Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Information Notice 1994-75, Minimum Temperature for Criticality +
- ML20080A428 +
- ML20079S267 +
- ML20079B239 +
- ML20078P350 +
- ML20078C991 +
- ML20078C361 +
- ML20078C347 +
- ML20078C316 +
- ML20078B816 +
- ML20078B337 +
- ML20076K130 +
- ML20076K081 +
- ML20076K063 +
- ML20076H575 +
- ML20076H553 +
- ML20076H225 +
- ML20076H019 +
- ML20076G857 +
- ML20076G417 +
- ML20076G395 +
- ML20076G366 +
- ML20076G277 +
- ML20076G272 +
- NRC-94-0099, Forwards Summary Description of Changes to QA Program as Result of Rev 6 to UFSAR +
- ML20076G199 +
- ML20076F902 +
- ML20101B795 +
- ML20149K745 +
- ML20149G561 +
- PNO-I-94-057, on 941014,portable Moisture/Density Gauge Containing Two Sealed Sources W/Approximately 9 Mci of Cs-137 & 50 Mci of Am-241 Had Been Stolen from Construction Site in Bristol,Ct.Region I Will Follow Recovery of Gauge +
- ML20149G484 +
- ML20149G414 +
- ML20149G277 +
- ML20149G249 +
- SVP-94-048, Forwards Response to Violations Noted in Insp Repts 50-456/94-18 & 50-457/94-18.Response Withheld +
- NRC-94-4321, Forwards Two Plots Showing Results Obtained from AP600 Test Performed at SPES-2 Test Facility in Piacenza,Italy on 940922.Plots Withheld (Ref 10CFR2.790). Proprietary Portion of Document Sent to Westinghouse +
- LIC-94-0177, Forwards Addl Info Requested to Assist in Closure of NRC GL 89-10 at Fort Calhoun Station +
- NRC-94-4317, Forwards Proprietary Preliminary Rept LTCT-T2R-061, Quick Look Rept for Osu Matrix Test LTC21 AP600 Test Program. Proprietary Rept Withheld (Ref 10CFR2.790) +
- NRC-94-4316, Forwards Proprietary Rev 0 to PSX-T2R-031, Quick Look Rept for SPES-2 Matrix Test S01211 (Blind Test) AP600 Program. Rev 0 to PSX-T2R-031 Rept Withheld (Ref 10CFR2.790). Proprietary Portion of Document Sent to Westinghouse +
- RC-94-0267, Responds to Violations Noted in Insp Rept 50-395/94-19. Corrective Actions:Sys Operating Procedure 119, Waste Gas Processing, Revised on 940902 to Verify Proper Position of Sys Valves Prior to Tank Release +
- B15008, Provides Response to Violations Noted in Insp Rept 50-423/94-21.Corrective Actions:Review of Design Documents Indicates That Groundwater Observations Made at Site Prior to & During Const +
- RBG-40935, Responds to Violations Noted in Insp Rept 50-458/94-18. Corrective Actions:Relief Valve 1E22 RVF039 Was Verified to Have Been Seated & Leak Tight by Evidence of Sys Pressure Observed on Other Valves within Test Boundary +
- U-602355, Revises 940812 Application for Amend to License NPF-62, Revising TS 3/4.6.2.2, Drywell Bypass Leakage, to Incorporate NRC Recommendation of five-yr Drywell Bypass Leakage Test (Dblrt) Instead of 10-yr Dblrt +
- ML20076H636 +
- BECO-LTR-94-112, Endorses Comments Submitted by Nuclear Energy Inst in Re NRC Pilot Program for NRC Recognition of Good Performance by Nuclear Power Plants +
- PY-CEI-NRR-1864, Amends 940930 Response to GL 89-10,Suppl 5 Re Inaccuracies Associated W/Mov Diagnostic Equipment,To Include Info Obtained as Result of Program Development & Testing Activities +
- ML20265B869 +
- ML20210K168 +
- ML20203E095 +