Forwards IE Insp Rept 50-389/79-11 on 790717-20.No Noncompliance Noted
ML17207A423
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 07/30/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17207A424 List:
References
NUDOCS 7909280552
Download: ML17207A423 (3)


See also: IR 05000389/1979011

Text

1P.R REGIj,

(4

fp0

~~a

+**+~

In Reply Refer To:

RII:TEB

50-389/79-11

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

JUL 30 1979

Florida Power and Light Company

ATTN:

R. E. Uhrig, Vice President

Advanced Systems

and Technology

P. 0. Box 529100

Miami, FL

33152

Gentlemen:

This refers to the inspection

conducted

by T. E. Burdette of this office on

July 17-20,

1979, of activities authorized by NRC Construction Permit No. CPPR-114

for the St. Lucie Unit 2 facility, and to the discussion

of our findings held

with BE J. Escue at the conclusion of the inspection.

Areas

examined

during the inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

/

Within the scope of this inspection,

no items of noncompliance

were disclosed.

We have

examined

actions

you have

taken with regard to previously identified

enforcement matters.

These are discussed in the enclosed inspection report.

One

new unresolved

item resulted

from this inspection

and is discussed

in the

enclosed report.

This item willbe examined during subsequent

inspections.

r

In accordance

with Section 2.790 of the NRC's "Rules of Practice",

Part 2, Title

10,

Code of Federal Regulations,

a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document

Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary

that you make

a written application within 20 days to this office to

withhold such

information from public disclosure.

Any such application

must

include

a full statement

of the reasons

on the basis of which it is claimed that

the

information is proprietary,

and

should

be

prepared

so that proprietary

information identified in the application is contained in a separate

part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

~~09280am>

Florida Power and Light Company

JUL 30 ~>>

Should you have

any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

Charles

E. Murphy

hief

Reactor Constru

ion and Engineering

Support Branch

Enclosure:

Inspection Report No. 50-389/79-11

cc w/encl:

C.

M. Wethy, Plant Manager

P. 0.

Box 128

Ft. Pierce,

FL

33450

Nat Weems, Assistant

gA Manager

P. 0.

Box 128

Ft. Pierce,

FL

33450