ML20096H011

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to Seismic Evaluation Rept & Rev 1 to Relay Evaluation Rept, for Resolution of USI A-46,per GL 87-02
ML20096H011
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/19/1996
From: Link B
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20096H014 List:
References
REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR GL-87-02, GL-87-2, VPNPD-96-0003, VPNPD-96-3, NUDOCS 9601260223
Download: ML20096H011 (4)


Text

=

- i [.

WISCONSIN Electnc w

POWER COMPANY 231 W M cNgon. PO Box 2046. Mdwookee. WI 53201-20l'$

(414)220 2345 VPNPD-96-0003 January 19,1996 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION

~

Mail Station PI-137 Washington,DC 20555 Gentlemen:

E DOCKETS 50-2@ AND 50-301

{

GENERIC 1.ETTER 87 02 REyJSION 1 TO

SUMMARY

REPORT FOR RESOLUTION OF UNRESOLVED SAFETY ISSUE A46 POlffr BEACH NUCLEAR PLANT. UNITS 1 AND 2 INTRODUCTION

[

On June 30,1995, Wisconsin Electric (WE) submitted to the NRC WE Letter VPNPD-95-05.4. " Generic Letter 87 L

02 Summnaq Report for Resolution of Unresolved Safety issue A46, Point Beach Nuclear Plan. Units 1 and 2."

Jed as attachments the following reports; That lette*

1.

WE h ; 3each Nuclear Plant Units I and 2,"USNRC Generic Letter 87-02, USI A46 Resolution, Seismic Evaluation Report," Rev. 0, June 1995.

2.

WE Point Beach Nuclear Plant Units I and 2,"USNRC Generic I ctter 87-02, USI A46 Resolu' ion, Relay Evaluation Report," Rev. 0, June 1995.

During subsequent reviews of these submitted reports following the June 30 submittal, we have identified corrections that should be made to the reports.

OUTLIERS Our reviews of the Seismic Evaluation Report identified threc outliers associated with the Point Beach Nuclear Plant cable trays that were not discussed in Revision 0 of the report. The outliers were identified and docurnented during the USI46 seismic verification walkdowns.

These outliers are:

1) a loose base clip angle on one side of a floor to ceiling cable tray support;
2) cable bundles in PBNP Unit 1 Containment,46' clevation hanging out of their respective cable trays with no visible cable ties securing them :0 the trays.
3) one instance in PBNP Unit 2 Containment,46' elevation where cable bundles were hanging out of their respective vertical cable tray with no visible cable ties securing them to the tray.

The outliers along with the proposed resolution are discussed in Sections 7,8 and 9 of the Seismic Evaluaaon R,-

960126022: 960119 DR ADOCl 05000266

'h p

zouvut s

x

l 1

l Document Control Clerk January 19,1996 i

Page 2 ADMINISTRATIVE CHANGES Our reviews have also identified administrative dianges th?t should be made to each of the submitted reports for

~

completeness and clarification. These changes are summarized in a table at the beginning of the enclosed Attachments A and B.

REVISION SUBMITTAL This letter tratzsmits Revision I to the above reports for incorporation into your copies. Attachments A and B provide the instructions for incorporating the resised sections, a summary of the revisions, and the revised sections for each of the respective reports. The specific changes in each revised section are identified with margin bars in the left margin. For convenience, we have provided replacements for all of the pages for each revised section.

We would be pleased to answer any questions you may have regarding the results of our USl A-46 study or the enclosed report revisions.

Sincerely, 3

(

r' Bob Link Vice President Nuclear Power Attachments cc:

NRC Resident Inspector NRC Regional Administrator l

' Subscribed and sworn to before me this,194 day of CL m.1996.

At LsA a'

blic, State of Wisconsin yCommissionexpires /0!)k76 TJD/kmc bec:

Anthony, Arneson, Krieser, Maxfield, Newton, Patuiski,1;1mer, Reimer, Hanneman, Krause, Sasman, McNamara L

VPNPD-96-003, Attachment A Revision 1 to WE Reoort. "USNRC Generic Letter 87-02. USI A-46 Resolution. Seismic Evaluation Renort." Point Beach Nuclear Plant Units 1 and 2.

Please replace the Revision 0 sections listed below in your copy of the WE " Seismic Evaluation Report" with the Revision I sections attached.

Section Revision Summary of Revision Cover Page 1

Changes the format to include the originalissue date ofJune 1995 and the revision 1 date ofJanuary 1996

~

Title Page 1

Changes the format to include the original issue date of June 1995 and the revision I date of January 1996 Table of Contents 1

Adds subsection headings under Sections 2 and 9.

Adds the heading for Section 7.6 Adds the revision number after each section heading.

List of Acrodyms 0

Included because of the page number change from "iii" to "iv."

Section 6 1

Page 6-3; corrects the ID field in Table 6-1, line item 12.

Section 7 1

Page 7-8; adds a discussion of"Other Seismic Performance Concems" outliers.

Page 7-9; adds a discussion of an

" Isolated Outlier."

Page 7-10; corrects Interaction Values for LARs # 6 & 7 Page 7-14; adds a summary discussion of the outliers added on pages 7-8 and 7-9.

Section 8 1

Page 8-2; adds clarification as to which outliers are associated with USI A-46.

Pages 8-5 and 8-6; correct the air receive tank ID from T-60F to T-61F, adds items A29 and A30 to the list of Page A-1

VPNPD-96-003, Attachment A Revision I to WE Report. "USNRC Generic Letter 87-02. USI A-46 Resolution. Seismic Evaluation Renort." Point Beach Nuclear Plant Units 1 and 2.

Section Revision Summary of Revision 4

outliers.

Section 9 1

Pages 9-1,9-4,9-7 and 9-11; corrects spelling errors.

Page 9-8; identifies items which were walked down for the IPEEE only.

Page 9-15; corrects line item 99 equipment ID. Adds cross reference to Section 8 of the report for clarification. Adds the word " room" which was missing.

Page 9-16; Adds the discussion of the cable tray related outliers.

Section 10 1

Page 10-2; The original Ref. 20 and Ref 24 " ere duplicates. The change deletes ti.e original Ref 20 and replaces it with an additional reference.

Page 10-3; adds an additional reference.

Page A-2

i POJNT BEACH NUCLEAR PLANT UNITS 1 & 2 i

j h

N-

~

j

~_

~

NN i

~ Q )'!

l l

J I

-D1 j

j ear l

USNRC GENERIC LETTER 87-02 USl A-46 RESOLUTION SEISMIC EVALUATION REPORT Original issue June 1995 nevision 1 January 1996

.