Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17262A297 +
- ML17262A295 +
- ML17262A293 +
- ML18057A705 +
- ML20069Q583 +
- ML20066F782 +
- ML20066F430 +
- ML20066F347 +
- ML20066F023 +
- ML20066E628 +
- ML20066E622 +
- LIC-91-0022, Responds to NRC 901114 Denial of Util 900221 Request for Exemption from 10CFR50,App R for Fire Area 34B (Upper Electrical Penetration Room).Schedule for Mod Re wide-range Nuclear Instrumentation Cable Will Be Sent by 910331 +
- ML20066E248 +
- ML20066E196 +
- ML20066D995 +
- ML20066D978 +
- ML20066D720 +
- ML20079B353 +
- ML20126B304 +
- NL-90-3123, Forwards Supplemental Info to 901026 Application for Amend to License NPF-2 Re RTD Bypass Elimination & Steam Generator Tube plugging.Leak-before-break Assessment for RCS Piping Also Encl +
- ML20248B425 +
- ML20248B388 +
- ML20247D030 +
- JAFP-91-0042, Responds to NRC Re Violations Noted in Insp Rept 50-331/90-22.Corrective Actions:Improved Technical Guidance for Noble Gas Monitoring Will Be Incorporated Into Radiological Survey Procedure +
- TAC:00421 +
- 05000259/LER-1990-020-01, :on 901214,480-volt Shutdown Board 1b de-energized When Normal Feeder Breaker Tripped. Investigation Underway.Operations Personnel Notified Immediately After Event +
- 05000336/LER-1990-022-01, :on 901115,svc Water Header cross-tie Valve, 2-SW-97A Found Open.Cause Unknown But Most Likely Due to Improper Positioning of cross-tie Valve.Procedures Will Be Changed & Valve Position Indication Enhanced +
- 05000265/LER-1990-013-07, :on 901214,torus Level Discovered Below Tech Spec Required Level.Caused by Procedure Deficiency.Procedure Qop 1000-18 Being Revised as Qcop 1000-18 & RCIC Procedures Will Be Revised +
- 05000369/LER-1990-035, :on 901101,loop Seal Piping to Each of Facility Pressurizer Code Safety Valves Insulated in Error.Possibly Caused by Mgt Deficiency or Inappropriate Action.Insulation Removed & Personnel Will Be Counseled +
- 05000285/LER-1990-028, :on 901214,investigation of Unknown RCS Leakage Identified Source as Installed Spare Control Element Drive Mechanism Housing 9.Caused by Lack of Venting Which Caused Igscc.Blank Flanges Installed +
- 05000333/LER-1990-027, :on 901215,reactor Scrammed During start-up Due to High Neutron Flux.Caused by Failure of Air Operator Diaphragm on Reactor Feedwater Low Flow Control Valve.Valve Repaired & start-up Procedure Revised +
- IR 05000057/1990004 +
- ML20029A008 +
- ML20029A656 +
- ML19332J223 +
- ML20029A300 +
- ML20029A589 +
- ML20029A349 +
- 05000280/LER-1990-019, :on 901218,all Six Main Feedwater Flow Transmitters Found Isolated,Equalized & Drained.Caused by Personnel Error.Policy Re Personnel Responsible for Performing Valve Manipulation Will Be Reviewed +
- IR 05000280/1990031 +
- ML18152A238 +
- ML18033B617 +
- IR 05000259/1990038 +
- IR 05000259/1990031 +
- ML18033B613 +
- L-91-021, Special Rept:From 901206 to 21,listed Fire Barriers,Doors, Detector Alarms,Manholes & Water Tanks Not Returned to Functional Status within 7 Days.Compensatory Measures Implemented +
- ML17305B332 +
- 05000389/LER-1990-006-04, :on 901219,inadvertent Actuation of Auxiliary Feedwater Equipment During Monthly Testing Occurred.Caused by Test Instrument Malfunction.Instrument & Control Procedure Revised +
- 05000389/LER-1990-006-03, :on 901219,inadvertent Actuation of Auxiliary Feedwater Sys Equipment Occurred During Monthly Functional Testing.Caused by Equipment Failure.Details of Event & Troubleshooting Plan Reviewed +
- ML17157A520 +