Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000361/2010403 +
- TAC:ME5091 +
- ML103560456 +
- ML101720311 +
- ML103560422 +
- TAC:ME5217 +
- ML103560435 +
- TAC:ME5215 +
- TAC:ME4999 +
- ML103500190 +
- TAC:ME5192 +
- ML103500180 +
- TAC:ME5341 +
- ML103510315 +
- ML103490867 +
- ML13004A230 +
- ML11143A069 +
- RNP-RA/11-0028, Off-Site Dose Calculation Manual, Revision 32 +
- ML110190458 +
- L-10-201, License Amendment Request to Revised Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-460, Revision 0 +
- L-2010-031, Re-Submittal of the 2009 Annual Radioactive Effluent Release Report +
- L-10-200, License Amendment Request to Modify Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-222-A, Revision 1 +
- L-10-339, Submittal of November 2010 NPDES Discharge Monitoring Report +
- CP-201001545, Relief Request No. B-10 for the Unit 1 Second 10 Years ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000) +
- CP-201001546, Relief Request No. B-11 for the Second 10 Years ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000) +
- CP-201001544, Relief Request No. C-9 for the Second 10 Year Interval from 10 CFR 50.55a Inspection Requirements Due to Hardship (Second Interval Start Date: August 13, 2000) +
- CP-201000890, Relief Request No. C-7 for the Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000) +
- CP-201000889, Relief Request No. C-6 for Unit 1 Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000) +
- L-2010-259, St. Lucie, Unit 1 - License Amendment Request Extended Power Uprate, Attachment 8; 10 CFR 50.63 Station Balckout DC Coping +
- ML103560453 +
- L-2010-259, St. Lucie, Unit 1 - Extended Power Uprate Licensing Report, Attachment 7; Summary of Regulatory Commitments +
- ML103560452 +
- L-2010-259, St. Lucie, Unit 1 - Extended Power Uprate Licensing Report, Attachment 5; Appendix I, Holtec Criticality Analysis Reports +
- ML103560450 +
- L-2010-259, St. Lucie, Unit 1 - Extended Power Uprate Licensing Report, Attachment 5; Appendix H, Grid Stability Analysis and System Impact Study with Proposed EPU +
- ML103560449 +
- L-2010-259, St. Lucie, Unit 1 - Extended Power Uprate Licensing Report, Attachment 5; Appendix F, Caldon Ultrasonics Engineering Reports +
- ML103560443 +
- L-2010-259, St. Lucie, Unit 1 - Extended Power Uprate Licensing Report, Attachment 5; Appendix E, Supplement to Licensing Report Section 2.4.1 Reactor Protection, Engineered Safety Features Actuation and Control Systems +
- ML103560442 +
- L-2010-259, St. Lucie, Unit 1 - License Amendment Request Extended Power Uprate, Attachment 9; Core Operating Limits Report (Colr) Markups +
- ML103560441 +
- L-2010-259, St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 2; Supplemental Environmental Report +
- L-2010-259, St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix B, Additional Codes and Methods +
- ML103560431 +
- L-2010-259, St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix a, Safety Evaluation Report Compliance +
- ML103560430 +
- L-2010-259, St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 4; Technical Specifications Bases Markups +
- ML103560428 +
- L-2010-259, St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages +