP600 Design Certification Program +
- BSEP-96-0006, Responds to NRC Re Violations Noted in Insp Repts 50-324/95-24 & 50-325/95-24.Corrective Actions:Evaluated Methods Used to Ensure That 4KV Breakers Properly racked-in & to Revise Site Independent Verification Procedure +
- ML20203H416 +
- ML20203H400 +
- ML20203H411 +
- ML20203H406 +
- ML20203H392 +
- ML20138E923 +
- ML20100C799 +
- 05000327/LER-1995-019, :on 951225,manual Reactor Trip Occurred as Result of Main Generator Exciter Problems.Caused by Field Pole Failure in Main Generator.Replaced Exciter +
- 05000325/LER-1995-022, :on 951220,HPCIS Discharge Flow Element Gasket Leaked.Caused by Improperly Installed Gasket.Gasket & Hydraulic Actuator Were Replaced +
- 05000328/LER-1995-007-03, :on 951221,RT W/Afw Start & FW Isolation Was Result of Switchyard Power Circuit Breaker Failure.Caused by Loss of Condenser Vacuum.Cr Staff Promptly Diagnosed Plant Conditions & Shutdown Unit +
- 05000334/LER-1995-011, :on 951218,missed Source Range Surveillance Occurred.Caused by Lack of Attention to Detail by Operations Supervisors Controlling Plant Shutdown Procedure.Operations Supervisors Involved Counseled +
- ML20100C803 +
- TAC:M93338 +
- 05000255/LER-1995-016, :on 951226,did Not Analyze Primary Coolant Samples within 72 H.Caused by Belief Acceptability to Save PCS Samples for Choride Analysis Past 72 H.Counseled Chemistry Supervision +
- PNO-III-96-003, on 960116,2,400 Volt Power Sys Automatically Transferred from Normal Source to Backup Power Source. Licensee Commenced Plant Shutdown on 960117 & Plans to Make Repairs to Power Cable +
- GO2-96-014, Application for Amend to License NPF-21 Re Primary Containment Leakage Testing +
- IR 05000400/1995017 +
- ML15218A146 +
- TAC:M93942 +
- ML20036D129 +
- ML20096G641 +