Forwards IE Insp Rept 50-335/79-17 on 790807-10.No Noncompliance Noted
ML17207A428
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 08/24/1979
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Uhrtg R
FLORIDA POWER & LIGHT CO.
Shared Package
ML17207A429 List:
References
NUDOCS 7910010130
Download: ML17207A428 (2)


See also: IR 05000335/1979017

Text

y

vga RECIj(

0O

4~

~O

++*++

In Reply Refer To:

RII:ALC

50"335/79-17

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

AUG 24

1979

Florida Power and Light Company

Attn:

R. E. Uhrig, Vice President

Advanced

Systems

and Technology

Post Office Box 529100

Miami, Florida

33152

Gentlemen:

This refers to the inspection

conducted

by A. L. Cunningham of this

office on August 7-10,

1979 of activities authorized

by NRC License

No. DPR-67 for the St. Lucie Nuclear Power Plant facility, Unit No. 1,

and to the discussion of our findings held with C.

M. Wethy at the

conclusion of the inspection.

Areas

examined during the inspection

and our findings are discussed

in

the enclosed

inspection report.

Within these

areas,

the inspection

consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observations

by the inspectors.

Within the scope of this inspection,

no items of noncompliance

were

disclosed.

In accordance

with Section 2.790 of the NRC's "Rules of Practice",

Part 2, Title 10,

Code of Federal Regulations,

a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document

Room. If this report contains

any information that you (or

your contractor) believe to be proprietary, it is necessary

that you

make

a written application within 20 days to this office to withhold

such information from public disclosure.

Any such application must

include

a full statement

of the reasons

on the basis of which it is

claimed that the information is proprietary,

and should be prepared

so

that proprietary information identified in the application is contained

in a separate

part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document

Room.

AUG 24

~gyp

Florida Power and

Light Company

Should you have any questions

concerning this letter,

we will ge glad to

discuss

them with you.

~ Sincerely,

J. T. Sutherland,

Chief

Fuel Facility and Materials

Safety Branch

Enclosure:

Inspection Report No. 50-335/79-17