Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17207A485 + (21:26:34, 8 January 2025)
- ML17207A483 + (21:26:35, 8 January 2025)
- 05000335/LER-1979-030, Forwards LER 79-030/01T-0 + (21:26:36, 8 January 2025)
- ML17207A478 + (21:26:38, 8 January 2025)
- ML17207A477 + (21:26:39, 8 January 2025)
- ML17207A475 + (21:26:40, 8 January 2025)
- ML17207A474 + (21:26:41, 8 January 2025)
- ML17207A473 + (21:26:42, 8 January 2025)
- ML17207A471 + (21:26:43, 8 January 2025)
- L-79-286, Notifies That Status Rept of Analyses Re Offsite Power Sys & Onsite Distribution Sys Will Be Submitted 791108,in Response to 790723,26 & 0808 Requests + (21:26:44, 8 January 2025)
- ML17207A470 + (21:26:44, 8 January 2025)
- L-79-287, Responds to NRC & IE Info Notice 79-22.Review of Postulated Interactions Indicates No Substantial Safety Hazard + (21:26:47, 8 January 2025)
- ML17207A460 + (21:26:48, 8 January 2025)
- L-79-282, Requests Amend of License DPR-67,App A,Tech Spec 5.3.1 Re Design Features.Class III Fee Encl + (21:26:49, 8 January 2025)
- ML17207A457 + (21:26:51, 8 January 2025)
- ML17207A456 + (21:26:55, 8 January 2025)
- ML17207A455 + (21:26:56, 8 January 2025)
- L-79-274, Responds to NRC 790723 & 0801 Ltrs Re Proposed Amend to OLs Adding License Requirement to Establish & Implement Secondary Water Chemistery Monitoring Program.Program Tends to Reduce Outage Times & Repair Costs + (21:26:57, 8 January 2025)
- L-79-280, Forwards Fire Protection Info Re Preliminary Schedule Mod, Fire Pump Controller Evaluation & Cable Area Evaluation in Response to NRC + (21:26:59, 8 January 2025)
- L-79-266, Responds to IE Bulletin 79-18, Audibility Problems Encountered W/Evacuation of Personnel from High-Noise Area. Situation at Plant Assessed.Existing Sys Provided Assurance of Timely Personnel Evacuation + (21:27:01, 8 January 2025)
- L-79-264, Forwards Response to IE Bulletin 79-14.Requests Defferal of Portion of Insp Re Inaccessible Areas Because of Low Defect Rate in Hanger & Restraints + (21:27:03, 8 January 2025)
- ML17207A450 + (21:27:03, 8 January 2025)
- L-79-175, Forwards Revised Response to IE Insp Rept 50-389/79-01.FCR 2-434 Has Been Added to All Controlled Copies of Drawing 2998-G-517,Revision 1 & Frc 2-557 Has Been Removed.New Document Control Supervisor Has Been Acquired + (21:27:05, 8 January 2025)
- ML17207A443 + (21:27:05, 8 January 2025)
- L-79-250, Responds to IE Bulletin 79-15, Deep Draft Pump Deficiencies. Four Byron Jackson Model 37KXL Single Stage Vertical Circulation Pumps Used in Intake Cooling Water Sys. No Major Problems Encountered During Startup or Testing + (21:27:07, 8 January 2025)
- ML17207A440 + (21:27:09, 8 January 2025)
- L-79-249, Forwards Response to IE Bulletin 79-15,Deep Draft Pump Deficiencies. Three Byron Jackson safety-related Vertical Pumps to Be Used as Intake Cooling Water Pumps Will Be Delivered in mid-1980 + (21:27:10, 8 January 2025)
- ML17207A438 + (21:27:12, 8 January 2025)
- L-79-256, Requests Revision of Response to Item 4 of IE Bulletin 79-06C to Include Specified Text Re Revision of Emergency Procedures + (21:27:13, 8 January 2025)
- ML17207A436 + (21:27:13, 8 January 2025)
- L-79-270, Responds to 790821 & 29 Ltrs Re Request to Commit to five- Man Fire brigade.Three-man Brigade Considered Sufficient. Proposed Regulation Will Be Commented on After Publication in Fr.Addl Comments on Encls to Ltrs Will Follow + (21:27:15, 8 January 2025)
- L-79-240, Forwards Response to IE Bulletin 79-06C, Nuclear Incident at TMI - Suppl + (21:27:17, 8 January 2025)
- L-79-236, Forwards Response to Items 1 & 5 of IE Bulletin 79-17, Pipe Cracks in Stagnant Borated Water Sys at PWR Plants + (21:27:18, 8 January 2025)
- L-79-203, Forwards Info Re Ability to Respond to Unusual Events,In Response to 790629 Request + (21:27:20, 8 January 2025)
- IR 05000335/1979017 + (21:27:22, 8 January 2025)
- ML17207A427 + (21:27:24, 8 January 2025)
- ML17207A428 + (21:27:24, 8 January 2025)
- IR 05000389/1979011 + (21:27:26, 8 January 2025)
- ML17207A423 + (21:27:28, 8 January 2025)
- IR 05000389/1979013 + (21:27:29, 8 January 2025)
- ML17207A417 + (21:27:30, 8 January 2025)
- ML17207A414 + (21:27:31, 8 January 2025)
- L-79-238, Forwards Suppl Response to IE Bulletin 79-10 Re Number of Operators Attending Requalification Lectures.Attendance Now Required at Lectures + (21:27:32, 8 January 2025)
- 05000335/LER-1979-027, Forwards LER 79-027/03L-0 + (21:27:35, 8 January 2025)
- L-79-222, Forwards Addl Response to NRC Ltr Re Violations Noted in IE Insp Rept 50-389/79-07.Corrective Actions:Deposited Weld Metal Thickness for Each Process Used Will Be Measured & Recorded + (21:27:36, 8 January 2025)
- ML17207A406 + (21:27:36, 8 January 2025)
- ML17207A403 + (21:27:38, 8 January 2025)
- ML17207A394 + (21:27:39, 8 January 2025)
- IR 05000335/1979016 + (21:27:41, 8 January 2025)
- ML17207A391 + (21:27:42, 8 January 2025)
- ML17207A390 + (21:27:44, 8 January 2025)