Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17250B020 +
- ML17285A810 +
- ML18094B130 +
- ML18094B128 +
- ML18054B061 +
- 05000255/LER-1989-021-02, :on 890918,identified Possibility for Single Relay Failure Leaving Control Room HVAC Train in Normal Mode When Emergency Mode Would Be Desired.Switchover Circuitry Not Designed to Meet Single Failure Criteria +
- ML18153B945 +
- ML18153B947 +
- ML19332B625 +
- ML19327C164 +
- ML19327B417 +
- ML19327B414 +
- ML19327B180 +
- RBG-31638, Responds to NRC Bulletin 88-010,Suppl 1.Traceability of Circuit Breakers Established Through Mfg Certificate of Conformance +
- ML19325E358 +
- ML19325E354 +
- ML19325D730 +
- ML19325D562 +
- ML19325D547 +
- ML19324B323 +
- ML19324B318 +
- ML19325E299 +
- ML19325E292 +
- ML19325E221 +
- ML16152A864 +
- ML19327A988 +
- ML20058J626 +
- ML20265E306 +
- ML20203J570 +
- ML20059G217 +
- ML20011D108 +
- ML20012B986 +
- B13386, Forwards Millstone Nuclear Power Station Unit 3 Inservice Insp Summary Rept, Per 10CFR50.55a(g) & ASME Code Section XI,IWA-6230 +
- 05000369/LER-1989-025, :on 890918,jumper Came Loose & Inadvertently Made Contact W/Sliding Link B-14 Directly Above Link B-15, Resulting in Turbine Driven Feedwater Pump Automatically Starting.Caused by Inappropriate Action +
- ML19354E870 +
- ML20011D100 +
- ML20012D378 +
- ML20029E209 +
- ML19332E223 +
- ML19332D668 +
- 05000254/LER-1989-016-02, :on 890921,during Transfer of New Fuel,Fuel Assembly Released from Refueling Grapple & Fell Upon Spent Fuel Racks.Caused by Personnel Error & Procedural Deficiency.Fuel Handling Procedures Revised +
- ML19327B141 +
- ML19327B284 +
- ML19327A949 +
- ML19327B244 +
- 05000333/LER-1989-016, :on 890918,scram Signal Automatically Initiated During Transfer of Power Supply for Reactor Protection Sys. Caused by Lack of Caution Statement in Procedure.Procedure Revised to Add Time Caution for Bus Transfers +
- 05000311/LER-1989-015-02, :on 890918,discovered That Channel Calibr for Containment Wide Range Pressure post-accident Channels Not Done within Required Time Frame.Caused by Weak Tech Spec Amend Implementation in 1987.Process Upgraded +
- ML19327B222 +
- LD-89-114, Provides Addl Info Re Assumptions Made in Performing 890615 Analysis of CE-250-2 Shipping Container,Per NRC 890817 request.C-E Requires Only Certificate of Compliance for CE-250-2 Container.Details of Stated Evaluation Encl +
- ML19327A922 +