Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 41129 +
- IR 05000400/2004009 +
- IR 05000400/2002003 +
- IR 05000400/2001006 +
- ML13112A020 +
- ML13364A214 +
- HNP-17-003, License Amendment Request for Emergency Diesel Generator Surveillance Requirements Regarding Voltage and Frequency Limits and the Voltage Limit for Emergency Diesel Generator Load Rejection +
- ML14338A038 +
- ML14072A051 +
- ML14322A188 +
- HNP-15-006, Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) +
- ML15013A238 +
- HNP-14-086, Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) +
- HNP-14-043, License Amendment Request to Revise Technical Specification Table 3.3-4 Loss of Offsite Power 6.9 Kv Emergency Undervoltage Primary Setpoints +
- HNP-14-021, Planned Actions for Transformer Replacement +
- ML14030A102 +
- HNP-13-080, First Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) +
- HNP-13-035, License Amendment Request to Revise Technical Specification Table 3.3-4, Degraded Voltage Time Delay Values, Response to Request for Additional Information +
- HNP-13-024, Drawing CAR-2166-G-030, Rev. 20, 480 Volt Auxiliary One Line Wiring Diagram +
- HNP-12-119, Response to Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident +
- ML100410113 +
- ML100060485 +
- ML100060490 +
- ML18022A904 +
- ML18019A581 +
- ML18010A670 +
- ML18005A460 +
- HNP-06-032, Day Response to NRC Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power. +
- ML040790069 +
- ML20133K936 +
- RA-20-0223, Supplement to Application to Revise Harris Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b +
- ML20147A025 +
- ML18337A295 +
- IR 05000400/1986029 +
- HNP-94-090, Rept in Accordance w/10CFR50.59 for Period 930201-940711, Including Harris Plant Refueling Outage +
- IR 05000400/1986026 +
- ML18019A268 +
- ML16217A449 +
- ML19102A110 +
- ML18011A489 +
- ML061020109 +
- IR 05000400/2023002 +