Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17128A037 + (13:41:54, 9 January 2025)
- RS-17-054, Supplement to Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces (RS-16-049) + (13:41:56, 9 January 2025)
- ML17128A030 + (13:42:00, 9 January 2025)
- NMP1L3150, Independent Spent Fuel Storage Installation, Submittal of 2016 Radioactive Effluent Release Report + (13:42:03, 9 January 2025)
- DCL-17-030, 2016 Annual Quality Assurance Report for the Radiological Environmental Monitoring Program (REMP) + (13:42:05, 9 January 2025)
- ML17128A024 + (13:42:06, 9 January 2025)
- CAC:L60423 + (13:42:08, 9 January 2025)
- ML17128A001 + (13:42:09, 9 January 2025)
- ML17128A000 + (13:42:11, 9 January 2025)
- ML17125A341 + (13:42:12, 9 January 2025)
- ML17125A326 + (13:42:13, 9 January 2025)
- CAC:MF9584 + (13:42:14, 9 January 2025)
- ML17125A323 + (13:42:14, 9 January 2025)
- CAC:9544 + (13:42:15, 9 January 2025)
- ML17125A322 + (13:42:16, 9 January 2025)
- ML17125A321 + (13:42:17, 9 January 2025)
- ML17125A320 + (13:42:18, 9 January 2025)
- ML17125A318 + (13:42:19, 9 January 2025)
- ML17125A317 + (13:42:20, 9 January 2025)
- ML17125A305 + (13:42:21, 9 January 2025)
- ONS-2017-031, Emergency Plan Implementing Procedures Manual Volume 1, Revision 2017-002 + (13:42:27, 9 January 2025)
- ML17125A291 + (13:42:28, 9 January 2025)
- ML17125A289 + (13:42:33, 9 January 2025)
- ML17125A281 + (13:42:34, 9 January 2025)
- ML17125A266 + (13:42:36, 9 January 2025)
- NLS2017047, Preparation and Scheduling of Operator Licensing Examinations + (13:42:37, 9 January 2025)
- 05000298/LER-1917-001, Regarding Residual Heat Removal Minimum Flow Valves Out of Position Results in Loss of Safety Function and Condition Prohibited by Technical Specifications + (13:42:42, 9 January 2025)
- ML17125A257 + (13:42:44, 9 January 2025)
- ML17125A256 + (13:42:45, 9 January 2025)
- CP-201700256, Transmittal of Year 2016 Radiological Environmental Operating Report + (13:42:47, 9 January 2025)
- ML17125A254 + (13:42:50, 9 January 2025)
- ML17125A252 + (13:42:58, 9 January 2025)
- CAC:TM3111 + (13:42:59, 9 January 2025)
- ML17125A247 + (13:42:59, 9 January 2025)
- ML17125A245 + (13:43:01, 9 January 2025)
- CAC:MF8526 + (13:43:02, 9 January 2025)
- CNL-17-044, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.7.12, Auxiliary Building Gas Treatment System (Abgts), for Watts Bar Nuclear Plant, Units 1 and 2 + (13:43:03, 9 January 2025)
- IR 05000259/2017408 + (13:43:04, 9 January 2025)
- DCL-17-042, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations + (13:43:06, 9 January 2025)
- CNL-17-059, Notification of Changes to Emergency Response Data System + (13:43:07, 9 January 2025)
- ML17125A227 + (13:43:08, 9 January 2025)
- BW170043, Core Operating Limits Report, Cycle 20 + (13:43:10, 9 January 2025)
- ML17125A217 + (13:43:20, 9 January 2025)
- 05000327/LER-1916-009-01, Regarding Manual Reactor Trip During Startup Due to a Control Rod Misalignment + (13:43:22, 9 January 2025)
- ML17125A202 + (13:43:26, 9 January 2025)
- ML17125A196 + (13:43:29, 9 January 2025)
- ML17125A195 + (13:43:30, 9 January 2025)
- LR-N17-0099, Response to RIS-2017-03, Preparation and Scheduling of Operator Licensing Examinations + (13:43:31, 9 January 2025)
- Press Release-III-17-010, NRC Names New Resident Inspector at Bryon Nuclear Plant + (13:43:32, 9 January 2025)
- ML17125A152 + (13:43:33, 9 January 2025)
- ML17125A135 + (13:43:35, 9 January 2025)